New Service Delivery Presented by Milton Russell.

Slides:



Advertisements
Similar presentations
1 1 First Quartile Consulting Insights Conference August 21, 2013 Presented By: Jim Lorenz Director - Electric Transmission and Distribution Construction.
Advertisements

BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Converting Overhead to Underground
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
1 HON Introduction Honeywell Confidential Today’s Economic Realities Civic leaders face many issues… Improving productivity Improving safety & security.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Joint ICT Infrastructure Outline Business Case Joint Partnership Board July 2010.
Crestmoor Neighborhood Reconstruction Project Community Meeting January 26, 2012.
Ed Gray, PE Public Service Electric and Gas
1 What is Operations NU 4 Distribution Companies $1,311M Cap 32,000 Interruptions 67,000 Trouble Calls 40,000 miles of infrastructure 2 +
INDUSTRIAL & SYSTEMS ENGINEERING
Fully Implemented GIS/WMS/Outage System May 2004.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.
Competitive Retailer Relations CR Workshop AEP Overall.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
©2006 CenterPoint Energy Proprietary May Version 1 1 Distribution Project Management Project Overview SWEDE Conference San Antonio, Texas May 11,2007.
© 2007 PPL Electric Utilities Energy Outlook: 2008 and Beyond Small Business Development Center Lehigh University November 7, 2007 Tom Stathos PPL Electric.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
1 Plug-in Electric Vehicle Readiness For CMUA 11/8/2010.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Introduction to Construction General Permit Inspections.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Regulatory Streamlining Implementing the Task Force Recommendations March 26, 2013 Regulatory Streamlining Implementing the Task Force Recommendations.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
Blackstone Valley Prioritization Project Blackstone River-Users Conference September 18, 2012.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
Project Management DHSS To set up and run a New Technology Unit for the South East Region, to support Local Office Managers during the pilot trials for.
The DCF Leadership Plan Brief Overview. 2 Website Continuous Learning… Tracking…Reports Managing for Excellence Introducing ………… Supervising for Excellence.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Distribution Project/Program Management Don Stanton, PMP SWEDE Conference May 10, 2007.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Craig J. Nichols, Secretary Purchasing Directors’ Meeting October 17, 2013.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Smart and Advanced Metering in the UK – an overview
Gulay Litchfield For CQI-TECH PLC
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Solar Energy Technologies Program Solar America Communities: Transforming the U.S. Solar Energy Market through Local Action April 4, 2011 Patty Kappaz.
Council Bill , Ordinance 2528 El Paso Electric Franchise Agreement.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Data Center Stabilization
Fort Stanwix National Monument Energy Audit Contract
Working group update: Improving and Expediting the process for new electric and gas interconnections November 29, 2016.
City-wide LED Street Light Conversion Program
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Street Lighting and Electric System Undergrounding
Presentation transcript:

New Service Delivery Presented by Milton Russell

Scope Team Members Training Methodology Project Start Date May 25, 2005 New Service Delivery

New Service Delivery Scope Beginning: Customer (builder, developer, home and commercial owner, contractor, etc … ) contacts CPS Energy for new service (electric and/or gas service). Ending: Customer receives CPS Energy services through gas/electric meter.

New Service Delivery Scope (cont.) Included in Scope: Distribution system electric and/or gas only Residential subdivisions Overhead (OH) and Underground Residential Distribution (URD) Residential single family/multi-family dwellings, Commercial developments OH and Underground (UG) Mobile home lots Streetlights installed as part of residential subdivisions. Not included in Scope: Customers with existing services from CPS Energy Civic and System improvement projects Overhead to underground conversions Transmission projects Downtown network projects Maintenance and Repair of existing infrastructure

Team Members Julius Moore – Team Leader –Years: 10 –Area: Transmission Planning/Underground Engineering Duane Dugie –Years: 29 –Area: Customer Coordination/ EDS East Mark Barth –Years: 34 –Area: Large Commercial Planning Hubert Friesenhahn –Years: 24 –Area: Underground Cable Splicer/EDS East Floyd Haman: –Years: 23 –Area: Underground Electric Distribution (UED)/EDS West Charlie Martinez –Years: 28 –Area: Overhead Construction/EDS West

