Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, 2011 - Bastrop, Tx (Second Responder Cable Treatment Program)

Slides:



Advertisements
Similar presentations
Use of Rubber Gloves & Protectors for Underground Cable Splicing
Advertisements

2 November 2005 Fall ICC1 In Service Performance Of EPR Cables Installed In The MLGW Electrical Distribution System Insulated Conductor Committee Educational.
APS Underground Distribution Cable Replacement Project
Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009.
April 27, 2012 Presented by: Andy Justice SWEDE Southwest Electric Distribution Exchange “The Evolution of Distribution Switchgear”
 E4 Electrical Installation #1 Power Distribution.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September , 2011 | Hyatt.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Electrical Power & Machines “Electrical Engineering Dept” Prepared By: Dr. Sahar Abd El Moneim Moussa 1.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Electrical Power Systems
Circuit Protection Electrical circuits require protection to prevent fire or electrocution in the event of a fault. There are two main types of circuit.
DET 310 UNDERGROUND CABLES
URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.
 Covers two main areas:  - Electricity  - Electronics  All appliances and electrical devices depend on electrical circuits.
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
Transmission Lines …….. Conductor Material
Ernst Schutte African Cables 30 July CBI-electric: african cables  An empowered company  Powerhouse Utilities (Pty) Ltd  25,1% shareholding 
©2006 CenterPoint Energy Proprietary May Version 1 1 Distribution Project Management Project Overview SWEDE Conference San Antonio, Texas May 11,2007.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
APPLIED ELECTRICITY SS3
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday,
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
MNM Fatal Electrical Accident Electrical Accident August 6, 2008 (New Mexico) August 6, 2008 (New Mexico) Potash Operation Potash Operation Shift.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Electrical Materials.
UNDERGROUND CABLE.
Distribution Systems-General
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Safety Around Irrigation Systems
FOR OVER 100 YEARS…LIFE. POWERED BY EDISON. Southern California Edison Presentation to City of Palos Verdes Estates December 13, 2011 Marvin Jackmon, Regional.
ECE 498HZ: Power Distribution System Analysis
ELECTRICAL INSTRUMENTS ( service and utilization )
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Isolate isolated (A) Physically separated, electrically and mechanically, fromall sources of electrical energy. Such separationmay not eliminate the effects.
High Temperature Superconducting (HTS) Cable Project
Sub Station.
Utility Needs and Smart Grid for Major Storm Events
RESIDENTIAL ELECTRICAL SERVICE
License Examination Practice Drill
Intelligent grid expansion – RheinEnergie AG, Germany
Power Generation and Distribution
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Engineering Project Cable Management.
The High Voltage Underground Cable Technician Inspector Training
What is Electricity?.
Safety Meeting Topics Standby Generator Safety
Unit 1 Vocabulary (set #1)
ST800 Service Tester, 800 Amps.
Isolation Link Operation
Presentation transcript:

Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)

1 27,000 Square Miles of Territory 3.2 Million Electric Service Points 3,000 Circuits Miles of Underground Primary  17,218 Cable Miles – URD  4,641 Cable Miles – Feeder  21,859 Total Miles. (Networks not included) Miles of Overhead Primary  10,608 Mainline Primary  13,026 3ø Non-Mainline  5,006 2ø Lines  27,212 Single Phase Lines  55,852 Total Miles Oncor System Overview 630 miles 390 miles 1 LM- Maintenance Planning

2 Cable Components Tinned Copper Concentric Neutral Insulation Shield XLPE or HMWPE Insulation Conventional Conductor Shield Aluminum Conductor LM- Maintenance Planning Aluminum Conductor (Strand-filled) Jacket Bare Copper Concentric Neutral Insulation Shield TRXLPE Insulation Super Smooth Conductor Shield Pre-1990Since 1990

3 Previous specification cable Current specification cable Primary Underground Cable (Network Excluded)

4 Primary Cable Faults LM- Maintenance Planning

5 Cable Rehabilitation Program - Background  System wide maintenance plan (Second Responder) for extending the life of aging infrastructure  Pre-1993 PE cable issues  8,000 cable miles – Pre-1993 PE cable –7,000 cable miles – URD –1,000 cable miles – Feeder  Cable Manufacture –General Cable, Hendrix, Pirelli (Now Prysmian), Southwire  Capital Rehabilitation method for aged cable –235 cable miles rehabilitated (By Utilx)  Cost effective alternative to replacement of cable  Additional 600 cable miles rehabilitated in other programs LM- Maintenance Planning

6 Second Responder Process When a cable faults, the troubleman (first responder) determines if the cable is loop fed and if the faulted cable can be switched out. Padmount Transformer Pole Riser Normal Open Point Fault Isolated Faulted Cable LM- Maintenance Planning

7 Second Responder Process (cont’d)  If the cable can be switched and service restored to the customers, the location of the faulted cable is sent to Oncor Program Services.  Program Services will then schedule a Utilx cable repair/rehabilitation crew to the cable.  The crew will attempt to repair and inject the cable with rehabilitation fluid. LM- Maintenance Planning

8 2nd Responder Process  4,291 sections of failed cables came through the process since 2008 –65% were able to be injected successfully.  235 cable miles have been rehabilitated using 2nd responder process since LM- Maintenance Planning

9 Business Comparison  Cable Repair - Splicing $ X –O&M Cost –Same old cable  Rehabilitation of Span $ 4X –Capitalized Cost –Added 20+ years of life  New Cable (Bore) $ 15X –Capitalized Cost –New 40+ year asset LM- Maintenance Planning

10 Business Considerations that Prevent Rehabilitation  Cable installed in conduit (except preventative)  Corroded concentric neutral of 25% or less remaining  The faulted cable section must not have been de- energized more than six months.  There cannot be more that one joint per 100 feet of cable. (Business Case)  Other Technical Reasons –Butyl rubber cable –Cable with tape conductor shield –Loss of insulation shield conductivity –Insulation shield with no adhesion LM- Maintenance Planning

11 Questions Oncor Contacts Lee Maurer Senior Manager Maintenance Planning Mark Darilek Project Manager Maintenance Planning Richie Harp Consulting Engineer Distribution Standards Fort Worth, TX Mike Sulak Program Manager Operations/Program Services