Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.

Slides:



Advertisements
Similar presentations
LCWS12 Arlington October 22-26, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.
Advertisements

Beam test of Linear Collider TPC Micromegas module with fully integrated electronics * D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris,
Overview of the read-out electronics for the TPCs at T2K ND280m P. Baron, D. Calvet, X. De La Broïse, E. Delagnes, F. Druillole, J-L Fallou, J-M. Reymond,
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
P. Colas on behalf of LCTPC Frontier detectors for frontier physics 12 th Pisa meeting on advanced detectors Isola d’Elba, May 2012.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Micromegas Panels LP electronics P. Colas. Foreword We aim at 1 single system –Same DAQ : easier comparison, less duplicate work We have to keep in mind.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin, R. Woods TPC Tests Analysis Meeting, DESY 28 May 2009.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Wide-frame view on Saclay LCTPC activities P. Colas.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Micromegas projects and future tests Phone meeting August 26th, 2009.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
P. Colas D. Attié, P. Colas, I. Giomataris, W. Wang (Irfu) M. Dixit, N. Shiell, P. Hayman (Carleton U.) G. De Lentdecker (Brussels)
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
Architecture and Implementation of the Front-End Electronics of the Time Projection Chambers in the T2K Experiment P. Baron, D. Besin, D. Calvet, C. Coquelet,
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
Beam test Analysis Micromegas TPC by Wenxin Wang.
A Micromegas TPC for the ILC. 2 Introduction: Micromegas & TPC I. Micromegas ILC-TPC ILC & LP-TPC Beam test with Micromegas modules Test bench Ion backflow.
Carleton University & TRIUMF
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Micromegas modules achievements and plans
Large TPCs for HEP ILC-TPC & Fast Neutron detector
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Large Area Endplate Prototype for the LC TPC
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
T2K TPC Micromegas Prototype: Test Results on Harp setup
Power pulsing of AFTER in magnetic field
Micromegas module for ILC-TPC
TPC electronics for ILD
TPC Large Prototype Toward 7 Micromegas modules
Recents Analysis Results From Micromegas TPC
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
in a high intensity beam
a TPC with resistive Micromegas
News from Micromegas modules
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Covering a Large Area ILC-TPC endplate
News from Micromegas modules
Presentation transcript:

Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S. Lhénoret, I. Mandjavidze, M. Riallot, S.Turnbull, Yun-Ha Shin, W. Wang, E. Zonca Phone meeting 20/1/2011

Jan 21, 2011 Micromegas 2 Phase 2: Fully integrated 7 modules Goal: Fully equip 7 modules with more integrated electronics, still based on the T2K AFTER chip. -Fit the electronics in 3 cm behind the modules - Make a backend able to read up to 12 modules - Go to fully ILC-compatible DAQ - New zero-suppression scheme - Air cooling - Multi-module software: alignment - quasi-industrial production and quality check of 9 modules (in clean room at CERN used by T2K)

Jan 21, 2011 Micromegas 3 FLAT ON THE BACK OF THE MODULE 7 modules & New T2K Electronics Test 1 module with full chain early Build in a quasi-industrial process 9 modules in 2011, and characterize them. Perform multi-module tests in 2012 and following years. Use the same cards for a power-pulsing test in the DESY 5T magnet.

Jan 21, 2011 Micromegas 4 How to cover a large area? Multimodule Module size : not too large : capacitance, flatness not too small : alignment, cost-effective maintenance, lower dead space, lower mechanical overhead. Development is also modular

Functionalties → Receives clock, trigger and data flow controle and distributes them to FEMs (up to 12) by optical fibres → Concentrates data from 12 FEMs and send them to DAQ Interfaces → 12 2-Gbit/s optical links → DAQ – Slow Control 1-Gbit/s link → fast Trigger – Clock link Back End Jan 21, Micromegas

Jan 21, 2011 Micromegas 6 Back End ready tested since June 2010 With up to 12 FEM cards (old and new) Fully tested up to DAQ with 1 old FEM and 6 old FECs

Jan 21, 2011 Micromegas 7 Front End Mezzanine (module card) 24 rows x 72 columns ~ 3x7 mm 2 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector FPGA Xilinx V5 ADC SRAM Optical connector Test Pulser Xilinx Prom One per module, 1728 channels.Gathers the signals from 6 FECs and sends them to the Back End with optical links

Jan 21, 2011 Micromegas 8 Front End Mezzanine Status : 2 prototype cards ready and tested: fully operationnal

Jan 21, 2011 Micromegas 9

Front-End Cards Naked chip on board High density connectors Power dissipation opposite to gas volume Jan 21, Micromegas Status : 8 cards ordered, being built 1 received

Jan 21, 2011 Micromegas 11

Jan 21, 2011 Micromegas 12

Jan 21, 2011 Micromegas 13 New detector module 24 rows x 72 columns ~ 3x7 mm 2 Based on experience from single-module tests: Same pattern, but routing adapted to new flat connectors. New via filling technique. Use CLK with 2-3 Mohm/square resistivity New grounding of the resistive foil on the sides of the modules, by metallization: no dead space. Back from the PCB maker these days. Being equipped with a resistive bulk at CERN workshop.

Jan 21, 2011 Micromegas 14 Multi-module Software Display program GEAR-integrated geometry with free translations and rotation angles w.r.t. central module Track reconstruction and fitting by Kahlman filter, integrated in Marlin TPC Simulation integrated in Marlin TPC Analysis (study of resolution and distortions, correction for non- uniformity) integrated in Marlin TPC

Jan 21, 2011 Micromegas 15 Power pulsing test with Saha and Carleton in the 5T magnet Goal : check that 55Fe parameters are stable with power pulsing (both on mesh readout and pad readout) and study mechanical effects in high B field.