11 A Natural Gas to Petrochemical Complex Union Industrial Estate, La Brea Presented on August 29th, 2013 NESC, La Brea.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

A Natural Gas to Petrochemical Complex
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
PPPs in the Energy Sector Co-Generation – Belize Launch/Planning Meeting REETA Project Georgetown, Guyana February 10-12, 2014 T. Williams-Robertson Head,
Part III Solid Waste Engineering
PRESENTATION FOR Bradford Environment Action Trust ON THE AUTOCLAVING OF MUNICIPAL WASTE PRESENTATION BY RICHARD LONGCAKE AND IAN BAIRSTOW 7 TH SEPTEMBER.
Project Mthombo Update 3 June Background The project entails the construction of a new crude oil refinery for PetroSA to be based in Coega, Port.
Objectives: Understand importance of utility and maintenance system in industry/plant.
Local Control of Mining Rights Counties Often Have Comprehensive Land Use Plans –These may be implemented through zoning –Often require construction permit.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Fuels Systems Management Program CRTP First Nation Communities Types of Facilities Commercial (gas station); Industrial (remote Fuel Farms); Residential.
EVALUATION OF LIQUEFIED NATURAL GAS RECEIVING TERMINALS FOR SOUTHERN CALIFORNIA April Chan Jana Hartline Rob Hurley Leanna Struzziery Faculty Advisors:
+ Careers in Electricity. + Outcome for today: Outcome EL6.1: Assess personal, societal, economic, and environmental impacts of electricity use in Saskatchewan.
Confined Spaces in Construction: Applicable Standards Stan Liang, CIH, CSP, CET KTA-Tator, Inc.
Emergency Response & Control Procedure Emergency Response and Control Procedure (HSE-S-229) Best ERCP practices at RIL Jamnagar.
What is RCRA? The Resource Conservation and Recovery Act (RCRA) was passed in 1976 as an amendment to the Solid Waste Disposal Act. Amendments were added.
Restoration & Recovery Services Manchester Claims Association November 10 th 2011.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
Permit to Work Procedure Document Number: KOC.SA.004
State Debris Management Plan California the “Disney Land of Disasters”
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
SQF ISO FSSC GMP Programs
1 Plasma and Renewable Energy Center (PREC) José L. Colón School of Engineering Universidad del Turabo.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Municipal Tax Increment Financing
COMPANY PRESENTATION COMPETENT ENGINEERING FOR YOUR BUSINESS SUCCESS.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
Community Preparedness & Disaster Planning. Why Disasters occur ?
‘OHS - A Survival Kit’ State Library of Victoria Buildings & Facilities Division (OHS) Occupational Health & Safety ‘A Survival Kit’ February 2002 Presenter:
Spanish Engineering Worldwide. 46 Associated engineering companies presented in more than 94 Countries in the last 5 years 84 Countries with its permanent.
RCRA 101 Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
| [Contractor Safety Training] 1 Environmental Policy for Contractors.
Industry Study. What is the Industry Study? According to the Board of Studies Syllabus the Industry study is when the “Students will undertake a broad.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
LABORATORY DESIGN AND SAFETY EQUIPMENT. 1. LABORATORY DESIGN a. Egress b. Traffic Patterns c. Floor Surfaces d. Master Controls e. Automated Detection.
We’re proposing to modernize our Rodeo Refinery to recover propane from our refining process, and better recover butane — to cut sulfur dioxide emissions.
U.S. General Services Administration Josh Sawislak Chief (Acting) Office of Emergency Response and Recovery 27 March 2008 National Response Framework ESF-7.
Unit Objectives  Describe the types of hazards to which your community is vulnerable.  Describe the functions of CERTs.  Identify preparedness steps.
Financial Issues in Solid Waste Management Expenditures -capital investment -operational investment Revenues.
Health and Safety Policy
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
OSHA Office of Training and Education1 Safety and Health Programs.
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
OSHA Most Frequently Cited Serious Violations General Industry - FY-2001.
Council assistance – we are here to help. Program Introduction Traffic Management Council assistance including food handling Finding and applying for.
Municipal Solid Waste Power Plant Project DL ENT Co., Ltd.
Tunnelling underground space MSc Tunnelling & Underground Space Environmental management on site part 1.
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Director:Mrs SCN Mdakane Office Location:111 Amajuba Building Contact Details: Tel: Fax: Mobile: (Work Only) DEPARTMENT.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
1 OIL EXTRACTION – A Case Study of Trinidad & Tobago Managing the Extractive Sector for Development in Guyana 2012 November 14 th -15 th Presented By:
Ch 1 Construction accidents 1. Health and safety definitions Health is the protection of the bodies and minds of people from illness resulting from the.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
Methanol Market Analysis, Market Size, Analysis 2015 To 2022 Grand View Research has announced the addition of " Global Methanol Market Analysis And Segment.
Uniper Energy Services
Health and Safety Policy
Westbrook Contractor Safety Training April 5, 2018
SQF ISO FSSC GMP Programs
STATEMENT OF QUALIFICATION
Progress Presentation on: Production Cost Analysis By
STATEMENT OF QUALIFICATION
Presentation transcript:

