Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008.

Slides:



Advertisements
Similar presentations
Maintenance system and technology used in FMI´s observation network Jani Gustafsson Introduction FMI´s observation network.
Advertisements

T.R. THE MINISTRY OF ENVIRONMENT AND FORESTRY
CS CS 5150 Software Engineering Lecture 12 Usability 2.
The Logistic Requirements for Wave Field Measurement Prof. Dr.-Ing. Chia Chuen Kao Director, Coastal Ocean Monitoring Center, National Cheng Kung University.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Operational Quality Control in Helsinki Testbed Mesoscale Atmospheric Network Workshop University of Helsinki, 13 February 2007 Hannu Lahtela & Heikki.
SONG – Stellar Observations Network Group - The robotic software for the SONG network S.Frandsen 1, Eric Weiss 1, J. Skottfelt 2, M.F. Andersen 1, F.Grundahl.
Axis Intelligent Video Intelligence where you need it.
Warning dissemination using an existing platform and community automatic weather station ESCAP/WMO Typhoon Committee 5th integrated Workshop 6-10September.
Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.
Mr. Rainer Dombrowsky (USA) TECO WMO Technical Conference on Meteorological and Environmental Instruments and Methods of Observation St. Petersburg,
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Measurements at MeteoSwiss and its application for.
GOES Users’ Conference The Role of Geostationary Satellites in WMO’s Global Observing System Dr. Donald E. Hinsman Senior Scientific Officer WMO Satellite.
VIKING Workshop Best practices on monitoring deployment Jérôme FERRE –- p. 1 Enhancing Data Quality Jérôme FERRE Société des Autoroutes Paris-Normandie.
Chapter 10.
Meteorological Observatory Lindenberg – Richard Assmann Observatory The GCOS Reference Upper Air Network.
WMO Climate-relevant operational Metadata Peer Hechler, Omar Baddour WMO; WIS DMA.
WMO CIMO in 2014: Continuing to show joint leadership on WIGOS Bertrand Calpini ICG WIGOS co-chair ICG-WIGOS-4, Feb 2015.
1 T.C. TURKISH STATE METEOROLOGİCAL SERVICE DEPARTMENT OF RESEARCH AND INFORMATION TECHNOLOGIES METEOROLOGICAL DATA MANAGEMENT Mustafa Sert October 2011.
My Resource for Excellence. Canadian Heritage Information Network Creation of the Collections Management Software Review (CMSR) Heather Dunn, CHIN.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
IODE Ocean Data Portal - technological framework of new IODE system Dr. Sergey Belov, et al. Partnership Centre for the IODE Ocean Data Portal MINCyT,
TECO Geneva1 Integrated Quality Control Functions on AWS-Level Gealog SG Station Manager Gerhard Pevny, Logotronic GmbH, Austria Dietmar Pindeus,
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Page 1© Crown copyright 2004 Quality Management of a European Wind Profiler Network (CWINDE) Tim Oakley TECO-05 Bucharest, 4 th -7 th May.
1 Global Systems Division (GSD) Earth System Research Laboratory (ESRL) NextGen Weather Data Cube Chris MacDermaid October, 2010.
An Integrated Meteorological Surface Observation System By Wan Mohd. Nazri Wan Daud Malaysian Meteorological Department Due to the increasing and evolving.
1 Mexico Regional AMDAR Workshop November 2011 Data Quality Monitoring and Control (QM / QC) Axel Hoff Convenor of WMO AMDAR Panel‘s Science and Technical.
11 March 2013 Tim Oakley, GCOS Implementation Manager WIGOS TT Metadata Global Climate Observing System.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Australian Bureau of Meteorology Station Metadata “SitesDb” Karl Monnik Technical & Field Support Observations & Engineering Program.
Software quality factors
Module 4: Systems Development Chapter 14: Design And Implementation.
Review of Meteorological Data Sharing Project in China Anyuan XIONG (National Meteorological Information Center, CMA, CHINA)
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
WMO TECHNICAL CONFERENCE ON METEOROLOGICAL AND ENVIRONMENTAL INSTRUMENTS AND METHODS OF OBSERVATION TECO-2008 ______________________________________________________________.
Meteorological Observatory Lindenberg Results of the Measurement Strategy of the GCOS Reference Upper Air Network (GRUAN) Holger Vömel, GRUAN.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Saad Haj Bakry, PhD, CEng, FIEE 1 Network Management Support Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Meteorological Observatory Lindenberg – Richard Assmann Observatory (2010) GCOS Reference Upper Air Network Holger Vömel Meteorological Observatory Lindenberg.
Deutscher Wetterdienst Lindenberg Meteorological Observatory Richard Assmann Observatory Michael Sommer GRUAN Lead Centre, DWD 2 nd GRUAN Implementation.
AGACC II: WP3: Aerosol properties and radiative forcing at Uccle Veerle De Bock Royal Meteorological Institute of Belgium
Carshena Gordon, Meteorologist Haime Pieter, BSc Engineering, Meteorological Department of Curaçao & St. Maarten
Zhumei MIAO China Session 3 – Block 1.4 – Question Z Barcelona May DEVELOPMENT AND APPLICATION OF THE REACTIVE POWER & VOLTAGE REAL TIME MONITORING.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Page 1 MDE Profiler Ft. Meade, Maryland MARAMA Monitoring and Profiler Meeting October 24, 2001 Atlantic Sands Hotel - Rehoboth Beach, DE Maryland Department.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
ATMeye.iQ Video security monitoring and dispute management solution ATMeye.iQ.
The Last Mile: Saving lives, improving livelihoods and increasing resiliency with tailored weather information services Dr. Bonizella Biagini CIRDA Manager.
Metadata V1 By Dick M.A. Schaap – technical coordinator Oostende, June 08.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
IODE Ocean Data Portal - technological framework of new IODE system Dr. Sergey Belov, et al. Partnership Centre for the IODE Ocean Data Portal.
System Design, Implementation and Review
Inspection and test data analysis
Fundamentals of Information Systems, Sixth Edition
Data Flows in ACTRIS: Considerations for Planning the Future
Regional Basic Observing Network Concept
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
GSICS Data Management and Availability to Users
CIMMS – Network Survey Vehicle
Mareile Wolff1 with input from Cristian Lussana2 and Thomas Nipen3
Regional WIGOS Centre Tokyo
AWS Network Requirements Analysis and Network Planning
Jemal Mohammed WMO RA I WORKSHOP ON AUTOMATIC WEATHER STATION (AWS) NETWORKS STRENGTHNING AND MODERNIZING OBSERVING SYSTEMS IN AFRICA,
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008

