30 May 2013CMS M&O-B Scrutiny1 Salvatore Costa - Catania CMS M&O-B Scrutiny, CERN, 30 May 2013 Tracker.

Slides:



Advertisements
Similar presentations
Statement of Financial Position
Advertisements

CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
How is the budget raised The own resource system – The overall amount of own resources needed to finance the budget is determined by total expenditure.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
RRB Scrutiny Group Meeting A. Charkiewicz, 16 July 2013 M&O Budget Issues.
Roberto Tenchini CMS FB December 2004 CMS Tracker The Tracker Cost Review - November 2004.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
TK Dry Gas System Operation  System overview  Dry Gas Consumption  Interlocks and thresholds  Documentation  Operational model  Final comments.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
CERN Finance, Procurement and Knowledge Transfer Department / EDMS CERN-RRB CMS Resources Review Board 18 October 2011 Updates to Financial.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
G. Bolla For the CMS Pixel Group 2/25/20161 Status at P5 and infrastructures (mainly cooling) Status at P5 and infrastructures (mainly cooling)
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
"If you know how to spend less than you get, you have the philosopher's stone." - Benjamin Franklin.
CERN-RBB EDMS 1 CMS Resources Review Board 19 April 2010 Updates to Financial Report CERN-RRB
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
T2K IFOP 11/7 Imperial College/RAL Dave Wark Status of the 280m Detectors and Current Issues Dave Wark Imperial/RAL J-PARC IFOP Videocon Nov. 16, 2007.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Introduction and News Karl Gill. Introduction Today’s agenda News AOB – Hypernews, Calendar 2012.
7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
LKr status R. Fantechi.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
LIU Wire Scanner Milestones June 2017
ATLAS M&O General Comments
HCAL M&O-B Budget CMS Finance Board
4th FRC meeting, Antti Onnela, CERN-PH-DT
Status of ATLAS Resources
LIU Wire Scanner Series Costs
Status of ATLAS Resources
Participatory Budgeting
Presentation transcript:

30 May 2013CMS M&O-B Scrutiny1 Salvatore Costa - Catania CMS M&O-B Scrutiny, CERN, 30 May 2013 Tracker

30 May 2013CMS M&O-B Scrutiny2 Salvatore Costa - Catania Fast Facts Tracker Strip modules 9.3M readout channels 2500 power supplies Pixel 1440 modules 66M readout channels 168 power supplies Construction Cost 84 MCHF Typical current yearly M&O-B budget ~ 1.6 MCHF 2 % of investment 2.7 kCHF/member CMS Members assigned to project Tracker ~ 600 members ~ 400 authors ~ 300 PhDs

30 May 2013CMS M&O-B Scrutiny3 Salvatore Costa - Catania Tracker M&O Items Overview CoolingPowerReadout Controls: DSS Controls: DCS Dry gas Hardware M&O tasks Procurement of spares Repair of faulty modules (cost per unit - Repair Contract on M&O-A) Repair of infrastructure Improvement of infrastructure Improvement of performance (dev&prod) [ex: small current readback for sensor aging studies; new MFs, new controllers, for faster turn-on] Procurement of spares Repair of faulty modules (cost per unit - Repair Contract on M&O-A) Repair of infrastructure Improvement of infrastructure Improvement of performance (dev&prod) [ex: small current readback for sensor aging studies; new MFs, new controllers, for faster turn-on] MechanicsCommunicationsStore ItemsManpowerAreas General Operations Software M&O A vulnerable system, prone to failures and incidents EN/CV maintenance fee Leak search and repair Fluid chemical analysis, fluid cleaning Replacement of faulty parts (pumps, motors, valves, gaskets, pipes,…) Infrastructure improvement, THIP(in LS1) A vulnerable system, prone to failures and incidents EN/CV maintenance fee Leak search and repair Fluid chemical analysis, fluid cleaning Replacement of faulty parts (pumps, motors, valves, gaskets, pipes,…) Infrastructure improvement, THIP(in LS1) Plant (N, dry air) parts: pumps, driers, compressors, instrumentation; Filters; piping TK sealing, THIP(in LS1) Plant (N, dry air) parts: pumps, driers, compressors, instrumentation; Filters; piping TK sealing, THIP(in LS1) E-pool rentals Repair, FW upgrade, performance improvement for: Feds, FECs, local DAQ PCs,… E-pool rentals Repair, FW upgrade, performance improvement for: Feds, FECs, local DAQ PCs,… Repair/Replacement, HW/ FW upgrade, performance improvement for: T/RH probes, PLCs & batteries, interlocks, PCs, infrastructure Repair/Replacement, HW/ FW upgrade, performance improvement for: T/RH probes, PLCs & batteries, interlocks, PCs, infrastructure Cleaning Infrastructure (wiring, air conditioning,…) “Furniture” (desks, benches, printers, workstations,…) Specific test/dev setups Cleaning Infrastructure (wiring, air conditioning,…) “Furniture” (desks, benches, printers, workstations,…) Specific test/dev setups CERN rental cars CERN GSM phones Shipping Travel for TK M&O business CERN rental cars CERN GSM phones Shipping Travel for TK M&O business Mechanical shop work for any M&O task (CERN, Institutes, or outsourced) Small purchases at CERN store for any M&O task Calibrations Alignment DQM, DCS, DSS; operations THIP(in LS1) Calibrations Alignment DQM, DCS, DSS; operations THIP(in LS1)

