Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.

Slides:



Advertisements
Similar presentations
Doc.: 18-14/0021 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Advertisements

Doc.: 18-13/0107 Submission November, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: 18-12/0111 Submission November, 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: Submission November 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-12/0022 Submission March 2012 MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE
Doc.: 18-14/0055 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-14/0014 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-12/0036 Submission March 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-12/0076 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Submission doc.: IEEE /0019r0 March 2015 Steve Shellhammer, QualcommSlide 1 March 2015 Opening Report Date: Authors: Notice: This document.
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
Doc.: 19-11/81r1 Submission July 2011 Junyi Wang, NICTSlide Liaison Report Notice: This document has been prepared to assist IEEE It is.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
ITU-R Liaison Group Report - Session #73 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0020 Date.
Doc.: IEEE Jan07-RR-TAG_Liaison_Report.ppt _RR-TAG_802.22_Liaison_Report_Jan07 Submission January 2007 Peter Murray,
ITU-R Liaison Group Report - Session #73 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0029 Date.
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the May 2009 interim.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
Doc.: IEEE November06-RR-TAG_Liaison_Report.ppt _RR-TAG_802.22_Liaison_Report_November06 Submission November 2006.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Submission November 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the September 2011 interim meeting.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on January 2007 interim meeting Work.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Metrology SG Closing Report – Session #82 [IEEE Mentor Presentation Template (Rev. 0)] Document Number: R0 Date Submitted:
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Closing Report Report of the July 2009 plenary.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE /0078r1 Submission September 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report July 2007 IEEE Notice:
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 15-16/0109r00 Submission Liaison Report from Date: 21 January, 2016 January 2016 Jay Holcomb, Itron, Inc.Slide 1 Notice: This document has.
Doc.: IEEE /0047r0 Submission March 2012 Reinhard Gloger, Nokia Siemens NetworksSlide Liaison Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0034 Submission July, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission May 2008 Michael Lynch, Nortel Networks RR-TAG Opening Report Report on March 2008 plenary meeting.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Metrology SG Closing Report – Session #81 [IEEE Mentor Presentation Template (Rev. 0)] Document Number: Gdoc Date Submitted:
Doc.: IEEE Jan06-RR-TAG_Liaison_Report.ppt Submission January 2006 Peter Murray, MotorolaSlide 1 RR-TAG Liaison Report IEEE
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Submission March 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the January 2011 interim meeting Work.
RR-TAG Opening Report Report of the March 2009 plenary meeting
IEEE Liaison Report to IEEE
Project: IEEE Wireless Personal Area Networks (WPANs)
Liaison Report from Date: September 20, 2012 September 2012
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
WAC SG November 2016 Opening Report
<month year> doc.: IEEE < e> <March 2019>
January, 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [January 1394-Wireless Working Group Liaison.
March 2010 doc.: IEEE /0194r0 March 2010
November 2018 Opening Report
March 2019 Liaison Report Date: Authors: March 2019
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
TG 1 November Session Opening Report
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
March 2011 RR-TAG Opening Report
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
802.11af Liaison Report Date: Authors: January 2013
<month year> doc.: IEEE < e> <March 2019>
RR-TAG Liaison Report Jan07 IEEE
<month year> doc.: IEEE < e> <July 2019>
Summary of the IEEE 802 Coexistence Process Discussion
<month year> doc.: IEEE < e> <March 2019>
<month year> doc.: IEEE < e> <July 2019>
Presentation transcript:

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: March, 2013 Authors:

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 2 Overview This document reports on the regulatory matters considered and outputs from the November, 2012 and January, 2013 meetings. Specific documents/actions were approved by the RR-TAG in response to the regulatory proceedings reviewed and inputs from various WGs. The RR-TAG is input driven. The attendance varies depending on the topics & documents being considered. E.g. one session in Atlanta had 25 people from different WGs helping draft an output. As was begun at the September meetings final approval of documents will be done on Thursdays during AM1 and AM2.

