Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, 17-19 November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Upcoming TIEDI ® OMB Changes Q&A Session Implementation date: March 31, 2015.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
1 Dissertation & Comprehensive Exam Process Dissertation Process Comprehensive Exam.
1 Dissertation Process 4 process overview 4 specifics –dates, policies, etc.
NH Department of Education NH Department of Education Developing the School Improvement Plan April 15, 2011 Referencing requirements for Schools in Need.
Biology 475 Topics in Applied Microbiology. Biology 475 Official Course Description BIOL 475 LEC,SEM 0.50 Course ID: 1101 Topics in Applied Microbiology.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Full Process: From Application to Finalization
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Content Strategy.
1 PREPARING FOR AND CONDUCTING A PLANNING GRANT MEETING The Nonwovens Institute NC State University, Raleigh NC Behnam Pourdeyhimi Phone:
Revised 10/20/04Version 2.4Page 1 of 22 People First Manual Timesheet Training Guide Section 2 -- Training Scenarios.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Agenda Friday (Summary) Slot 1: General meeting / WP3.1 + WP3.2 (events) [9-10:30] Future of Kweb education area beyond 2007? –EASE academy –Continue summer.
KnowledgeWeb Outreach to Industry KnowledgeWeb O2I Plenary Report Heraklion, 14 May 2004 Industrial Applications and Promotion Knowledge Web.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Welcome to Technical Communications Enl Overview Course structure Course structure Course schedule Course schedule Student assessment Student assessment.
ASTRONET Coordinating Strategic Planning for European Astronomy T HE N ETWORKING.
MA Thesis/Papers-In-Lieu Overview and Process. Thesis: What is it?  A thesis is a scholarly manuscript that reports on a significant in-depth investigation.
11-17 October 2014 Barcelona, Spain C&RG SWP Report WHO - FAMILY OF INTERNATIONAL CLASSIFICATIONS NETWORK ANNUAL MEETING 2014 Committee and Reference Group.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Final Year Project 1 (FYP 1)
KnowledgeWeb General Education Area Meeting Hanover, January 2005.
Financing Natura 2000 WORKSHOPS 2nd meeting of the Steering Group, 2 March 2006.
CRISP 1 st Workshop June 20, 2001 Communication and Dissemination Status of work Sylviane Nibel, CSTB (F)
The Education Framework (or: What’s going on in the education area) Jörg Diederich (L3S) Berlin meeting, 2007.
WP7 - workshop. Project newsletter – Electronic format Partners’ mailing lists – Inform about partners’ participation in InterQuality – Ongoing information.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
INCOSE 2015 Chapter Awards Chapter Instructions for Award Spreadsheet & Evidence Submission.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Dr. Thomas Tomasi Associate Dean, Graduate College.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
WP1: Plan for the remainder (1) Ontology –Finalise ontology and lexicons for the 2 nd domain (RTV) Changes agreed in Heraklion –Improvement to existing.
Critical Step Web Site Presentation. Ing. Carlo Sanghez Consorzio Interuniversitario Nazionale per l'Informatica Napoli,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP3: Excellent researchers for the community Institutional framework for development of the third mission of universities in Serbia (IF4TM) Coordination.
Preparation of the Self-Study and Documentation
WP8: Demonstrators (UniCam – Regione Marche)
Summary of the discussion on Vision document
Dr. Thomas Tomasi Associate Dean, Graduate College
Global Grid Forum GridForge
Sequencing Writing Assignments
All Wales Safeguarding Procedures Review Project
Sequencing Writing Assignments
doc.: IEEE <doc#>
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
Coventry, Jun, 2016 – Coordination of activities related to WP3 –
doc.: IEEE <doc#>
To the ETS – Encumbrance Online Training Course
doc.: IEEE <doc#>
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
doc.: IEEE <doc#>
NERC Reliability Standards Development Plan
IEEE IMT-Advanced Review Process
doc.: IEEE <doc#>
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
To the ETS – Encumbrance Online Training Course
NERC Reliability Standards Development Plan
IEEE IMT-Advanced Review Process
IFLA LRM adopted! Top congress news!
Presentation transcript:

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 1 WP 1.1 (FT) Applications needs Progress to date and Conclusions Berlin 17 Nov. 2004

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 2 Industry Board and Policy FT task 1 Task 1: Establishment of an industrial Board (FT) –Industry board expansion underway 28 as Berlin meeting, 50 by end of 2004 –CA & Policy for final approval by EPMB signature by KW partners nearly completed –Early access Policy to be sent to IB members for signature rules in case of remarks on content –New Industry partners Invitation on O2I KW portal

