21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*

Slides:



Advertisements
Similar presentations
INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status.
Advertisements

E951 POWER SUPPLY 5/13/02 IOANNIS MARNERIS Brookhaven National Labs.
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Examples of Input/output wiring Diagram. ControlLogix IB32 DC Input Module Connection (Sinking)
ATF2 Power Supply Availability Comparison February 5, ATF2 Power Supply Availability C0mparison Paul Bellomo and Briant lam.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
15 December ATF2 High Availability DC Magnet Power Supplies – Commissioning Status By: Paul Bellomo, Antonio de Lira, Briant Lam* and David MacNair.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
LCLS Injector Power Supplies July 28, LCLS Injector Power Supplies for Purchase Paul Bellomo, Antonio de Lira, Dave Mac Nair.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 Power Supply Hazard Analysis Summaries P. Bellomo,
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 New Power Supplies Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
19-21 Dec 20075th ATF2 Project Meeting1 Power Supply Progress and Magnetic Field Stability Summary By: Masayuki Kumada (NIRS) and Briant Lam* (SLAC)
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
LCLS Injector Intermediate Power Supply Design Review August 29, LCLS Intermediate Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
LCLS Sector 24 QE Magnet Power Supplies January 12, LCLS Sector 24 Power Supplies For QE Magnet Splits Paul Bellomo, Antonio de Lira, Dave Mac Nair.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
Connecting the cRIO to the 12 V power source and your computer
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
31, LCLS Maintenance Personnel and Procedures Paul Bellomo.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
ELENA installation progress F. Butin / ELENA collaboration.
Cryogenic Plant Electrical and Controls
ILC RTML Meeting EDR Planning for Magnet Power Systems
LCLS-II 2K Cold Box Controls Design Review
ATF2 Magnet Power Supplies
AIP /02 P Bellomo - QE Magnet Power System Upgrade
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Magnet PS Controls Hardware Status
Injector, Sector 21 and BC1 Bulk Power Supplies
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Magnet Controls K. Luchini
DOE Review 11 May 2005 Stephen A. Lewis
PLC Front Panel.
CHIC: Possibilities of Supply
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Project Grey Wolf Digital CMOS “Memory” Game
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*

21 March 2007ATF2 Power Supplies Topics Current Progress –Purchased Parts Pending Items Commissioning Schedule –With everything ready –Without magnets

21 March 2007ATF2 Power Supplies Schedule

21 March 2007ATF2 Power Supplies Purchased Parts Power Supplies: –OCEM HA Power Supplies - September 2007 Received schematics on 16 March 2007 Bulk Power Supplies: –Lambda-EMI ESS 40V 250A - May 2007 Ethernet Power Supply Controllers –SLAC - June 2007 Racks –Out for bid (Build to print) - May 2007 PLC –Allen Bradley ControlLogix - May 2007

21 March 2007ATF2 Power Supplies Pending Purchase Cables –Intra-rack Control Cables –Intra-rack Power Cables Fans –Pending design –Suggestions from OCEM

21 March 2007ATF2 Power Supplies Pending Items System Drawings –Rack Layout –Power Systems Wiring Diagram –PLC Chassis Assembly –Starts after Racks are received Test –Starts after Assembly

21 March 2007ATF2 Power Supplies Commissioning Schedule

21 March 2007ATF2 Power Supplies Commissioning Schedule (Two steps if magnets are not ready)