IEEE DASC Co-Sponsorship of UPF Working Group Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0217r2 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Advertisements

Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
1 Japan NC & JEITA/EDA-TC Update IEC/TC93/WG2 on 5-9 September 2005 in Nara, Japan EDA-TSC/STD-TSC in JEITA WG2 in TC93-JP Renesas Yoshio Okamura.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Ashenden Designs IEEE DASC Steering Committee 2 December 2003 San Jose, CA, USA Peter Ashenden DASC Interim Chair.
Design VASG Kicks-Off VHDL 200x Stephen Bailey Chair.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
P1800 SystemVerilog Proposed Operation Guidelines & Structure Johny Srouji (group chair)
Ashenden Designs IEEE DASC Steering Committee 20 September 2004 Piscataway, NJ Peter Ashenden DASC Chair.
Ashenden Designs IEEE DASC Steering Committee 19 February 2004 Paris, France Peter Ashenden DASC Chair.
IEEE MEDIA INDEPENDENT HANDOVER DCN: mugm Title: Group Management TG Opening Note Date Submitted: September 18, 2012 Presented at.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Slide 1 IEEE Standardization Issues for SPIRIT Options, Costs, Impacts Victor Berman, 28 July 2005.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
P Dec-15 IEEE P1801 Working Group (Unified Power Format – UPF) Status Stephen Bailey Chair, P1801 Working Group.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
IEEE Design Automation Standards Committee (DASC) Peter Ashenden IEEE DASC Chair.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
DASC Steering Committee 17 June 2005 Peter Ashenden DASC Chair Victor Berman DASC Vice Chair.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Omniran ecsg 1 OmniRAN EC SG Agenda February 28 th, 2013 Conference Call Max Riegel (OmniRAN SG Chair)
Doc.: IEEE r0 Submission September 1999 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE Working Group for Wireless Personal Area Networks WG Ballot.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
IEEE-SASB Audit Committee update for IEEE 802 July 2008 Glenn Parsons Chair.
DASC Overview October, 2008 Victor Berman, Chair (Improv Systems) Stan Krolikoski, Vice Chair (Cadence) Kathy Werner, Secretary (Freescale) Karen Bartleson,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
P SystemC Analog/Mixed-Signal (AMS) extensions Working Group July 6, 2015 | Martin Barnasconi | P Chair.
January Session Supplementary Material
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGa Project Timeline
TTC Activities on IPR in Standards
myProject Redesign: Status & Preview
Sub-1 GHz Study Group Closing Report Sept 2018
<month year> doc.: IEEE < md> September, 2018
SG4a Project Timeline January 2003 doc.: IEEE /056r0
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Convergence Bidding Working Group – 10/22/09
doc.: IEEE <doc#>
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
<month year> Denver, March 2006
November 2011 WG11 Motions for the EC
RTA TIG Agenda Date: Authors: March 2019
<month year> doc.: IEEE < e> <July 2018>
IEEE IMT-Advanced Review Process
Submission Title: [Proposed project timeline]
<month year> doc.: IEEE < e> January 2012
RTA TIG Agenda Date: Authors: March 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
QoSMAN SG Closing Report – Nov 2009
IEEE IMT-Advanced Review Process
RTA TIG Agenda Date: Authors: March 2019
IEEE SGa Project Timeline
March 2018 Project: IEEE P MD
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4t (Higher Rate) Opening.
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
<month year> <January 2019>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> January 2012
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for TG w May 2019 Interim Meeting]
PAR Extension Motions Date: Authors: July 2016 Name Company
After this meeting… Voting period begins
<month year> doc.: IEEE < e> <Mar 2018>
Presentation transcript:

IEEE DASC Co-Sponsorship of UPF Working Group Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee

2 Agenda Request for DASC co-sponsorship of WG Background of UPF-TSC UPF from start to finish IEEE and Accellera relationship Working group IEEE Timeline

