1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE Sagar Varma Senior Manager( Fire & safety)
2 Cleaner Environment MAHARASHTRA NATURAL GAS LIMITED (MNGL) A Joint Venture promoted by GAIL (India) Limited; and Bharat Petroleum Corporation Limited MAHARASHTRA NATURAL GAS LTD. To implement City Gas Distribution Project in Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)
3 Cleaner Environment DAHEJ BARUCH HAZIRA NAVSARI VALSAD SILVASA APTI BUDRUK HAJIMALANGWADI DAHANU VASAI BORIVALI TROMBAY GHOTAW`ADE CHINCHWADETHAL DABHOL PUNE VAPI SURAT PANVEL URAN IIL USAR AMBEWADI NASIK SAFALE GAIL ’ S TRANSMISSION PIPELINES 1.DAHEJ – URAN PIPELINE 2.DABHOL – PANVEL PIPELINE 3.GHOTAWADE – CHINCHWAD PIPELINE
4 Cleaner Environment DFR prepared by MECON in 2002 MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004 Date of Incorporation Date of Commencement of Business Authorised by PNGRB on
5 Cleaner Environment City Gate Station 19 Bar Steel Network 4 Bar PE Network Mother Station Chinchwad DRS GI Installation Service Regulator Domestic Kitchen 100 mbar PE Network 21 mbar CU Network
6 Cleaner Environment Customer Base Domestic 4000 customers Vehicles auto cars 530 buses Industrial 37 nos. Hotels/Small Commercial 13 commercial
7 Cleaner Environment Major Challenge n CGD companies operate as utilities and operate in city conditions. n Our typical response to emergency is based on customer complaints.
8 Cleaner Environment Major Challenge n Common regulation for midstream as well as downstream.
9 Cleaner Environment Documentation challenge n Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists. n Supports in the form of annexure included to give sense to the content
10 Cleaner Environment Documentation challenge To include n Risk analysis and consequence mapping. n Collection of data from various departments
11 Cleaner Environment challenges n Site visit and mockdrills n Three mockdrills conducted in span to 2 hours. n resource constraints. n Offsite department involvement
12 Cleaner Environment Other challenges n Perception of TPI delegates n Repeated Micro level changes
13 Cleaner Environment contents Other Challenges n Flow of document n Longtime taken for each stage of accreditation Foreword Definitions Executive Summary 11 chapters ( covering each and every schedule) 20 Annexures 7 Checklists
14 Cleaner Environment Benefits of the exercise n Involvement lead to knowledge up gradation n Various areas of safety management system come to surface n Comprehensive documentation n Knowledge sharing with other CGD n Tying of loose ends
15 Cleaner Environment