NorthGrid status Alessandra Forti Gridpp12 Brunel, 1 February 2005.

Slides:



Advertisements
Similar presentations
London Tier2 Status O.van der Aa. Slide 2 LT 2 21/03/2007 London Tier2 Status Current Resource Status 7 GOC Sites using sge, pbs, pbspro –UCL: Central,
Advertisements

Northgrid Status Alessandra Forti Gridpp20 Dublin 12 March 2008.
NorthGrid status Alessandra Forti Gridpp15 RAL, 11 th January 2006.
Northgrid Status Alessandra Forti Gridpp22 UCL 2 April 2009.
LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Northgrid Status Alessandra Forti Gridpp24 RHUL 15 April 2010.
Information Technology Disaster Recovery Awareness Program.
Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
An Introduction to System Administration Chapter 1.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Northgrid Status Alessandra Forti Gridpp25 Ambleside 25 August 2010.
NorthGrid status Alessandra Forti Gridpp13 Durham, 4 July 2005.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
London Tier 2 Status Report GridPP 13, Durham, 4 th July 2005 Owen Maroney, David Colling.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Castor F2F Meeting Barbara Martelli Castor Database CNAF.
London Tier 2 Status Report GridPP 12, Brunel, 1 st February 2005 Owen Maroney.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
Southgrid Technical Meeting Pete Gronbech: 16 th March 2006 Birmingham.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
Group Computing Strategy Introduction and BaBar Roger Barlow June 28 th 2005.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
VOMS Alessandra Forti HEP Sysman meeting April 2005.
Northgrid Alessandra Forti M. Doidge, S. Jones, A. McNab, E. Korolkova Gridpp26 Brighton 30 April 2011.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Monitoring the Grid at local, national, and Global levels Pete Gronbech GridPP Project Manager ACAT - Brunel Sept 2011.
Andrew McNabNorthGrid, GridPP8, 23 Sept 2003Slide 1 NorthGrid Status Andrew McNab High Energy Physics University of Manchester.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Steve Traylen PPD Rutherford Lab Grid Operations PPD Christmas Lectures Steve Traylen RAL Tier1 Grid Deployment
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
London Tier 2 Status Report GridPP 11, Liverpool, 15 September 2004 Ben Waugh on behalf of Owen Maroney.
Report on Installed Resource Capacity Flavia Donno CERN/IT-GS WLCG GDB, CERN 10 December 2008.
Southgrid Technical Meeting Pete Gronbech: May 2005 Birmingham.
HEPiX FNAL ‘02 25 th Oct 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 25 th October 2002 HEPiX 2002, FNAL.
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
Brunel University, School of Engineering and Design, Uxbridge, UB8 3PH, UK Henry Nebrensky (not a systems manager) SIRE Group.
Production Manager’s Report PMB Jeremy Coles 13 rd September 2004.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
HEPiX 2 nd Nov 2000 Alan Silverman Proposal to form a Large Cluster SIG Alan Silverman 2 nd Nov 2000 HEPiX – Jefferson Lab.
LCG and Tier-1 Facilities Status ● LCG interoperability. ● Tier-1 facilities.. ● Observations. (Not guaranteed to be wry, witty or nonobvious.) Joseph.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Chapter 6 Discovering the Scope of the Incident Spring Incident Response & Computer Forensics.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
1Maria Dimou- cern-it-gd LCG November 2007 GDB October 2007 VOM(R)S Workshop report Grid Deployment Board.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
LHCb Grid MeetingLiverpool, UK GRID Activities Glenn Patrick Not particularly knowledgeable-just based on attending 3 meetings.  UK-HEP.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
VOMS chapter 1&1/2 Alessandra Forti Sergey Dolgodobrov HEP Sysman meeting 5 December 2005.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
CERN LCG1 to LCG2 Transition Markus Schulz LCG Workshop March 2004.
The CMS Beijing Tier 2: Status and Application Xiaomei Zhang CMS IHEP Group Meeting December 28, 2007.
London Tier-2 Quarter Owen Maroney
Server Upgrade HA/DR Integration
Database Services at CERN Status Update
SRM2 Migration Strategy
Quality Control in the dCache team.
Pete Gronbech, Kashif Mohammad and Vipul Davda
Kashif Mohammad VIPUL DAVDA
Presentation transcript:

NorthGrid status Alessandra Forti Gridpp12 Brunel, 1 February 2005

1 February 2005Alessandra Forti Gridpp12 NorthGrid status Sites Summary Posts Communication Security –Cooling systems –University security procedures Storage Misc Conclusions

1 February 2005Alessandra Forti Gridpp12 Lancaster Old cluster: 52 cpu, 31 kSI2k LCG-2_3_0 Still RedHat 7.3 New cluster: waited for next week –409 kSI2k, 80 TB Location: HEP department Security: university firewall Installation: kickstart+manual

1 February 2005Alessandra Forti Gridpp12 Liverpool 120 nodes, LCG-2_2_0 until mid-december Complained that nobody was using it –Questioned the effort of putting more nodes if not needed Cooling system breakdown –Hasnt recovered yet Location: HEP department Security: University firewall + machine firewall Installation: kickstart+manual

1 February 2005Alessandra Forti Gridpp12 Manchester Old cluster: 45kSI LCG version 2_3_0 RedHat 7.3 –Upgrade to SL next 2 weeks New cluster: tender sent out this week Location: now HEP department –future universtiy Computing centre Security: University firewall (basically opened) Installation: kickstart+manual

1 February 2005Alessandra Forti Gridpp12 Sheffield New Cluster: 160 cpus –240 kSI2k, 4 TB of storage LCG-2_3_0 SL3.0.3 Location: university computing center Security: university firewall Installation: kickstart+manual

1 February 2005Alessandra Forti Gridpp12 Communication Technical board meetings happen now once a month Sys admin are more responsive to the s but not to mailing lists. Dont have much time to follow what is happening –Posts are not yet in place to help

1 February 2005Alessandra Forti Gridpp12 Posts 4.5 FTE to fill between sites –Lancaster: still looking –Liverpool: still looking for –Manchester: interviewing –Sheffield: filled No common strategy between universities on this. Perhaps needed? –Posts should work together

1 February 2005Alessandra Forti Gridpp12 Resources security problems: cooling system Clusters partly at HEP departments partly in universities computing facilities Doesnt seem to affect the outcome of cooling systems failures –Liverpool and Sheffield both suffered a serious one –Manchester had to upgrade just to add few machines. There is no protection against this kind of failures. They happen.

1 February 2005Alessandra Forti Gridpp12 Resources security problems: setup and procedures Sites dont know their universities security policies and procedures –Theyll find out They know about university firewalls because they have to ask to open ports –Lately also to keep them close: would be useful a better LCG port table Some dont have a central logging system Some dont have active monitoring Coordination/cooperation needed?

1 February 2005Alessandra Forti Gridpp12 Storage management problems Storage hardware at sites various –Few hundreds GB 80 TB Sites dont know LCG storage requirements for Tier2s: volatile or permanent. –Prefer volatile (=no backup requirements) Only classic SE. –They are difficult to manage –Default configuration doesnt help –Quotas ignored by Information system –CERN says modifying classic SE code is not worth the effort. New DPM/SRM out soon

1 February 2005Alessandra Forti Gridpp12 Misc There are no local monitoring tools –Coordination/cooperation needed? GIIS, GOC, ganglia still used to check own system RGMA working only in Manchester and not all the time –Difficult to understand where is the problem Apel and accounting need more publicity –Especially if old logs backup is necessary