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 3 Use Cases FUBerlin Task 2 Task 2 : System Requirements Analysis (FUB) –Populating each economical sector with Business Cases underway on KW portal –Recruiting Cases: F2F industry board meetings get started Q3/2004 F2F meeting are progressing well The Use Case format is well accepted Communication channel through the Industry portal –Number of Cases in D 1.1.2: –Proposition to get an excellent description on max Use Cases (D1.1.2 v1) –To be continued over 2005 to fill the gap Industry domains and applications scenarios

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 4 Knowledge Processing Uni Trento Task 3 Task 3 : Knowledge Processing needs and components –Knowledge processing needs already detailed on few (4) Use Cases from D1.1.2 Use Case Portfolio –A simplified RUP methodology was used in order to identify KP tasks –Needs “walk-through” illustrative examples for presentation and test –Needs concrete and focused sub-scenario with data to explicit the critical K components –Proposition to get an excellent KP analysis examples (10 from D1.1.2) to issue a D v1 –Worry: Size of the document if analyzed Use Cases. The bottom line for incusion of a use case should be its added value, i.e., new knowledge processing tasks with respect to the already included use cases.

Knowledge Web Discussions and Resolutions Berlin November

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 6 WP 1.1 Hot Topics (discussed in Berlin) WP 1.1 Self-assessment (see EPMB schedule) (see EPMB schedule) –Draft (sent 15 Nov to WP1.1) and refined during Berlin meeting (Drafted revised)Drafted revised –Area manager summary submission EPMB conf 25 Nov New JPA (see EPMB schedule) (see EPMB schedule) –In formal review (Brian Macklin) : less paper work and focus on 3 key Use Cases –Needs to focus on what directly matters industry also get the Industry Board advice on new JPA before the pre-review meeting (17 Dec) KW – Industry communication channel improvements –Web site (newsletter, contents, Use Cases collection and Analysis –F2F, mails, … –« D » will move to the O2I web site (all new Business Cases will be on site only) –D v1 (~10 analysed Use Cases) then Analysis should be pursued till « saturation » KW – Industry board growth –50 end of 2004, 100 end of 2005 … Each O2I member must contribute !! –FT must be the editor of the members list To avoid mis-alignments Early Access Policy –To be sent by FT WP1.1 internal web site –FT will open it very soon

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 7 WP 1.1 Decisions (Berlin 17 Nov) D1.1.2 Business Cases –Latest version sent Monday 15 Nov, new version by end of November –11 BCs …. 20 BCs foreseen by 15 Dec (DIP scenarios, Obelix, Biovista, SNCF, Daimler, BT) –Methodology to recruit BCs is now stable Send the form style and example prior to the F2F meeting Complete/Interpret the content of the form with the Industry during the F2F meeting –Note wherever possible where the semweb technology does not make sense at all –Defense applications needs further approval from EPMB –Introduction on Business/Market related info (World dev. Report, etc.) D Knowledge processing components –Latest version sent Wednesday 10, new version end of November –10 Analysis foreseen by 15 Dec –Scenarios reviewed and detailed AceMedia scenario detailed by CERTH-ITI (Guus stressed the importance Multimedia cases!) Also FT, FUB

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 8 Industry Portal documents list (Berlin 17 Nov.) (open 10 November 2004) Look and feel of the Industry portal –KW O2I partners comments? –Industry Board comments? Business Cases in each economic sector –Add the number of available Business Cases Newsletter Personalized login/password for each Industry Board member « Become a member »: –Invitation letter (ok) –Statement of interest (ok) –Early Access policy –Submit the statement of interest –Correct the « Membership in industry board » on left column Update the Industrial board members list Technology evaluation Technology recommendation –Best Practices: invitation to contribute to the questionnaire (Luigi Lancieri) –Démos / applications (see Ellen Shulten for possible link to W3C) « Application needs » top menu –Business Case Analysis –Knowledge Processing and system requirements (D1.1.3 and D 1.1.4) –classified by economic sectors

Knowledge Web ©KnowledgeWeb – KnowledgeWeb O2I, Berlin, November 2004, Page 9 Industry portal documents list (2) Network cooperations –See WP 1.5 Ying Ding Technology evaluation and recommendations –See WP Mustafa Jarrar Events/Industrial WS –Slides and main documents –ESWC’05 Heraklion May/June 2005 –Industry event, RW-KW, Munchen October 2005 –Mistakes to be corrected Events/Knowledge meetings –O2I KW meetings Deliverables –Draft only for comments from Industry –Access to D ? Links –To be removed and put Network cooperations instead Contacts –Homepage AL missing