ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.

Slides:



Advertisements
Similar presentations
BOS Supplier Mangement
Advertisements

AS9102 First Article Inspection Report
Cargo Direct International
Definition of the KPI Return rate. Purpose This document defines the KPI return rate for suppliers of direct material. The purpose is to measure our supplier.
PPAP Requirements Training
1 EXT410– Purchase Orders and Follow on Functions - Domestic.
First Article Inspection Report
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Guardian Tier 2 PPAP Guidelines
Package Engineering Container Design Request (CDR) Reference Guide
QMS Tips and Traps (ISO TS16949)
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
First Article Inspection
E2Open Supplier Training
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
Instructions for Completing the S upplier V erification of P urchased P roduct Package.
Introduction to Software Quality Assurance (SQA)
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
CTO My SelfStudy Application Overview Sep 25, 2005.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
Windchill PCS Overview Product Cost System Overview for Purchasing 03Sep2008.
Reports. Report Summary Warehouse Reports Returned Material Serial Numbers Not Found This report list the serial numbers of material returned which were.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Micro/Nano Fabrication Center (MFC) University of Arizona.
The DMN Process – –DMN (Defective Material Notification) – –A Web based replacement for the current MRR process. Supply Web the new frontier.
PUBS-09-C D Bar Code Program Supplier Guidelines April 2013.
PHILIPPINE FEDERATION OF LOCAL COUNCILS OF WOMEN, (PFLCW) INC. November 19, 2009 Top Plaza Hotel, Dipolog.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Proposed new MODEVA silkscreen and EVORA button engraving process 8/2015.
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Production Part Approval Process
Av-Tech Industries- Quality, Service and Precision Kitting
Part Approval / Compliance Data Submission via Jotform.com
Procurement Policy Summary
E-JPPAP User Guide _ Supplier
DSQR Training Reliance System
LESSON 2 Statistical Sampling
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supply Web the new frontier
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Faraday Future Shipping Portal Instruction Manual
<NPI/Engineering Change/Phase Out>
First Article Inspection
DSQR Training Supplier Quality Manual
Part Approval / Compliance Data Submission via Jotform.com
Global Supplier Quality Early Production Containment Training
First Article Inspection (Per AS9102)
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supplier Performance Development Process
  Aptiv Global Supplier Quality Early Production Containment Training.
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
This PPAP File Is Under Construction
NPD Product Approvals Process
RISK REDUCTION PROCESS
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev
Supplier Performance Development Process
Global Supplier Quality Early Production Containment Training
First Article Inspection (Per AS9102)
Advanced Product Quality Planning 2nd Edition
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Partner Portal Training document
Presentation transcript:

ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013

ALCOM Confidential 2 Controlled – Safe Launch Plan to be defined and executed in the Product Special Characteristic Matrix (PSCM). Suppliers will participate in a controlled - Safe Launch Plan to be defined and executed in the Product Special Characteristic Matrix (PSCM). PSCM is listing all significant inspection / control points, the type of inspection occurring (i.e. visual, testing or actual measurement), the method of documentation, the sample size and increased frequency of those checks, and defined immediate action to be taken if an out of control and/or out of specification condition occurs.

ALCOM Confidential Safe Launch Plan Controlled–Safe Launch Plan Label Exit criteria for the Controlled - Safe Launch Plan is shipment of zero defect parts that meet either the defined period of time or number of lots. Any defect discovered during this period restarts the event to “0” pieces shipped. Suppliers will be required to submit data to ALPS as part of this process. Suppliers shipping parts under Controlled - Safe Launch Plan shall create a separate label placed on each container showing “Safe Launch Plan” to indicate these parts. See Figure below for an example: 3 Label Size: a standard 2 1/2“ X 5” tag is recommended

ALCOM Confidential Plan Labeling 4 Prototype material must be identified as such by the use of the required PINK label on the outside of each box or package. Material that will be used for pilot builds must be identified as such by use of the required GREEN label on the outside of the box. BLUE color for PPAP(submission)Controlled-Safe Launch Plan The requirements and responsibility for these approvals shall be determined by the Design Engineer, the Product Engineer, the Tooling Engineer, and Supplier Quality Engineer based upon design needs and Customer requirements.

ALCOM Confidential Controlled Launch Plan Labeling Prototype Material: First shot, or pre-PPAP shipments must be identified by PINK labels stating:  ALPS DEVELOPMENT MATERIAL  PROGRAM NAME  ALCOM W.O.R.# Label Size: a standard 2 1/2“ X 5” tag is recommended PILOT Material: Material with a minimum of a Limited PPAP Approval that will be used of product validation must be identified by GREEN label stating:  PILOT MATERIAL  PURCHASE ORDER #  ALPS PART NUMBER  QUANTITY  PROGRAM NAME  ATT’N: (ALCOM Contact Name) Label Size: a standard 2 1/2“ X 5” tag is recommended 5

ALCOM Confidential PSCM FOR Controlled Safe Launch Plan 6 All material sent to ALPS during the CSLP time period must be subjected to the agreed Controlled Safe Launch Plan. This includes material produced during PPAP. PSCM ATTACHED FILE:  PSCM, for a pre-determined period of time (90 days) or six lots for supplier production  ALPS facility and the Supplier will employ an expanded inspection process on special – key characteristics.  Once the program passed from launch into normal production, the supplier shall continue to use the validated process (PPAP Process). Note: In case that any change to validated process be requested, ALPS approval is required. In case that goals and metric during this process does not meet, Suppliers will be subject to one or more intensive improvement tools.