2010 Construction Contract Standards Training Part 2 2010 Standard Specifications November 2011.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

B. Progress Schedule Schedule Costs –2002 C&MS … the cost of preparing and updating the schedule is incidental to all contract items. –2005 C&MS.
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
OneOffice is the basis of recording and documenting all pay quantities. Pay quantities may be entered directly into OneOffice or transferred from other.
NMDOT 2013 Specifications- Section 100 Presented by: Rod Billingsley Billingsley Engineering, P.C. Las Vegas, NM.
Hwy Ops Div1 FHWA REPORT TEA/TUG CONFERENCE DAYTONA BEACH, FL NOVEMER 2-4, 2005 OFFICE OF PROGRAM ADMINISTRATION HIPA-10.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
PESO Meeting | June 11, TAC 213 Electronic and Information Resources Rule Review Jeff Kline Statewide Accessibility Coordinator Lon Berquist Technology.
2010 Construction Contract Standards October 2011.
Hwy Ops Div1 FHWA REPORT TEA/TUG CONFERENCE MOBILE, AL OCTOBER 9-11, 2004 OFFICE OF PROGRAM ADMINISTRATION HIPA-10.
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Change Orders. Build the project that was bid and awarded.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
2015 Traffic Signals 101 Topic 12 Special Provisions.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
2010 Construction Contract Standards Training Part 2 TOOLS November 2011.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Presentation to External Stakeholders: Improvements to the Domestic Request for Proposal and Contract Template Contracting Management Division November.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
Public Procurement Procedure – Bidding Documents
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Mock State Aid Project County Highway Accountant’s Conference 2015.
CONSTRUCTION CONTRACTS DOCUEMENTS
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
Eta EMPLOYMENT AND TRAINING ADMINISTRATION UNITED STATES DEPARTMENT OF LABOR eta EMPLOYMENT AND TRAINING ADMINISTRATION UNITED STATES DEPARTMENT OF LABOR.
Maintenance Specifications For Jan and beyond.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
2010 Construction Contract Standards Training Part 2 TOOLS October 2012.
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
Measurement and Payment
2010 Construction Contract Standards Training Part 2 BUSINESS PRACTICES FOR PREPARING 2010 CONSTRUCTION CONTRACTS October 2012.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Chapter 8 Specifications & Special Provisions
County Highway Accountant’s Conference 2015
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
State Aid Construction
Designers’ Manual Overview and Chapter Contents
Request for Proposal & Proposal
Caltrans 2010 standard specifications
Call Off Process following an Aggregated Procurement (AP)
State Aid Construction
Directed Change Constructive Change
Presentation transcript:

2010 Construction Contract Standards Training Part Standard Specifications November 2011

2010 Standard Specifications Divided into 11 Divisions and 99 Sections Some sections are moved and renamed, reserved, and added Division XI, Building Construction is added

outline Standard Specification changes 2006 Boilerplate SSP’s that need to be manually inserted SSP’s that have moved Supplemental work items

Standard Spec Highlights Division I Section Style Variations – brief listing of plain language change and terms1-1.02

Standard Spec Highlights Section Abbreviations, includes a Bid Item List Abbreviations table. Section Work description - instructs the contractor to construct the work described in the Notice to Bidders and the contract. So prepare a good work description.

2010 Standard Specifications changes Section Changes and Extra Work. (was Section D Extra Work in the amendments and 2006). “Extra work” is now called “change order work”. See the “Wording Changes” in your tools binder on how to state it. Section Differing Site Conditions. (was Section of the amendments)

Standard Spec changes We moved but we’re still bid items Section Schedule. (was Section Progress Schedule in the amendments) There are 3 Levels of CPM Schedule in Section Time Related Overhead. (was SSP or )

2010 Standard Specifications changes Payment is now in Section 9. You need to be familiar and know this section as you QA or write a spec. Section D Mobilization. (was Section D in the amendments and Section 11 of the 2006 Std Specs.)

2010 Standard Specifications (Continued) Division I General Provisions Division II General Construction to Division X Materials. Division XI Building Construction. There is only one section in this division. Provisions are all going to be SSPs that will be added in this section.

Moved to the city Areas for Use (was SSP S5-240 Areas for Contractor’s Use) p B Seal Coat Claims (was SSP S Damage Claims) p B 13-4 Job Site Management (was SSP Construction Site Management) p

Ex boilerplate SSP’s Mandatory Pre-bid Meeting (was S2-100) Early return /early start (S3-092) D A Partnering (Dispute Resolution) (was S5-155) A A cost for Cost + Time (renter) A

New address SSP B Supplemental Project Information. (was SSP S5-280) SSP B SSP C Railroad Relations. (was Section 13 Railroad Relations) Old Section 4 SSP C Delayed start SSP F Flex start (Smart start) SSP F

New address SSP C partial pay (was S5-250) SSP C New tool – Bid Item ListBid Item List

Moved to a new neighborhood but please don’t forget us Need Supplemental Work Items Section C Value Analysis Workshop. (was section in the amendments). Section Partnering. (was Section in the amendments) Section E(2) Dispute Resolution Advisor for contracts worth $3M to $10M. Section E(3) Dispute Resolution Board for contract worth over $10M.

Moved to a new neighborhood but please don’t forget us Need Supplemental Work Items Section Payment Adjustments for Price Index Fluctuations. (also rented) SW item (066670)

Moved to a new neighborhood but please don’t forget us Need State Furnished M’tls & Expenses item SSP Department-Furnished Materials. (was S8-M10 State Furnished Materials) SSP

Moving out of town Section D Training. (was Section D in the amendments) The number of trainees or apprentices for the federal training program moved to the Notice to Bidders.

2010 Standard Plans Incorporated 2006 NSPs and RSPs Revised texts to all uppercase, except abbreviations, symbols and notes Relocated “Specs” from Std Plans to Std Specifications

2010 Standard Plans Deleted 2006 Std Plan T7, Const Project Funding ID Sign, in the 2010 Std Plans. SSP refers to HQ Traffic Ops. Web site for details. Did not include proprietary crash cushions and MBGR terminal system end treatments

2010 Standard Plans Updated technical contents: Revised standard MBGR height from 27- 3/4" to 29" per FHWA memo Redesigned crib walls, retaining walls and box culverts based on Load and Resistance Factor Design (LRFD) There’s a digest of changes on the web site under the Std Plans link.digest of changes

2010 Standard Plans List Process works the same Edit the same as for previous editions Place the edited Std Plans list at the beginning of the SP_TEMPLATE (template)

2010 Standard Specifications (Continued) Any questions?

Eligible Partial Pay Items