High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.

Slides:



Advertisements
Similar presentations
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
Advertisements

TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Mission Statement Trans-Elect, with the support of AES, is committed to expanding America’s electric transmission grid in the furtherance of public policy,
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
American Solar Transformation Initiative Program Overview Tyler Espinoza, Senior Project Manager, Optony Inc. Ben Foster, Senior.
SOUTHERN AFRICAN POWER POOL 1 BRIEF ON SAPP POWER PROJECTS by Eng. Musara Beta Chief Market Analyst SAPP Coordination Centre Zimbabwe Mining Indaba, Harare,
Public Service Company of New Mexico
CERAWEEK ® 2007 Technology Needs for a Carbon-Constrained World Jeff Sterba Chairman, President, CEO PNM Resources, Inc. February 15, 2007.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Israel Electric Corporation Business Development Yakov (Yasha) Hain Senior Executive Vice President 1.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Transmission’s Critically Important Role in Connecticut’s Energy Future David H. Boguslawski Vice President - Transmission Northeast Utilities Service.
North American Power Group Western Mine-Mouth Coal-Fired Power Two Elk.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Regulatory Priorities of the Colorado Public Utilities Commission Black Hills Corporation Analysts’ Meeting Remarks of Ron Binz, Chairman Colorado Public.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Eastern Wind Integration and Transmission Study
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
Montana Ambassadors Helena, Montana February 25, 2011.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
January 2010 Southwest Renewable Energy Transmission Conference: Renewable/Transmission Developer Panel Moderator: Dian M. Grueneich, Commissioner California.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
1 FERC st Quarter Stakeholder Meeting for Transmission Planning Denver, CO March 6, :30 a.m. – 11:30 a.m.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Climate strategies for public officials: Tri-State’s Greenhouse Gas Management Roadmap Lee Boughey Southwest Renewable Energy Conference September 16,
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
Overview of Reliability Technology Issues and Needs Assessment Vikram Budhraja Electric Power Group January 27-29, 2004 Washington, D.C. Transmission Reliability.
PacifiCorp & CAISO Regional Transmission Organization Presented by Scott Gutting President, Energy Strategies, LLC Independent Energy Producers Annual.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Chelsea Loomis, Regional Electric Transmission Planning.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
PJM©2013 Cyber Threats to the Electric Power Grid Steven McElwee October 16, Copyright © 2013 by PJM Interconnection, LLC.
LS Power LS Power is a power generation and transmission group
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
EI-WECC Seams Study Needed
HYDROELECTRIC CORPORATION
SPSG Meeting August 17, 2016 Salt Lake City, UT
SunZia Project Description
Presentation transcript:

High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission Assessment Phoenix, Arizona May 22-23, 2008

11,000 MW 6,500 MW 24,900 MW6,700 MW HPX 3,500 – 4,000 MW (see note below) WYOMINGCOLORADONEW MEXICOARIZONA NOTE: HPX would be additive to the transmission lines that currently link the HPX states 6,500 MW IN-STATE GENERATION AND TRANSMISSION SYSTEM, SHOWING 2005 GENERATION CAPACITY (FROM DOE) HPX Concept A roadmap for regional transmission expansion with benefits for each HPX state

SOLAR WIND WCI (TE/WIA/WAPA) EPTP (Tri-State/Xcel/WAPA) NM Wind Collector (PNM) SunZia High Plains Express Initiative Roadmap for Regional Transmission Expansion Possible Component Projects –SunZia –NM Wind Collector –Eastern Plains (EPTP) –Wyoming-Colorado (WCI) Description –3,500 MW Capacity –Two 500 kV Lines (AC) –~$5 Billion –2017 Base Case Feasibility Studies –Stage I Complete –Stage II Started Participants –6 Utilities Xcel, Tri-State, WAPA, ColoSp, PNM & SRP –3 State Organizations CO, NM & WY –Trans-Elect SOLAR

HPX Initiative Status Initial feasibility report being finalized Primary benefits –Reliability –Renewables: wind and solar –Benefits for HPX States & Consumers –Roadmap for regional transmission expansion Moving to next stage of feasibility assessment –Outreach to each HPX state & stakeholders –Four Studies Committees Technical Commercial Routing/Siting Communications

Questions? Jerry Vaninetti VP Western Development Denver, Colorado (303)