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 3 FCC Items Considered in November The RR-TAG approved and then submitted to the EC for their approval two inputs to the US FCC in November –18-12/117r1, Draft request to FCC for a Public Notice requesting comments to Progency M-LMS testing. This was a letter to update the FCC on activities of this project. The letter is available in final form on the FCC web site. –18-12/114r2, Draft comments to FCC Wireless Microphone Refresh Proceeding. These comments are available in final form on the FCC web site. The RR-TAG began work on documents r1, comments in response to the FCC regarding the TV Band Auction NPRM. After considerable discussion in it became apparent that an agreement could not be reached at that time and it was decided to convene conference calls to progress the response. –Conference callas were held on December 3 rd and December 6 th. –At that time it was possible to complete the comments which were then approved by and subsequently by a 10 day EC ballot and filed with the FCC. These commends are available in their final form on the FCC web site.

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 4 ITU-R Items Considered in November The RR-TAG approved and submitted for EC approval two contributions to the ITU-R. –18-12/116r0, Report to External Organizations on P Progress. Note: While this document was not addressed to the ITU-R it was considered at the same time that the other IEEE contribution for ITU-R was. It was not totally clear at that time if this letter would be sent to the ITU-R WP5D or not, and it was not. –18-12/118r1, Draft LS to WP 5D: Comments on Working Doc toward a PDNR on the use of IMT for broadband PPDR. –Both contributions were submitted and presented by the chair at the Janaury, 2013 meeting of WP5D in Geneva. –The only WGs involved with these liaisons was IEEE

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 5 FCC Items Considered in Janaury The RR-TAG approved and then submitted to the EC for their approval two inputs to the US FCC in November –18-12/117r1, Draft request to FCC for a Public Notice requesting comments to Progency M-LMS testing. This was a letter to update the FCC on activities of this project. The letter is available in final form on the FCC web site. –18-12/114r2, Draft comments to FCC Wireless Microphone Refresh Proceeding. These comments are available in final form on the FCC web site. The RR-TAG began work on documents r1, comments in response to the FCC regarding the TV Band Auction NPRM. After considerable discussion in it became apparent that an agreement could not be reached at that time and it was decided to convene conference calls to progress the response. –Conference callas were held on December 3 rd and December 6 th. –At that time it was possible to complete the comments which were then approved by and subsequently by a 10 day EC ballot and filed with the FCC. These commends are available in their final form on the FCC web site.

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 6 FCC Items Considered in Janaury The RR-TAG approved and then submitted to the EC for their approval or review three items for the US FCC in January –18-12/117r1, Draft request to FCC for a Public Notice requesting comments to Progency M-LMS testing. This was a letter to update the FCC on activities of this project. The letter is available in final form on the FCC web site. –18-12/114r2, Draft comments to FCC Wireless Microphone Refresh Proceeding. These comments are available in final form on the FCC web site. –18-13/03r1 Report to External Organizations (the FCC, IETF, the Broadband Forum, and other relevant organizations) on P Progress The RR-TAG began work on documents r1, comments in response to the FCC regarding the TV Band Auction NPRM. After considerable discussion in it became apparent that an agreement could not be reached at that time and it was decided to convene conference calls to progress the response. –Conference callas were held on December 3 rd and December 6 th, at which time it was possible to complete the comments which were then approved by and subsequently by a 10 day EC ballot and filed with the FCC.

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 7 ITU-R Items Considered in January The RR-TAG approved and submitted for EC 5 day review one contributions from IEEE to the ITU-R. This documents had been previously approved by the EC at the November, 2012 Plenary and simple improvements made since then.. –18-12/118r3 LS to WP 5D: Comments on Working Doc toward a PDNR on the use of IMT for broadband PPDR. –This document was presented by the IEEE-SA Liaison to the January/February meeting of ITU-R WP5D which deals with IMT and IMT-Advanced. Much of the material contained in it was included in the ongoing PPDR work in WP5D.

doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 8 RR-TAG Items for March: Further responses to ITU-R on Question ITU-R 236/1 for WP1A’s meeting in June, –Contributions must be received by May 28th –It is recommended that the IEEE 802 contributions be completed by end of the March, 2013 Plenary. Consideration of any other contributions to the revision of Recommendation ITU-R M.1450 Further contributions to ITU-R, FCC, especially as regards white spaces and licensed use by Progeny and others of the 902 – 928 MHz frequency band and to other regulatory bodies as needed. The RR-TAG agenda can be found on the RR-TAG’s Mentor web site as Document Don’t forget that for the most part you can maintain your voting rights in your home group when you participate in the RR-TAG (and, of course, log your attendance correctly!).