J. Feikes; Status of MLS European Synchrotron Light Source XVI. Commissioning of the Metrology Light Source in Berlin Adlershof J. Feikes for the BESSY&PTB-Commissioning.

Slides:



Advertisements
Similar presentations
Welcome to Who Wants to be a Millionaire
Advertisements

Slide 1 Insert your own content. Slide 2 Insert your own content.
MedAustron – Austrian Hadron Therapy Centre
E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
Low Alpha & CSR in the MLS (PTB) G. Wüstefeld (BESSY) et al, ESLS XVI, Daresbury, Nov 28th Low Alpha Optics and Coherent Synchrotron Radiation.
Accelerator Science at Daresbury - the early years A close-up and personal view by Vic Suller (Louisiana State University/CAMD)
1 Diamond RAL Particle Physics Masterclass 12 March 2003 Glenn Patrick
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
BLM System for NSRL HLS PCaPAC 2000, Oct.9 ~ 12, 2000Page 1 PC and CAN Bus in Beam Loss Monitor System for NSRL Yonggang Cui, Beibei Shao Department of.
ESLS 04 Daresbury Laboratory
Low Emittance Tuning (LET). Through Dispersion Free Steering.
Randomized Algorithms Randomized Algorithms CS648 1.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
WG-D: Commissioning Strategies, Operations and Performance, Beam Loss Management, Activation, Machine Protection Conveners: J. Galambos, T. Koseki, M.
Cyclotron Refurbishing & Development Meeting March 6, 2008.
Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
J. Feikes, HZB (Berlin, Germany) The Metrology Light Source, ESLS XXII,Grenoble, France November 2014 The Metrology Light Source - Status Jörg Feikes,
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Beamstrahlung and energy acceptance K. Ohmi (KEK) HF2014, Beijing Oct 9-12, 2014 Thanks to Y. Zhang and D. Shatilov.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
Status of the Spanish Light Source David Beltrán.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
G. Wüstefeld (HZB, Berlin) et al., MLS Low- , Future Light Sources, March 5-9, 2012, Jefferson Lab, USA 1 A. Hoehl, R. Klein, R. Müller, G. Ulm PTB Berlin.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Bending Magnets for the Metrology Light Source
1 R. Müller, HZB, Automation Dec , Lund Automation at light sources: BESSY II, MLS examples General Automation Tasks Baseline operational states.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
J. Feikes, HZB (Berlin, Germany) Experimental Observations at the Metrology Light Source, LER15 Grenoble, France 15-17/9/15 Experimental observations at.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
Coupling Correction at the Australian Synchrotron
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Scrubbing progress - 10/12/2012
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
ELENA Extra Low ENergy Antiproton Ring
Electron Rings Eduard Pozdeyev.
Status of the ASTRID2 RF systems
BEPCII Background Issues: Collimators and Masks
Update on MEIC Ion Polarization Work
Presentation transcript:

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Commissioning of the Metrology Light Source in Berlin Adlershof J. Feikes for the BESSY&PTB-Commissioning Team MLS = Light Source owned by the PTB (??) optimized as a VUV to THz Source built and operated by former BESSY now HZB A dedicated design to include THz generation (Godes Talk)

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Metrology Light Source Some MLS parameters 48m circumference Double bend achromat lattice 200MeV - 600MeV operating energy 1 electron up to 200mA current 105 MeV injection Microtron

J. Feikes; Status of MLS European Synchrotron Light Source XVI. July 13, 2007 first accumulated beam 1mA Aug 14, 2007 first beam ramped to 630 MeV Aug 25, 2007 accumulation up to 10 mA by slow injection (every 6 s ) Sep/Oct 2007 current limit around 12 mA --> Ions April 1, 2008 start of user operation May 5, 2008 design current of 200 mA reached Nov 14, 2008 u ndulator U180 succesfully commissioned MLS Commissioning Milestones

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Accumulation up to 10 mA by slow injection (6 s ) current beam current / mA current loss per shot

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Injection problems caused by ions current increment cause poor lifetime at I >few mA reason: beam blow up due to ions. Beam fills aperture completely solutions: ion clearing (-300V at 8 BPMs at ends of straights) beam shaking at transversal Tune beam scrubbing -> next slides

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Cycling with minor beam loss 1.faster current refill 2.radiation protection - no beam MeV 3.simplifies automated scrubbing

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Automated beam scrubbing tool: Operation Master automated operator (state machine)

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Operation Master –flow chart

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Beam Scrubbing – Operation Master (detail) highly complex minimizing operator errors develops iteratively by practical use good experience with automated operation correct ramp tables loaded ?

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Automated Beam Scrubbing at MLS

J. Feikes; Status of MLS European Synchrotron Light Source XVI. Beam Scrubbing – efficiency still improving

J. Feikes; Status of MLS European Synchrotron Light Source XVI. MLS – typical user operation conditions typical initial currents of 120 – 140 mA at 8 hrs LT typical Run time 6 hrs Injection cycle: Ramp-Down-Refill-Ramp-Up ~ 15 min