The quality guarantee of meteorological observation needs to establish effective management system. –equipment installation –compatibility –sitting and exposure –performance monitoring –calibration –maintenance, metadata –real-time quality control

In China, there is a great observation network used in weather and climate observation national AWSs 158 Doppler weather radars 120 upper-air soundings And others

Real-time Observation Monitoring and Analysis Network Meteorological Observation Centre, CMA established monitoring and analysis system, began to monitor the observation on real-time, and outputted the analysis products. –In 2006, the system has began to develop. In 2007, the version 1.o was finished. –It includes equipment performance monitoring, data quality monitoring and maintenance information management –It is for automatic weather station, upper air sounding system and Doppler weather radar. The operational experiment was done in 2007 and 2008, and improved the operation quality and achieved good benefits.

The system structure The system structure has been designed as “2-level”, national and provincial system: –National system accepts data from provincial system. –The provincial system is responsible for collecting information. 2-level system exchanges data based on request- service or real-time.

Software structure C/S and B/S models are used –C/S is taken to data processing, and B/S is for users. –Data processing uses VC++ and ORACLE to establish C/S structure for data collecting, processing and evaluating. –User system adopts J2EE combined with WEBGIS and ORACLE.

(1) Performance and parameter monitoring Performance and parameter monitoring –parameter, alarm and failure data It forms a closed cycle from information collecting, processing, data statistic and feedback.

Status and parameter display Parameter checking Failure parts analyzingStatus in time series

Radar status is displayed with weather forecast Technician could pay more attention to severe weather areas

Before a typhoon arriving, the lower power is found at YANGJIAN radar, so the technician recover it in time. It helps to check radar, a klystron was replaced in 2006

Data quality monitoring Real-time data quality monitoring checks and analyzes: –File format –Extremum –Space-time consistency –Environment changes supervision –Reliability indexes The data quality monitoring is used to –Guide the maintenance technicians to find failure in time –Offer evidences to hardware and software updating for decision- makers. –Evaluate data quality.

AWS data quality evaluation The data has be displayed as 4 levels : –0 : normal –1 : usable –2 : alarm –3 : false Based on statistic, it tell us the ground temperature has more problems

Guiding to maintenance Discontinuous Conflicting Data Invariable DataInconstant varying

CINRAD Data Quality Radar Data Quality Assistance Efforts –Hotline Technicians Monitor Continuously –Technical Assistance Group Monitors –Tools Used Unedited National Mosaic Radar Reflectivity Comparison New algorithms will be developed for reducing technician watching, but there are difficulties in auto- check.

Upper air WTH are compared with threshold, the abnormal data is recorded and putted into database, then statistics can be displayed. Technician can pay more attention to the larger number. Upper air sounding data check

Observation information management Instruments and parts have IDs number. Observation information management includes –Log on duty –Repair record –Validity of calibration –Logistics –Station environment pictures and cameras

Observation environment protection Station environment pictures and cameras –8-azimuth pictures –Updated in half-year. –Video is based on WEB users. It is also used to observe weather phenomena.

Evaluation indexes There are 3 indexes : Reliability (R) = T1/T, Availability (A) = (T1 + T2)/T Failure (F)= (T3+T4)/T T is for all time, T1 normal time, T2 usable time,T3 alarm T4 for failure.

The radar availability are 89.49%, 95.3%, 96.2% from June to August in AWS alarms and error is going down

It is being done: –GPS/MET, lightning, Profiler, etc, will be monitored. –QC algorithm will be developed further, for example, Radar QC, AWS QC,etc. –Trainning technician. After testing the system will be used in most provinces Based on the statistics some problems are found, so the software and hardware are being updated.

THANKS