1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

Slides:



Advertisements
Similar presentations
CNG for Clean & Green Environment 1 Indraprastha Gas Limited Corporate Presentation July 2005.
Advertisements

Methane Capture and Use: Current Practices vs. Future Possibilities.
GSPC GAS COMPANY LIMITED
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
PRESS CONFERENCE ON FINANCIAL RESULTS FY
LP Gas Chain Distributor to End-Consumer CurrentChallenges Future Future Dimensions Dimensions.
“PROJECT PLANNING AND REPORTING” 09 April 2013
Indian gas regulatory framework: Industry issues.
1 NATURAL GAS FOR CLEAN & GREEN ENVIRONMENT 1 1 INDRAPRASTHA GAS LIMITED An Overview.
1 NATURAL GAS FOR CLEAN & GREEN ENVIRONMENT 1 1 INDRAPRASTHA GAS LIMITED An Overview.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
Training Activity. The recent and significant technological evolution in the field of petroleum industry, has made it possible that many industrial installations.
GAIL TRAINING INSTITUTE GAIL (India) Limited Serving Community Since Date: 11th- 12th June 2009 NETWORK WORKSHOP on
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Human Resource Auditing
ERDMP OF IGL Experience and Lessons for other CGDs
Pipeline Corrosion Management NACE Houston Section April 9, 2013 Drew Hevle - Manager, Corrosion Control Kinder Morgan Natural Gas Pipeline.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
OHT 22.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
Introduction of Government’s CNG policy and India’s CNG infrastructures and NGV Diffusion 25 th November, 2014 New Delhi.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Domestic Natural Gas Installations Marc Billington.
Chapter 5 Conducting a Feasibility Analysis. Copyright © Houghton Mifflin Company. All rights reserved.5 | 2 Learning Objectives Prepare to conduct a.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
REGULATORY FRAMEWORK ON OIL & GAS SECTOR by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1.
Date & Venue Bombay Exhibition Centre Goregaon East Mumbai Maharashtra, India March 22 – 24, 2012.
Course Outline MAIL.PPT/1 © All Rights Reserved by TQMI TQMI, India's leading training and consultancy organisation, with its network of offices across.
BG Group Delivering The Benefits of Natural Gas Infrastructure Challenges Dr Anthony Barker Director – Downstream Business Development, BG India.
1 1 INDRAPRASTHA GAS LIMITED An Overview
GUIDED BY : Mr. RUSHABH DOSHI SIR PRESENTED BY : KASHYAP HEDPARA PARIKSHITSINH JADEJA KAUSHIK KARSARIYA.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Natural Gas Transmission Pipeline 101 Terry Boss INGAA
Using the CMMI in small Organisations Stephen Fletcher PAS Ltd, UK.
Climate Change Adaptation Support Project CLASP..
City Gas Distribution: A Network Analysis
Course Outline MAIL.PPT/1 © All Rights Reserved by TQMI TQMI, India's leading training and consultancy organisation, with its network of offices across.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
25 th September, 2008 Gas Infrastructure & Allied Issues 7th Petro India 2008 conference Gas In India- Issues, Opportunities & Challenges.
Petroleum and Natural Gas Regulatory Board Regulations for CGD Network 1.
Implementation of training in Dublin Bus. Dublin Bus – public transport City of Dublin 2,732 bus drivers Road Safety Authority (RSA) regulator for Dir2003/59.
Feasibility Study.
Course Outline MAIL.PPT/1 © All Rights Reserved by TQMI TQMI, India's leading training and consultancy organisation, with its network of offices across.
EVENT LOGISTICS EVENT MANAGEMENT.
7 Summary The Business Plan
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Internal Auditing ISO 9001:2015
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Telephone: Global Automotive Rechargeable Battery Market: Trends and.
Telephone: Global Eco Vehicle Market-Focus on China: Trends and Opportunities.
Jim Doherty MRSC Legal Consultant
Corporate Learning Center The AES group of companies in Kazakhstan.
Compliance Remediation
Are China’s Pipelines Ready: to meet its energy needs by 2030?
INDRAPRASTHA GAS LIMITED
chambers of commerce do business
Welcome to Presentation dated
For more information about Website Design Company in PuneWebsite Design Company in Pune & Website Design.
Overview of City Gas Pipe lines PSC th March 2018
INDRAPRASTHA GAS LIMITED
INDRAPRASTHA GAS LIMITED
October 9, 2014 Kenneth W. Yagelski Managing Director Gas Supply
TYPE IN CENTRE NAME LEVEL 1 FIRE SAFETY TYPE IN NAME
CIS460 – NETWORK ANALYSIS AND DESIGN
Emergency Response Best Practices Executive Roundtable Presentation
Public-Private Partnership for Clean Air Municipal Natural Gas Distribution Infrastructure Development Projects Hisaka Kimura Principal Investment Specialist.
Chapter Fifteen: 15.1 INTERNATIONAL JOINT VENTURES
TYPE IN CENTRE NAME LEVEL 1 FIRE SAFETY TYPE IN NAME
Presentation transcript:

1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE Sagar Varma Senior Manager( Fire & safety)

2 Cleaner Environment  MAHARASHTRA NATURAL GAS LIMITED (MNGL)  A Joint Venture promoted by GAIL (India) Limited; and Bharat Petroleum Corporation Limited MAHARASHTRA NATURAL GAS LTD. To implement City Gas Distribution Project in Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)

3 Cleaner Environment DAHEJ BARUCH HAZIRA NAVSARI VALSAD SILVASA APTI BUDRUK HAJIMALANGWADI DAHANU VASAI BORIVALI TROMBAY GHOTAW`ADE CHINCHWADETHAL DABHOL PUNE VAPI SURAT PANVEL URAN IIL USAR AMBEWADI NASIK SAFALE GAIL ’ S TRANSMISSION PIPELINES 1.DAHEJ – URAN PIPELINE 2.DABHOL – PANVEL PIPELINE 3.GHOTAWADE – CHINCHWAD PIPELINE

4 Cleaner Environment DFR prepared by MECON in 2002 MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004 Date of Incorporation Date of Commencement of Business Authorised by PNGRB on

5 Cleaner Environment City Gate Station 19 Bar Steel Network 4 Bar PE Network Mother Station Chinchwad DRS GI Installation Service Regulator Domestic Kitchen 100 mbar PE Network 21 mbar CU Network

6 Cleaner Environment Customer Base Domestic 4000 customers Vehicles auto cars 530 buses Industrial 37 nos. Hotels/Small Commercial 13 commercial

7 Cleaner Environment Major Challenge n CGD companies operate as utilities and operate in city conditions. n Our typical response to emergency is based on customer complaints.

8 Cleaner Environment Major Challenge n Common regulation for midstream as well as downstream.

9 Cleaner Environment Documentation challenge n Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists. n Supports in the form of annexure included to give sense to the content

10 Cleaner Environment Documentation challenge To include n Risk analysis and consequence mapping. n Collection of data from various departments

11 Cleaner Environment challenges n Site visit and mockdrills n Three mockdrills conducted in span to 2 hours. n resource constraints. n Offsite department involvement

12 Cleaner Environment Other challenges n Perception of TPI delegates n Repeated Micro level changes

13 Cleaner Environment contents Other Challenges n Flow of document n Longtime taken for each stage of accreditation  Foreword  Definitions  Executive Summary  11 chapters ( covering each and every schedule)  20 Annexures  7 Checklists

14 Cleaner Environment Benefits of the exercise n Involvement lead to knowledge up gradation n Various areas of safety management system come to surface n Comprehensive documentation n Knowledge sharing with other CGD n Tying of loose ends

15 Cleaner Environment