THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.

Slides:



Advertisements
Similar presentations
1 Interstate Pipeline Gas Quality Primer Business Practices Subcommittee June 15-16, 2004 PIPELINE SEGMENT Wholesale Gas Quadrant North American Energy.
Advertisements

Inert Gas Purification Systems
Installing & Testing Regulators
Inert Gas Purification Systems Why do we need them??? Many of the materials used in research and development today are extremely air sensitive, and can.
Anesthesia Machine Presented by Gil Soto C.R.N.A.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Anesthesia Apparatus Checkout Recommendations
Passive Leak Detection Operation Training October 2014.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Clean Air Boxes CABs RAMs CO Monitors. Features at a Glance Grade D Compliance Grade D Compliance Auto Calibration Auto Calibration Warning Systems Warning.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Battery Watering Technologies
Treatment Plant Ozone Retrofit Program California Unified Program 8 th Annual Training Conference February 8, 2006 Presented by: Paul G. Beswick Metropolitan.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
NOvA Near Water and Dryer System Design and Status
Air Monitoring Presented By: Etech Environmental & Safety Solutions, Inc.
Efficient Pigging of Gathering Lines
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
A Seminar on VALIDATION OF COMPRESSED AIR
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Left side compressor behind Left control box Right side compressor behind Right control box.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Automotive Air Conditioning and Repair 7-1 Goals of P2 in Automotive Air Conditioning Service Work n Pollution Prevention Goals –Minimize refrigerant vented.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Model 2537A Training Course Detailed Instrument Description Rev: Nov
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
15-16 June THEMIS Propellant Offload Concept M. Sholl (UCB) M. McCoullough (SAI) P. Turin (UCB) June 2005 MIWG/GOWG(TIM) Space Sciences Laboratory.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Ships Service Air System
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Luke or MTS Q anode. MOBY DICK  Purpose of Moby Dick:  Can we even get to ~10 ppb O 2 and H 2 O?  What other things in Moby will cause loss of LAr.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
1 MICE Hydrogen system Working group mtg – 01/09/14.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
IT-4189 Supply and installation of a cryogenic distribution system
protoDUNE – single-phase Instrumentation - Gas Analyzers
THEMIS MISSION PRE-SHIP REVIEW
THEMIS Mission Assurance
PHI Status Report SO Cleanliness Working Group #24
GLAST Large Area Telescope:
Status of Hydrogen System Development
Instrument PDR Summary of Objectives
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
Homework #7, Due June 3rd Find a THEMIS interval of interest to your research. Read the thm_sst_cleanup.pro and crib_sst_contamination.pro routines. Plot.
Presentation transcript:

THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE

THEMIS TIMPURGE- 2 UCB, JUNE 16, 2005 Purge Design Requirements The purge system was designed to comply with the following standards: NASA-STD-5005Ground Support Equipment Design Criteria EWR 127Eastern and Western Range Safety Policies and Practices PAIPTHEMIS Performance Assurance Implementation Plan (UCB Document) THM-SYS-011THEMIS Configuration Management Plan (UCB Document) THM-SYS-004THEMIS Contamination Control Document (UCB Document) SAI-PLAN- 0647THEMIS Mission System Program Safety Plan (Swales Document)

THEMIS TIMPURGE- 3 UCB, JUNE 16, 2005 THEMIS Purge Overview ESA & SST Instruments Require Nitrogen Purge Nitrogen Purge Required Two of the instruments on the THEMIS probes require high purity (99.999%) nitrogen purging – the SST (Solid State Telescope) and ESA (Electrostatic Analyzer) instruments. The ESA microchannel plates are sensitive to condensable hydrocarbons, particulates, and water vapor. The SST detectors are sensitive mainly to particulates. Low Pressure / Very Low Flow (5 psi / 68sccm (.0024 cfm) per Probe) UCB SSL will supply all hardware Oxygen Sensor, 2-stage Regulator, Gages (Blow-Out-Back Type), Relief Valve (10 psi), Shutoff Valve, Filter/Moisture Separator, Flow meter, Hose Assemblies with Quick Disconnects, Manifolds etc. UCB SSL Responsible for Purge With some assistance in monitoring gas supply and providing gas at non-UCB facilities. Purge up until PCA Integration When impractical to purge, 24 hr off-purge limit. Lumaloy bonnets on instruments when covers are off (up until PCA integration)/ Bag PCA and Backfill With Nitrogen Reference THM-SYS-032 PURGE PLAN REV B for more detail

THEMIS TIMPURGE- 4 UCB, JUNE 16, 2005 Probe Purge

THEMIS TIMPURGE- 5 UCB, JUNE 16, 2005 Purge Hardware

THEMIS TIMPURGE- 6 UCB, JUNE 16, 2005 Purge Outline

THEMIS TIMPURGE- 7 UCB, JUNE 16, 2005 Purge Outline cont.

THEMIS TIMPURGE- 8 UCB, JUNE 16, 2005 PCA Bagging 1.Final Instrument Purge Just Prior to PCA integration 2.Bag PCA After Integration 3.Purge Bag For 24 Hours 4.Remove Purge Line. 5.Transport to Pad 6.Remove Bag Just Prior to Installing Shroud