11 A Natural Gas to Petrochemical Complex Union Industrial Estate, La Brea Presented on August 29th, 2013 NESC, La Brea

2 AGENDA 1.Introduce the Project Sponsors 1.Mitsubishi Corporation 2.Mitsubishi Gas Chemical Co. Inc. 3.Neal & Massy Holdings Ltd. 2.Project Site 3.The Project 4.Activities to be undertaken by CGCL 5.Logistics 6.Possible Impacts/Risks 7.Proposed Mitigation Measures 8.Questions A CEC[CEC3859/2013] is being sought from the EMA to proceed with A Natural Gas to Petrochemical Complex

33 We are the project sponsors… Represented by Mr. Hiroshi Kita Represented by Mr. Chikara Jitsumatsu Represented by Mr. Linford Carrabon Mitsubishi Gas Chemical Co. Inc. has been developing chemicals in a wide range of fields, from basic to specialty chemicals. Our business Segments include: Natural Gas Chemicals Aromatic Chemicals Specialty Chemicals Information & Advanced Material (Website) Mitsubishi Corporation operates companies in 6 Business Groups: Industrial Finance, Logistics and Development Group Energy Business Group Metals Group Machinery Group Chemicals Group Living Essentials Group (Website) Neal & Massy Holdings Limited is the parent company of the Neal & Massy Group of Companies. We operate mainly in Trinidad and Tobago, Barbados, Jamaica and Guyana. Key Business Units: Retail Distribution & Logistics Consumer Finance Automotive & Industrial Equipment Energy & Industrial Gases Information Technology & Communications (Website)

4 Project Sponsors’ roles Technology LicensorProject Coordination Local Content

Project Site UNION VILLAGE VESSIGNY VILLAGE SOBO VILLAGE 5 A “Brownfield” site Approved and zoned for heavy gas based industrial development Substantial infrastructural works already installed.

6 Development of a project for the commercialization of natural gas-based petrochemicals. The plant which will be constructed will produce 1,000,000 tonnes per year of Methanol 140,000 tonnes per year of Methanol produced will be used to produce 100,000 tonnes per year of Di-Methyl-Ether (DME). The Project…

7 What is Methanol?What is DME? Clear, colourless LIQUID Looks like water No odor in low concentrations Flammable Clear, colourless GAS Slightly sweet odor Flammable Similar physical properties to LPG About Methanol and DME

88 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14 Q3 14 Q4 14 Q1 15 Q2 15 Q3 15 Q4 15 Q1 16 Q2 16 Q3 16 General FEED / EPC LOAN CEC Pre Development Construction FID PDA STARTUP GAS TERM SHEET Negotiation FEED CEC Process (Target) Preliminary Works Negotiation Application CGCL Project Schedule PDA-Project Development Agreement FID-Final Investment Decision FEED-Front End Engineering Design EPC-Engineering/Procurement/Construction CEC- Certificate of Environmental Clearance Legend Completed In Progress After FID

9 Activities to be done GENERAL  CGCL needs to successfully complete many activities during the Pre-Development Stage (CEC / Contracts Negotiation / Finance Arrangement / etc).  Target Final Investment Decision by Shareholders March, 2014 CONTRACTS  Many contracts including water and electricity still need to be finalized

10 Activities to be done FEED  Targeting to be complete in November 2013 LOAN  Targeting to reach an agreement by March 2014 CEC  Our consultant “REAL” will present

11 OPERATIONS (METHANOL) PRODUCT METHANOL DISTILLATION SYNTHESIS COMPRESSION REFORMING DESULFURIZATION NATURAL GAS FUEL GAS STEAM PURGE GAS

12 OPERATIONS (DME) METHANOL Waste Water METHANOL RECOVERY DME PURIFICATION DME SYNTHESIS METHANOL FROM METHANOL PLANT DME

13 THE IMPACT ON : HEALTH ENVIRONMENT SAFETY THE COMMUNITY Project Impact & Mitigation Measures Local / International standards i) Mitigation / Management plan ii)Emergency countermeasures to be installed

There is no known adverse negative health impact from the production of Methanol & DME 7 Methanol Plants in Point Lisas / One of the oldest products in the petrochemical industry DME has been long used for propellant for hair spray Assessments will be conducted as per the CEC requirements by the EMA Health Impact 14

Dust & Noise from Piling - mitigation measures in place Traffic - There will be increased traffic during construction. As part of the CEC requirement a Traffic Management Plan will be developed. Water Quality – Storm Water Management will be developed Construction Waste- Standard Waste Disposal Methods-Bins on site to segregate waste & Industrial waste treatment Environmental Impact. During Construction During Operations Water Effluent– Appropriate treatment. Historically no adverse environmental impact has been reported Air Quality and Noise will be monitored and will be within EMA requirement. 15

16 Handling Spills - Storage tanks surrounded by dirt dyke - Spill Kits will be put in place Fire - Fire Tender - Fire Fighting System Medical - Emergency Medical Technicians on site - Ambulance - First Aid Facility Safety

Employment (Expectation from the experience of another project) During Construction – 3000 jobs (peak time) Operations - Direct 180 jobs - Indirect 200 jobs Site Workers/Employees – Point Lisas Energy Association (PLEA) Pass Card certified Local Contractors/Sub Contractors – Safe To Work (STOW) certified Training & Development - Plan to be developed to increase skills of local personnel (via continuous discussion with surrounding community) Community Development. 17

18 NEC Communication Centre Telephone Numbers / Website: CONTACT INFORMATION

19 QUESTIONS