Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
CCSDS Navigation Working Group David Berry 10/01/2007.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS XML Telemetric and Command Exchange (XTCE)
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
April 25, 2001 GSFC Data Systems Standards Management and CCSDS P1J Status Report NTAG Meeting April 25, 2001 Felipe Flores-Amaya GSFC/Code 572.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
1 CCSDS Information Architecture Working Group Daniel J. Crichton, Chair NASA/JPL 14 September 2005.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
XML-NDM Schema Issues (From Service Management Perspective) 18 September 2012.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Navigation Working Group David Berry 04/20/2009.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
November SECURITY WORKING GROUP REPORT November 2004.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
SMWG-JAXA April JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
CCSDS Navigation Working Group David Berry 01/16/2007.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CCSDS Navigation Working Group David Berry 10/13/2008.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Status Briefing
System Engineering Area SANA BoF Kick-Off
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
CCSDS Navigation Working Group
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
CCSDS Navigation Working Group
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Presentation transcript:

Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572

Panel P1J: Navigation Data April 2003P1J Final Report2 Agenda Accomplishments Application of ODM Future Work Issues Participants

Panel P1J: Navigation Data April 2003P1J Final Report3 Accomplishments (1) Completed a detailed review of latest version of the Orbit Data Message (ODM) Red Book, based on P2 personnel input to separate syntax and semantics and to incorporate use of XML. P1J completed a reorganization of the document to provide ASCII and XML transport options of the orbit parameters and ephemeris messages. Continued discussions of tracking data requirements and write up of operational characteristic of tracking data support and tracking data descriptions, as a first step for producing a tracking data Recommendation. Continued discussion and write up to define requirements on spacecraft ID’s, to be delivered to the Space Assigned Numbers Authority (SANA) for action. Continued discussions on attitude and plan to write a draft for an attitude data message Recommendation.

Panel P1J: Navigation Data April 2003P1J Final Report4 Accomplishments (2) Participated in another joint P1J/P1K session, to discuss the timing service issues. Agreed to write navigation timing issues to be provided to P1K and to the new Time Synchronization Architecture Working Group. Received copy of the white book REAL-TIME TRACKING DATA TRANSFER SERVICE SPECIFICATION (SLE related) and P1J will provide feedback. Discussed, reviewed and completed charter for the Navigation working group. Reviewed and discussed all open action items

Panel P1J: Navigation Data April 2003P1J Final Report5 Application of ODM ESOC-JPL did a test using Ulysses spacecraft to exchange the ephemeris message (EPM). Transmission and processing was successful. ESA-JPL ICD specifies use of EPM as the navigation operational interface for the Rosetta and Mars Express missions; which are currently scheduled to launch on Jan 2004 and June 2003, respectively. CNES-DLR will perform testing to exchange the orbit parameters message (OPM). Plan to use OPM to support future missions (TBD)

Panel P1J: Navigation Data April 2003P1J Final Report6 Future Work Finalize the ODM Red Book, including input from XML personnel. Schedule: Start internal review April 7, end review May 15, then request advancing Red Book to Blue Book status Develop draft for Attitude data exchange Schedule: First draft white book May 10, 2003 Complete write up for Tracking data exchange requirements. Schedule: drafts due April 18, followed by internal review by CCSDS navigation personnel. Complete a write up for spacecraft ID for delivery to SANA. Schedule: Following feedback from navigation personnel document will be ready by May 1, First meeting of Navigation Working Group week of Oct/Nov 2003, Annapolis, MD USA

Panel P1J: Navigation Data April 2003P1J Final Report7 Resolutions P1J requests MC to approve promotion of ODM RB to BB status, subject to final review from XML personnel to be completed by May 2003.

Panel P1J: Navigation Data April 2003P1J Final Report8 Issues Ask to confirm that the new Time Synchronization Architecture working group will be responsible for investigations of timing issues. Ref. P1 action item A-P-00-2

Panel P1J: Navigation Data April 2003P1J Final Report9 Participants F. Flores-Amaya (Chairman/NASA/GSFC) T. McElrath (NASA/JPL) R. Kiehling (DLR) J. Foliard (CNES) C. Acton (NASA/JPL) S. Pallaschke (ESA/ESOC) R. Kannenberg (NASA/GST)