30 May 2013CMS M&O-B Scrutiny4 Salvatore Costa - Catania 2012 Income Report Received: 99.0% (cash 84% of received; in-kind 16%) Received + Invoiced: 99.4% Received: 99.0% (cash 84% of received; in-kind 16%) Received + Invoiced: 99.4% 2012 Income Report (CHF) Country -DueReceivedInvoiced butMissing Agency(RRB , Annex B.3)CashIn-kindnot yet cashedCHFComments Austria46' Belgium-FNRS80' Belgium-FWO52' CERN201' Cyprus3' Finland48' France102'908102' debt also paid Germany-BMBF145' Germany-DESY13' Hungary2' Iran9' bureaucratic problems Italy355' Spain6' from global CMS M&O Switzerland-ETHZ23' Switzerland-PSI54' Switzerland-UNIV37' Taiwan2' UK89'11344'55644'55700 USA314'313159'854154'45900 Totals1'590'0001'321'324253'1336'2149'329 Grand Totals 1'574'457 1'590'0001'580'6719'329

30 May 2013CMS M&O-B Scrutiny5 Salvatore Costa - Catania Tracker budget Requests are not split into Cash and in-kind part at the origin  in principle we would like all contributions in Cash. However, a few Funding Agencies may provide part of their contributions in-kind. In 2012, in-kind contributions were provided as: 1.Manpower 2.instrumentation for the extraction and servicing of the Pixel Detector during LS1.  This is noted in the Comments column in the next slide Cash vs. In-Kind

30 May 2013CMS M&O-B Scrutiny6 Salvatore Costa - Catania 2012 Expense Report Expenses reported: Both finalized and currently committed Expenses attain 97% of budget – This year only 3% unspent Expenses reported: Both finalized and currently committed Expenses attain 97% of budget – This year only 3% unspent 2012 Expense Report (kCHF) SSTPixelTracker RRB key RRB CategoryBudgetedActualDiffBudgetedActualDiffBudgetedActualDiffComments B.1.01Mechanics B.1.02Gas-system Strips 2/3 - Pixel 1/3 B.1.03Cryo system B.1.04Cooling system Strips 5/6 - Pixel 1/6 B.1.05FE electronics B.1.06 Standard electronics, PS (LV, HV) B.1.07 Standard electronics, crates B.1.08 Standard electronics, RO Modules B.1.09Controls, (DCS, DSS) Strips 2/3 - Pixel 1/3 B.1.10Sub-detector spares B.1.11Areas Ordinary: Strips 2/3 - Pixel 1/3. In-kind 54 (Pixel) B.1.12Communications B.1.13Store Items B.1.14 Hired CERN (kCHF) Cash 591 (Strips 539, Pixel 52). In-kind 200 (Strips 125, Pixel 75) Material Resources Total (kCHF) 1'3051‘ '5901' Categories shared by conventional fractions between Strips and Pixels In kind

