Site Construction & Installation Services

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Investment Com. GIC To Enrich Life Through Communication.
Power, Telecom, Mechanical and Lighting Systems Solutions
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Outside Plant Network Topologies October Emerson Electric Co; Proprietary Information Table of Contents Fiber to the NodeFTTN Network with Non-Hardened.
for Pipelines & Casings
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
Modular Capacity - Test - System CS
iDAS / oDAS Services Statement of Quality Professional Teleconcepts, Inc. is dedicated to the goal of being a premier provider of high quality engineering,
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
Antenna Installation. Installation Study the location antenna pattern Study the location antenna pattern Evaluate the most effective antenna in the location.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
March ULTIMA Portfolio For Sourcing Wireless Networking Page 1 Your Wireless Network requirements.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Domestic Installation: Switch Circuits
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Rapid deployment of Community Power as a strategy to cheaper BTS power Declan Murphy, Founder Owenroe Lemass, Renewables Engineer Clive Gilmore, Technical.
1CUL.PPT Last Revised: 10 June 2005 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
Chapter 8 Electrical and RF Safety Basic Safety Have a master on/off switch for your station. Don’t work on “live” equipment. Check with a meter first.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
AMMAR ENGINEERING SERVICES
1 Community-Owned Networks Edith Ofwona Adera Senior Program Specialist, IDRC ICT4Dev Southern Sudan 2010.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
1CUL.PPT Last Revised: 10 June 2003 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
Building Your LPFM Station Presented by John George.
Streamlined Environmental Requirements for Distributed Antenna Systems (DAS) and Small Cells.
Electrical & Control Power Supplies Trevor Hartnett.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
Ericsson Tower Tube. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Guanri Telecom-Tech Page 1 Company Profile Guanri Telecom-Tech Page 2 Our Mission & Vision Our Mission is to provide the state of art wireless and.
COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.
1  Services Overview  Implementation plan (capacity overview)  Summary of completed project Site Design Services.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
18 Electric Circuits Connecting light bulb What you need  three light bulbs  a number of connecting wires  a battery What to do 1. Try to connect the.
“HVDC TRANSMISSION” SUNIT KUMAR SAHOO REG NO-S BRANCH-EEE PREPARED BY.
ESS Grounding System Concept Fundamentals and Requirements
Internet - To - Go Dr. Bob Dixon Chief Research Engineer OARNet and Ohio State University A Small Mobile Satellite System for Internet Access Anywhere.
For : PRABHAT DAIRY LIMITED. BIGMARK MEDIA DIGITAL MARKETING PROPOSAL.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
Chapter 6: Voltage Regulator
iDAS / oDAS Services Statement of Quality Professional Teleconcepts, Inc. is dedicated to the goal of being a premier provider of high quality engineering,
S A Griffiths CM42 June 2015 Electrical & Control.
Enjoys a worldwide reputation for excellence. Personnel average 20 years experience in the satellite communications industry Field Engineering Installs/Deinstalls/Disaster.
Radio Base Stations Sited on Power Line Towers
Communications Infrastructure Update Translator Advisory Board
Implementation of a School-based Payroll Preparation
Enterprise Wireless Solutions
Business opportunities related to CERN electrical network
RV Solar Panel Installation
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
The Role of the Communications Unit Leader
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
A. Touching both terminals with the hands can cause electrical shock
How Is In-Building Wireless System Importance and How Big Is the Market Size?
Presentation transcript:

Site Construction & Installation Services Overview Work breakdown Structure capacity overview Summary of completed project

Site Construction & Installation Services Services overview Site Construction & Installation Services Our Civil Works group specializes in the design, construction and installation of radio base station sites. Our construction and installation services include : Earth work and site work Site construction included foundation and fence work Tower and antenna support structure installation and rigging Lighting protection and grounding system GSM & MW antenna installation i/c testing, commissioning Power supply and connection Work in progress control “As-built” drawings Cabin / cabinet / indoor equipment installation Follow-up until final acceptance We have also developed the expertise to : Deploy temporary radio base station sites Swap-out radio base stations from different infrastructure vendors in a live network environment

Work breakdown structure Site Construction & Installation Services

Site Construction & Installation Services Capacity Site Construction & Installation Services Our capacity is to run 12 sites in parallel and we may 1.5 time our sources to reach upto maximum 18 sites parallel.

Site Construction & Installation Services Completed site Site Construction & Installation Services STC 45 sites with etisal, Edwa shehab and ACES ITC 4 Sites Mobily - Construction 57 sites with etisal, interkey & ACES.