Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.

Slides:



Advertisements
Similar presentations
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Advertisements

Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
RWA, 22/9/2005 Controls for the LHC Collimation System September 22 nd, 2005 Collimator Controls Specification Team (COCOST) started in April 2005 after.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Microsoft Office Project Portfolio Server
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
B. Todd et al. 25 th August 2009 Observations Since v1.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Collimator Controls Readiness of collimators control – from bottom to top State of automated collimator positioning Extended LTC Session 6 - Readiness.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
2006/07/20 MJJ Collimator control for the SPS beam test Michel Jonker AB/CO TC 2006/07/20.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
I & C.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
Introdcution to Workpackage/Activity Reflection D. Schulte.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Eurostat Sharing data validation services Item 5.1 of the agenda.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
R. Denz, A. Gomez Alonso, AT-MEL-PM
LINAC4 50 MeV phase BIS STATUS
M.Jonker CTC MPO-WG status
J. Uythoven for the MPE-MI & MS Teams
Session II: System authority for ERTMS 4RP Trackside approval
Automated Collimation Operation
Commissioning and Testing the LHC Beam Interlock System
Experience with an IT Asset Management System
Machine Protection System Commissioning plans
LHC BLM Software audit June 2008.
Beam Interlocks for Detectors and Movable Devices
PSS verification and validation
Editing Board Meeting Status Expert Groups (Transmission, Axle)
ThomX – Commissioning Meeting – 25/01/2018
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Integration into MP - Considerations -
Presentation transcript:

Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team

Proposal for Decisions and 2007 Work Baseline Objective: Define a clear and non-controversial basis for important work in 2007 and beyond. This is a common proposal and supported by all members of the COCOST.

Proposal Hardware Choices PXI based system should be adopted for the low level system:  It is the best technical solution and also fits all other requirements. ( Lower coast is a convenient side effect). ATB ensures procurement, installation and maintenance of low level hardware and software. The full technical specification is implemented (no reduction of scope for lowering cost):  Fully sufficient precision and response is possible. The full redundancy (as possible from the position sensors) is implemented:  Will result in improved operational efficiency. All final hardware (also at the middle level) will be procured now, freezing basic architecture: –PXI, PLC, PC gateways, optical transmission, …

Proposal Functionality in 2007 Function-driven movements in all controls levels. Simultaneous synchronized movements of motors. Core machine protection is implemented at low level. The connection to machine-critical settings (MCS) and interlock system is implemented throughout the full architecture:  Need a person to write technical specification, define test protocols and validation procedures throughout full collimator controls architecture (fraction of FTE from some controls expert?).  Further review of this important topic in Spring The post-mortem system is implemented at Low Level (MDS, PRS) and supervisory system (CSS). Preparation for the fast BLM-based automatic set-up.

Possible Optimization of System These technical issues are under discussion and do not need decision today. We have working solutions, however, the solutions can be optimized to increase performance, reduce number of components and associated experts for maintenance: –Important and successful features of the current CSS to be integrated with facilities of the Fesa environment (Will be discussed with Fesa support). –Merging of the FESA servers of CSS / LowLevel when most convenient.

Further Tests and Documentation Provide a good infrastructure as a test bed for the Collimation Control system –Building 252, development of low level and CSS –All installed collimators TI & LHC: CSS and CCC application in LSA environment. –LSS5, if recabled and equipped with standard motors and position sensors. Beam related equipment tests (e.g. BLM based optimization tests during MD’s). Organization of documentation, specifications, procedures and sources with read access to all COCOST members.

Updated Collimator Control Milestones Basic command-driven control August 2006:Basic command-driven control of single collimators for SPS test, TT40 test and commissioning of transfer line collimators  Successfully demonstrated in Nov non-standard movable objects February 2007:Review and decision on detailed interface to non-standard movable objects (TCDQ, Roman Pots,…). function-driven, synchronized control March 2007:First tests on function-driven, synchronized control of a collimator ensemble (several 10's of collimators), like required for the LHC. April 2007:Preliminary technical specification of safe collimator controls and review. May 2007:Position and surveillance based on ordinary movement functions (low level). Automatic detection and signaling of lost steps based on resolvers. June 2007:Final technical specification of safe collimator controls. July 2007:Integration with low level of experimental movable devices (Roman Pots). collimator beam-based alignment August 2007:Non-automatic collimator beam-based alignment. Function-driven, synchronized control of a collimation system for commissioning. August 2007:Post Mortem buffers are operational. September 2007:Critical settings based surveillance functions are operational. October 2007:Testing and validation of safe LHC collimator controls. March 2008:First tests on automatic BLM-based collimator set-up. Availability of fast automatic BLM-based collimator set-up July 2008:Availability of fast automatic BLM-based collimator set-up to allow for efficient machine set- up for luminosity of up to (up to 30% of nominal beam intensity).

Manpower and Responsibilities Our understanding: –The present work responsibilities and manpower are kept until successful implementation and hardware & beam commissioning of the baseline control system for collimators. Note: Controls for temperature sensors (PLC) is implemented by CO as agreed in end –Work responsibility also implies the responsibility for commissioning and maintenance of sub-systems (other approaches are considered quite inefficient). –Additional support for the realization of the Machine Protection chain in collimators is required for writing technical specification, definition of test protocols and validation. –Support for extensions of CO environment will be provided were needed. Examples: LSA sanity check (update of lsa settings to reflect real position after beam based alignment or motor lost steps). Has been discussed with Mike Lamont. Fesa enhancements / performance issues. Diagnostics tools.