© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.

Slides:



Advertisements
Similar presentations
Intracompany Stock Transfer Scenario Overview
Advertisements

© 2009 SAP AG Controlling (CO) SAP University Alliances Version 1.0 Authors Bret Wagner Stefan Weidner Stephen Tracy Product SAP ERP 6.0 Global Bike Inc.
Production Planning & Execution (PP)
© 2009 SAP AG Production Planning & Execution (PP) SAP University Alliances Version 1.0 Authors Bret Wagner Stefan Weidner Stephen Tracy Product SAP ERP.
The Production Process
Process Management and Control and Physical Inventory SAP Implementation
Internal Accounting Text Chapter 10 and R/3 Profit & Cost Reporting.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
The Production Process
Production and Planning Master Data SAP Implementation
Inventory and Warehouse Management Process
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Production Planning.
Procurement Processes SAP Implementation
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Enterprise Systems Configuration Production Planning Master Data EGN 5620 Enterprise Systems Configuration Spring, 2012.
Production Planning & Execution (PP)
Production Planning & Execution (PP)
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
Materials Management (MM)
Financial Accounting (FI)
Production Planning Processes Theories & Concepts
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Sales and Distribution (SD)
Phase II: Procurement SAP University Alliances Version 2.2
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Sales and Distribution (SD)
Enterprise Asset Management (EAM)
Customer Service (CS) SAP University Alliances Authors Tim Böttcher
Materials Management (MM)
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Production Planning and Execution (PP)
Financial Accounting (FI)
Production Planning and Execution (PP)
Financial Accounting (FI)
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Controlling (CO) SAP University Alliances Authors Bret Wagner
SAP ERP Sales and Distribution Solutions
© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
SAP Demand Management Order Management Customer Service EIN 5346, Logistics Engineering Spring 2010.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
Page 5: Job Costing System Gerald Katherine Armineh.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
Financial Accounting (FI)
Controlling (CO) SAP University Alliances Version 2.1
© SAP AG Financial Accounting (FI) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global Bike Inc. Level.
© SAP AG Materials Management (MM) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global Bike Inc. Level.
Controlling (CO) SAP University Alliances Version 2.1
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Controlling (CO) SAP University Alliances Version 1.0
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.
Business Module for Selling Finished Goods by Production
Business Module for Selling Finished Goods by Production
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
 Tata Consultancy Services CONTENTS PRODUCTION ORDERS METHODS OF CREATING PRODUCTION ORDERS Results of creation and release of production order. Production.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Costs that are identified with the period in which they are incurred.
Project Management (PS)
Enterprise Asset Management (EAM)
Actual Postings Financial accounting Materials mgmt Controlling
Navigation SAP University Alliances Author Stefan Weidner Product
BASIC SETTINGS CONTENTS OF THE COURSE: Definition of Company
SAP Production EIN 6133 Enterprise Engineering Spring 2010
Production Planning Processes SAP Implementation EGN Enterprise Systems Configuration
Production Planning Process Theories & Concepts EGN 5620 Enterprise Systems Configuration Spring, 2011.
Presentation transcript:

© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global Bike Inc. Level Beginner Focus Cross-functional integration Production Planning and Execution

SAP ERP Page 6-2 © SAP AG Production Order  Production orders are used to control production operations and associated costs -Production Orders define the following Material produced Quantity Location Time line Work involved Resources used How to costs are settled

SAP ERP Page 6-3 © SAP AG Production Order What How many How Components Time Line

SAP ERP Page 6-4 © SAP AG Schedule  Calculates the production dates and capacity requirements for all operations within an order -Determines a Routing Operation specific time lines Material Consumption Points -Material Master Scheduling Margin Key (Floats) -Work Center Formulas Standard Inter-operation Times

SAP ERP Page 6-5 © SAP AG Release  Two release processes -Header Level Entire order and all operations are released for processing, order is given a REL status -Operation Level Individual operations within an order are released Order is given a PREL status Not until the last operation is released does the order obtains a REL status  Automatic vs. manual

SAP ERP Page 6-6 © SAP AG Availability Check  Automatic check to determine whether the component, production resource tools, or capacities in an order are available -Can be automatic or manually executed -Determines availability on the required date  Generates an availability log -Displays results of the check -Missing parts list -Reservations that could not be verified

SAP ERP Page 6-7 © SAP AG Schedule & Release  The time between scheduling and releasing an order is used for company checks and any preparation needed for the processing of the order  Once an order has been released it is ready for execution, we can at this time -Print shop floor documents -Execute goods movements -Accept confirmations against the order

SAP ERP Page 6-8 © SAP AG Shop Floor Documents  Shop Floor Documents are printed upon release of the Production Order, examples would be: -Operation-based Lists Time Tickets, Confirmation Slips -Component-based Lists Material Withdrawal Slips, Pull List (consumption list) -PRT Lists Overview of PRT’s used and in which operations -Multi-Purpose Lists Operation Control Ticket, Object Overview

SAP ERP Page 6-9 © SAP AG Material Withdrawal  When a production order is created it references a BOM to determine the necessary components to produce the material.  It then places a reservation on each of the components.  Upon release of the order (or operation) you can withdraw the reserved materials from inventory -Reservation is updated -Inventory is updated -Costs are assigned to the order as actual costs

SAP ERP Page 6-10 © SAP AG Confirmations  Confirmations are used to monitor and track the progression of an order through its production cycle -Confirmation can be done at the operation or order level  Exact confirmation shortly after completion of an operation is essential for realistic production planning and control  Data that needs confirmation include -Quantities – yield, scrap, rework -Activity data – setup time, machine time -Dates – setup, processing, teardown started or finished -Personnel data – employee who carried out the operation, number of employee involved in the operation -Work center -Goods movements – planned and unplanned -Variance reasons -PRT usage

SAP ERP Page 6-11 © SAP AG Goods Receipt  Acceptance of the confirmed quantity of output from the production order into stock -Effects of the Goods Receipt Updates stock quantity Updates stock value Price stored for future valuation changes Production order is updated -Three documents are created Material document Accounting document Controlling document

SAP ERP Page 6-12 © SAP AG Order Settlement  Consists of settling the actual costs incurred in the order to one or more receiver cost objects -Receivers could include: a material, a cost center, an internal order, a sales order, a project, a network, a fixed asset  Parameters for Order Settlement -Settlement Profile Specifics the receivers, distributions rules and method -Settlement Structure Determines how the debit cost elements are assigned to the settlement cost elements  Settlement Rule -Automatically assigned on creation of order, the parameters are used to define this rule Has one or more distribution rules assigned to it Distribution rules defines: cost receiver, settlement share, settlement type

SAP ERP Page 6-13 © SAP AG Order Settlement  Settling a Production Order to Stock -Debt posting is made to the Production Order with the value of the material -Difference between the debt posting and credit posting is posted to a price difference account MaterialProd. OrderPrice Diff * Material Price is determine by the quantity produced times the Standard Price in the Material Master.

SAP ERP Page 6-14 © SAP AG Order Settlement  Costs analyzed -Primary Materials External Processing -Secondary Production, Material, and Administrative Overhead Labor  Cost Analysis Reporting -Calculate and analyze planned costs, target costs, and actual costs of the production order. -Calculate and analyze variances