Team Members (cont) Jeanine LaRocque –Years: 23 –Area: Administration/EDS East Karrie Satcher –Years: 5 –Area: Purchasing/Contract Services Steve Blain –Years: 10 –Area: Subdivision Planning Curt Alexander –Years: 13 –Area: Gas Marketing Milton Russell –Years: 14 –Area: Underground/EDS East

Team Members (cont) John Harnsberry –Years: 1 –Background: HR and Training –Note: recruited from outside of CPS Energy Glenn Frerich –Years: 28 –Area: Underground Energy Distribution –Note: Glenn replaced Floyd Haman in March 2007 TOTAL YEARS OF EXPERIENCE ON THE TEAM: 243 Years

The NSDR Team received the following Training 1.Work Style Inventory 2.Myers-Briggs Type Indicator (MBTI) 3.Accelerated Process Improvement 4.Guiding Team Performance 5.Influencing Without Authority 6.Business Process Reengineering 7.The New Leadership 8.Change Management 9.Process Design & Implementation 10.Essential Facilitation 11.Fish Training 12.Give’em the Pickle 13.The Leadership Pickles 14.The Fred Factor 15.11th Annual Lean Management Conference

NSD Redesign Approach

Key Activities Timeline Current State Assessment – November 2005 Conceptual Solution Design – December 2005 Business Case approved - March 2006 Design NSD Facility – July 2006 Detailed Solution Development – December 2006 –Web Portal –Job Status Display Screen –Front Lot Construction standard change –Developer responsible for all utility coordination –Employee Selection for Pilot –WMIS Task Structure Changes NSD Pilot Training - November 2006 to January 2007 NSD Pilot – March 2007 to September 2007 Implementation – October 2007 and beyond

NSD Pilot Details

Front Lot Construction Advantages Cost Savings utilizing front lot Reduce time frame of construction Shorter service length Easier access for Transformer Simplified and Streamlined platting process Reduces the amount of service re-routes

Front Lot Construction (cont) Advantages Use fewer, but larger Capacity transformers (Not Physical Size) –Reduces conflict with other construction –Improves Aesthetics –Transformer Study Eliminates the need for future alleyway repairs that occur with rear lot construction Supports tree preservation ordinance –Fewer trees destroyed or disturbed –Transformer Shared across two property Lines

Front Lot Construction (cont) Advantages Reduced outage time to customer –Crews do not disturb customer during outages –Customer can see crews working Less cost for future encroachment –Removes encumbrance of customer’s backyards Transformer shared across two property lines where applicable

Developer Installed Infrastructure The Process –The Developer’s contractor that installs sewer and water can also trench and install the infrastructure conduit for electric and gas*. –The Developer’s engineer is now the Joint trench coordinator for all utilities. (AT&T, Time Warner, Grande Communication, Guadalupe Valley) * If on CPS Energy’s approved contractor list.

Developer Installed Infrastructure (cont) Advantages to Developer Decreased time between the installation of wet and dry utilities. Developer controls their timeline up to the point of pulling cable and setting transformers.

Developer Installed Infrastructure (cont) Advantages to CPS Energy Now we are focusing on CPS Energy’s core business; energy delivery No longer acts as the project manager for the Developer. That responsibility is now with the Developer’s engineer. No longer responsible for coordinating pre-construction meetings.

All-in-One Meter Main Advantages to the Developer and/or CPS Energy Safety –Eliminates temporary meter pole –Eliminates conduit and cable running across yards and streets –No exposed service entrance conductors –Reduced customer complaints on Temporary Meter Loop removal (TML) Reduced Timeline –One trip at the beginning of project –Should cut construction time for developers due to availability of power –Eliminate coordination to install and remove temporary meter loop

All-in-One Meter Main (cont) Advantages to the Developer and/or CPS Energy Cost Savings –Expedites service installation –Reduces Builder’s cost –Less permits –Cost of permanent vs. temporary to final equipment cost –Reduce number of turn downs due to poor construction –Initiating 1 work order vs. the potential of 4 –1 piece Module Meter

Additional Initiatives Elimination of supplying all self-contained single phase meter cans Correcting and Standardizing CAM units to reflect the appropriate material (prerequisite to VMI) Empowering our construction crews to participate in decision making regarding the reduction of trips to the jobsite Right-sizing transformers Integrated Supply/Vendor Managed Inventory

Questions?