Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.

Slides:



Advertisements
Similar presentations
Cesg-1 04 November 2009 CCSDS Engineering Steering Group: Report to the CCSDS Management Council ESTEC, Noordwijk, NL 04 November 2009.
Advertisements

SDLS impact on TM, AOS, TC Space Data Link Protocols Greg Kazz NASA/JPL Oct 16/17, 2012.
November SLS RFM and RNG REPORT 18 November 2004.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Next Generation Space Link Protocol – Raison d’etre Greg Kazz Ed Greenberg SLS-SLP WG Fall 2013 CCSDS Meeting - San Antonio, TX, USA.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Cesg-1 4 November 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Proposal for a TC-2 Protocol Ed Greenberg Greg Kazz Oct /27/20151.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SLS AREA REPORT November SLS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
10-Dec-2012-cesg-1 Presentation to ESTEC Nordwijk, Netherlands 8 April 2014 CCSDS Space Link Services (SLS) Area Area Director: Gian Paolo Calzolari (ESA/ESOC)
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Spring 2015 Meeting CalTech (Pasadena, CA, USA) SPACE LINK SERVICES (SLS) AREA Gippo /
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
SPACE LINK SERVICES (SLS) AREA
SPACE LINK SERVICES (SLS) AREA
Joint Meeting of the CCSDS and the OMG-SDTF
SPACE INTERNETWORKING SERVICES (SIS) AREA
SLS AREA REPORT November 2004 November 2004.
Next Generation Space Link Protocol – Raison d’etre
SLS AREA REPORT Goal: Next Generation Uplink WG
Atlanta, Georgia, USA, 16 September 2005
Presentation transcript:

cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only

cesg-2 SLS REPORT 7 May 2010 A.CURRENTLY ACTIVE WGs, BOFs & SIGs WITHIN AREA 1. RFM WGRadio Frequency & Modulation 2. [RNG WG Ranging] to be closed 3. C&S WGCoding & Synchronisation 4. SLP WGSpace Link Protocols 5. NGU WGNext Generation Uplink 6. MHDC WG Multi/Hyperspectral Data Compression 7. SDLS WG Space Data Link Security (Joint with SEA) 8. OCM SIGOptical Coding and Modulation 9. PlaCom SIG Planetary Communications

cesg-3 SLS REPORT 7 May 2010 A.STATISTICS

cesg-4 SLS REPORT 7 May /14/ SLS-SLP WG Goal: 1) Should we move the following Pink Sheets that passed agency review forward that were temporarily suspended: TM Space Data Link Protocol (‘OID’ Frame and VCP Service)-CV 2003 AOS Space Data Link Protocol (‘OID’ Frame and VCP Service)- CV 2006 TC Space Data Link (CRC unification) – CV ) Review of Comments on Proximity-1 Data Link Layer Blue book 3) Disposition RIDs against TC Retransmission parameter pink Sheets submitted by ESA 4) Review the plan to update the SLP Green Books due to TC Retransmission parameter pink sheets 5) Discuss decoupling the transfer frame from the coding layer for future CCSDS agency missions. 6) Discuss with Marc Blanchet – SANA Registries for Space Link Identifiers and plan of action WG Status: Active X Idle ____ WG Summary Situation: status:OKCAUTIONPROBLEM comment:Good progress 1. RFM WG 2. RNG WG 3. C&S WG 4. SLP WG 5. NGU WG 6. MHDC WG 7. SDLS WG 8. OCM SIG 9. PlaCom SIG

cesg-5 SLS REPORT 7 May /14/2015 SLS-SLP WG Summary progress: TM and AOS Space Data Link Protocol BBs containing VCP and ‘OID’ frame changes require another agency review. Discrepancies are being resolved by Matt Cosby before these books are sent for review. Note: Concern that SDLS WG may change TM Space Data Link Protocol for Security header. Partial review of Prox-1 Space Data Link Layer Protocol accomplished during meeting. Remainder of document will be reviewed via Telecons. WG agrees to advance all 3 pink sheets concerning TC retransmission repeat parameter to Blue (See Resolution #1). New project spawned to update appropriate SLP GBs. Marc Blanchet has provided SLP with a mechanism for inputting current and future Space Link Identifiers into SANA registries. New Project will be formed to create policies for these parameters.

cesg-6 SLS REPORT 7 May /14/2015 SLS-SLP WG (cnt’d) Planning : Create a new project in SLP (SANA-Space Link Identifiers) to work with Marc Blanchet to define the policies associated with the existing Space Link Identifiers and some potential new parameters (e.g., PN sequences) Create a new project in SLP to update the applicable SLP GBs to match TC retransmission repeat parameter Space Data Link Protocols – CCSDS G-1 (2007)

cesg-7 SLS REPORT 7 May /14/2015 SLS-SLP WG (cnt’d) Resolutions : 1.Retire the Telemetry Green Book, Telemetry Summary of Concept and Rationale CCSDS G-1 (1987). 2.Request the MC issue a new Blue Book version of the following Pink Sheets concerning the new TC Frame retransmission repeat parameter: TC Sync and Channel Coding, CCSDS P-1.1 TC Space Data Link Protocol, CCSDS P-1.2 COP-1, CCSDS P1.1 Note: Ensure that the Secretariat includes the previously approved pink sheets for the CRC unification to the TC Space Data link Protocol before the book is republished.

cesg-8 SLS REPORT 7 May Next Generation Uplink WG Goal: Discuss the rationale and futher work associated with the Emergency Uplink Application Profile Identify any needs for advanced coding in the TC standard Discuss Agency approaches towards Multiple Spacecraft per Aperture (MSPA) Uplink WG Status: Active X Idle ____ WG Summary Situation: Good progress. status:OKCAUTIONPROBLEM comment:Good progress 1. RFM WG 2. RNG WG 3. C&S WG 4. SLP WG 5. NGU WG 6. MHDC WG 7. SDLS WG 8. OCM SIG 9. PlaCom SIG

cesg-9 SLS REPORT 7 May /14/20159 NGU WG Summary Progress NASA and CNES identified needs to add the CC(7,1/2) to Telecommand Standard. These agencies will coordinate one white paper on this topic to be given at the Fall 2010 CCSDS meeting. POC are Greg Kazz/Gilles Moury Motivation for Emergency Comm Deep Space Application Profile are: Lower EIRP available on 70m network Need to upload more data to deep space assets Going futher away to outer planets Direct for Earth commanding of small landers on Mars No need to develop Emergency Comm Application Profile for Near Earth

cesg-10 SLS REPORT 7 May /14/ Next Generation Uplink WG (cnt’d) Problems and Issues: None

cesg-11 SLS REPORT 7 May /14/ Next Generation Uplink WG (cnt’d) Planning : Requested C&S WG to create new project to add CC(7,1/2) to TC. Examine: BCH + CC(7,1/2) case and CC(7,1/2) standalone case Develop specific reference mission scenarios containing target metrics for EIRP, G/T, Eb/No, FER etc for the Emergency Uplink Deep Space application Profile Combine the NASA and ESA reports on MSPA-uplink into one report such that both short term and long term objectives are clearly identified. Identify any needs for future standardization and cross-support. NGU to reply back to RF&MOD WG on which set of 1.5 dB data rate steps are to be used in RF&MOD telecommand bit rates including the tolerance specification.

cesg-12 SLS REPORT 7 May /14/ Next Generation Uplink WG (cnt’d) Resolutions : None at this time.