30 May 2013CMS M&O-B Scrutiny7 Salvatore Costa - Catania Use of available cash reserve  Already one year ago a reduction was applied to the 2013 Budget request because of previously accumulated cash reserve :  Now, the reduction we thought we could apply to the 2014 needs stems from this calculation: Needs estimated for 2013 in Feb Financial Request1580= Cash reserve thought to be exploited in Refined Need estimate for 2013, redone in Feb Financial Request1580= Cash reserve expected to be exploited in Available cash at end of Expect to spend in 2013 in addition to request524= Remaining Cash reserve537- Want to keep for cash flow purposes (agreed in past TFB)257= Can reduce estimated 2014 needs by280

30 May 2013CMS M&O-B Scrutiny8 Salvatore Costa - Catania Procedure similar to last few years: Panel of Technical Coordinators/Field Managers/experts estimated needs  Total estimated needs in 2014: 1845k  Reductions applicable on sheer needs with criteria in previous slide, reusing (part of) available cash: 280k  Further reduction of 50k was requested by TK FB to fend off a predictable average share increase for all FA’s except CERN  CERN has been voluntarily paying an extra quota in addition to its PhD-count based fair share (this lowering the fair quota of others) since this share system was adopted by TK. It now needs to reduce the extra quota by ~50k.  Budget request for 2014 is 1515k, or 65k less than the 2013, and reduced 85k compared to one-year-ago projection Budget Preparation Frank Hartmann, chair Antii Onnela (Eng/Infrastructure)Andromachi Tsirou (DSS)Karl Gill (ex PM) Gino Bolla (Pixels Ops + Tech FM)Paola Tropea (Coling/Gas)Nicola Bacchetta (TC) Danek Kotlinski (Pixel Ops)Ettore Focardi (Strips Ops)Andrea Venturi (Dep PM) Erik Butz (Strips Ops + Tech FM)Patrice Siegrist (Strips Safety Off.)Salvatore Costa (RM)

30 May 2013CMS M&O-B Scrutiny9 Salvatore Costa - Catania Budget Request 2014 and Projection through 2017 TRACKER (Strips+Pixel) Needs Savings to be reused Request B.1.01Mechanics40 30 B.1.02Gas-system B.1.03Cryo system00 B.1.04Cooling system B.1.05FE electronics00 B.1.06Standard electronics, PS (LV, HV) B.1.07Standard electronics, crates00 B.1.08Standard electronics, RO Modules B.1.09Controls, (DCS, DSS) B.1.10Sub-detector spares00 B.1.11Areas55 30 B.1.12Communications90 60 B.1.13Store Items50 B.1.14Hired CERN (KCHF) Material Resources Total (kCHF) New Pixel CO 2 Cooling Plants will be already installed  its maintenance adds to existing ones. In 2017 it will serve the upgraded Pixel at full power

30 May 2013CMS M&O-B Scrutiny10 Salvatore Costa - Catania 2013 Hired Manpower Details (FTE) Ordinary Maintenance and Operations Overall System Expert3.60 DAQ1.50 DCS [Provided by Institutes as ESP in 2013]0.00 Power1.20 DSS0.40 THIP (Temperature and Humidity Improvement Project) Improvements towards cold operation (sealing, inertion, cooling, instrumentation and monitoring) 8.20 DPG/Operations feedback Detector recommissioning and code improvements for cold operation 1.60 Admin 0.50 TOTAL FTEs17.00 Number of individual persons involved is ~ In 2014, total foreseen FTEs is about the same but manpower will shift from THIP towards Operation and Software Number of individual persons involved is ~ In 2014, total foreseen FTEs is about the same but manpower will shift from THIP towards Operation and Software

30 May 2013CMS M&O-B Scrutiny11 Salvatore Costa - Catania Evolution

30 May 2013CMS M&O-B Scrutiny12 Salvatore Costa - Catania Comments on evolution  After a few years of accumulating savings, in 2012 the budget was almost fully spent, and in 2013 ~2/3 of the request (or ~1/2 of the estimated expenditure), has been used up.  Had previous requests had been lower and savings not accumulated, the TK request would have had to increase during LS1, that is for both 2013 and  What has made possible not to increase the total request for 2013 and 2014 compared with the previous years is the fact that some LS1 jobs had been budgeted early so that the corresponding collected money had accumulated as savings.  So in retrospective the TK has in practice spread over a few years ahead of LS1 the higher costs of LS1,  thus smoothing out the time profile of its requests to Funding Agencies ever slowly decreasing since 2009 instead of exhibiting a significant increase in due to LS1 activities/refurbishments.