Background for UPF-TSC

4 Industry Need Power has become the dominate factor in the design of today’s electronic systems –Explosion in battery operated systems –Many (most) non-portable designs are also constrained by power consumption requirements Heat generation and dissipation Practical power supply & management Current state is a hodge-podge of commercial and ad hoc solutions –SAIF, GAF, etc. –Specification of power aware design characteristics Often done late at gate-level and ad hoc –Need to verify correctness of power-aware functionality –Done sooner and with higher correlation to design intent

5 Demonstrated Need DAC 2006: –TI and Nokia organized a meeting on the topic of an open standard for low power design flows –The 4 top EDA vendors attended Plus Atrenta –Broad, significant user representation including TI Nokia ARM ST Philips Sun –Shrenik Mehta represented Accellera Demand for Open, Fast, Inclusive standard

6 Mission of Accellera Low Power Flow TSC The accelerated development of an open, comprehensive standard for the specification of power-aware requirements, design intent and implementation, verification and analysis across all design abstraction levels.

7 Proposed Timeline Week OfMilestone 28 Aug 06Accellera TSC formation 11 Sep 06Accellera/Si2 Sponsored Workshop 18 Sep 06Design Objectives Document; Weekly meetings start 30 Oct 06First drafts available for review 30 Nov 06Submission to Accellera Board for Approval 31 Jan 07Hand-off to IEEE and/or other suitable standards organizations

UPF from Start to Finish August 28, 2006 – January 23, 2007

9 Actual Timeline Week OfMilestone 28 Aug 06Accellera TSC formation 18 Sep 06Frequent telecon and face-to-face meetings commence 25 Sep 06Design Objectives Document 05 Oct 06Accellera/Si2 Sponsored Workshop 23 Oct 06All donations accepted 6 Dec 06Prospective UPF WG previewed at CAG meeting 27 Dec 06First draft available for review

10 Actual Timeline Week OfMilestone 19 Jan 07Final draft available for review 23 Jan 07Final draft completion 23 Jan 07Accellera TSC approval 24 Jan 07Submission to Accellera Board for Approval 26 Jan 07Proposal for DASC co-sponsorship P 9 Feb 07Submit PAR for NesCom consideration P 22 Feb 07Accellera Board approval of UPF P 23 Mar 07NesCom approval; Accellera UPF donation to IEEE P = planned

11 Highlights Openness demonstrated throughout –Everyone invited and allowed to participate in TSC Accellera membership not required to join –Documents available to all TSC members Fast –Merely 5 months from start to finish Inclusive –Unprecedented donations from 8 companies –EDA suppliers and users donated –Members and non-members of Accellera

IEEE and Accellera Relationship

13 Accellera and IEEE Accellera has long-standing relationship with IEEE Accellera Technical Committee Policies, Procedures, & Guidelines: –All established Accellera standards are eventually planned for IEEE standardization to speed worldwide acceptance of such standards. –Specification format, strawman donation and any other ownership documents follow or exceed IEEE rules and guidelines. Plan of record is to transfer UPF to IEEE when complete Since inception of IEEE Corporate Standards Program, Accellera Board recommends all standards be entity- based –SystemVerilog, PSL, OCI, UPF

CAG/DASC UPF Working Group

15 UPF Working Group –Submit draft PAR to DASC Chair for SC review and comment NLT 31 Jan 07 –Sponsor PAR jointly with CAG Draft PAR presented to CAG ~6 Feb 07 –Entity-based –Open to everyone –Initial WG chair: Stephen Bailey Conduct elections within DASC required 6 month period for all WG officers –Follow prior precedent of operating procedures for jointly sponsored WGs

IEEE Timeline

17 IEEE Timeline DateMilestone 26 Jan 07DASC approval of co-sponsorship (With opportunity of SC to comment on PAR before CAG consideration) 06 Feb 07CAG approval of joint sponsorship for PAR 09 Feb 07PAR submission 22 Mar 07NESCOM approval of PAR 23 Mar 07Formation of working group and call for contributions

Request approval of DASC-SC for UPF Working Group Co-Sponsorship Thank you!

19 On Convergence The UPF WG is willing: –To accept more than one technology donation –Provide the forum for converging multiple industry formats into a single standard –Change the name of the resulting standard Conditions: –Only one: All donations for consideration must be submitted quickly