BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35% completed – Frame Design uploaded to PATRAN – Material.

Slides:



Advertisements
Similar presentations
SAE Baja Senior Design Project
Advertisements

Landing Gear Strut Estimated time required: 15 min
Test practice Multiplication. Multiplication 9x2.
Design of a Baja SAE Vehicle
ODU Formula SAE MAE 435 Final Report 4/23/13. Introduction Charles Pearson The 2013 Michigan FSAE Competition Competition Scoring: Static Events o Design.
PACE Collaborative Project: Emerging Market Vehicle Transmission Design Team member: Anthony Smith Kevin Scott Decorian Harris Jacque Thornton Advisor:
February 25 th Overall views and concepts ◦ Adam Stagnaro (Machining) ◦ Stephen Steger (FEA) ◦ Karina Pikhart (Solidworks) ◦ Sarah Cooper-Davis.
Single Product Model for Transmission Design & Analysis
MECH1200 Multiple gears The Speed of any driven gear is determined by calculating the gear ratio using the driven gear as the output gear along with the.
MITCalc Mechanical, Industrial and Technical Calculations Training materials.
Drive Train Ryan Barba Patrick Hickey Andrew Hill.
SYSTEMS DEVELOPMENT LIFE CYCLE (SDLC). GROUP MEMBERS HALİDE ÖZBAŞLI HALİDE ÖZBAŞLI İ. TUĞÇE BOZ İ. TUĞÇE BOZ MURAT IRKKAN MURAT IRKKAN.
Mary Lou Maher University DECO2005, Semester 2, 2005 Project Management.
2.72 Group 5 Design Review 1 2/23/08 Eric Correll, Josh Gafford, Andrew Marecki, Stephen Powelson, Johannes Schneider, Sam Weiss.
ME345: Modeling and Simulation Professor Frank Fisher Stevens Institute of Technology Last updated: June 25, 2009 Software versions used in the tutorial:
Phase Difference = Phase Difference = 0.05.
ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
BAJA STATUS UPDATE September 27, 2011 FRAME & SUSPENSION Research Phase 100% completed Design Phase 75% completed – Frame Design (CAD) – Suspension Design.
CAD & Rapid Prototyping by 3- Dimensional Printing (3DP TM ) Rapid Toolers: Jordan Medeiros Stephanie Silberstein Hannah Yun.
TEAM MEMBERS: Chad Chandler Joe Cofer Nathan Eramian Francis Hauris Jeff Wong.
NASA moon buggy project
Collaboration and Project Management Working in Teams.
Recreation and Wellness Intranet Project
SAE Mini Baja GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS
SAE Mini Baja GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS
GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS JAMES CHAPMAN JOSEPH FANNING Baja SAE ® Series 2015 Status Update.
1000A 60Hz Gearbox Grade 3 Incoming Inspection Serial Number: TGW Job Number:A Inspection Date:5/4/11 1.
1000A 60Hz Gearbox Grade 3 Incoming Inspection Serial Number: (BR) TGW Job Number: Inspection Date: 1/14/13 1.
EW ONCEPT ROJECTS PROCESS DESIGN TOOLS NCP has traditionally used Bond Models to size Ball mills. We still utilize a modified version of Bond Theory for.
AS Making EdExcel. Page 1 Design Briefs – 1 for each project you have done this year. Example Design Brief (put the title of the product here) I am going.
TextMonTuesWedThursFriSatSun Text example GANTT CHARTS Example text Text.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
SMOS L2 Ocean Salinity Level 2 Ocean Salinity Planning the year ahead 21 April 2015 ARGANS & SMOS L2OS ESL 1.
Old dominion university formula sae
Soup-2-Nuts Alaska Department of Fish & Game Commercial Fisheries October, 2011.
Advanced Design Applications Power and Energy © 2014 International Technology and Engineering Educators Association STEM  Center for Teaching and Learning™
2.2 The Addition and Multiplication Properties of Equality Math, Statistics & Physics 1.
Most shafts are supported at 2 bearings
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
Abdelmageed Elmustafa
Project Update. GAIL Status Update  Connection with Student, HR, & Registration systems  RuffaloCody interface complete  Document imaging.
Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.
SAE Baja Senior Design Project
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
02 | Data Flow – Extract Data Richard Currey | Senior Technical Trainer–New Horizons United George Squillace | Senior Technical Trainer–New Horizons Great.
Percentage without a calculator 10% 10%, 20 %, 30% …. 90% 25%, 50% or 75% 33 ⅓ % and 66 ⅔ % 5% 15%, 25%, 35% etc Mixture.
Status Report #1 Autonomous GPS Vehicle Brendon Balouch Vernal Garcia Brian Gonzalez Kim Pham January 29, 2006 Purpose: To implement a fastest route algorithm.
U.S. Coast Guard Servicing Personnel Office (SPO) Alignment Group Charter – Phase I Update & Phase II Status.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Structural Integrity UNDERSTAND STRUCTURAL STRENGTH OF LOAD BEARING COMPONENTS IN MECHANICAL SYSTEM.
. Provide notes/outlines/graphic organizers to the student ahead of time.. Provide aids: calculator, multiplication table, spelling.
Project Advisors: Advisor Name: Dr. Muhammad Asad
Tech/ME 140: Unit 5 Lecture Mechanism Design: Introduction to Mechanisms, Synthesis Using Graphical Approach. Motion Analysis and Simulation: Animation.
SAE Baja Senior Design Project
SAE Baja Senior Design Project
GANTT CHART Text Text Example
GANTT CHARTS Example Example Example Example text Tasks Example 1
CAD Trainings LEGOOO!!!!.
SAE Baja Senior Design Project
ريكاوري (بازگشت به حالت اوليه)
SAE Baja Senior Design Project
LUKE BLOCKER & BRANDT LAMONTE ADVISOR: HO-HOON LEE
التدريب الرياضى إعداد الدكتور طارق صلاح.
GANTT CHARTS Example Text Text Here Text Here Text Here Text Here
SAE Baja Senior Design Project
Knee Loading Device Status Update 2
Children’s Hospital Update
Unit 3 Review (Calculator)
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Seamless mechanical tubing
Presentation transcript:

BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35% completed – Frame Design uploaded to PATRAN – Material Properties selected – Tubing Dimensions selected – Boundary Conditions established Upcoming Tasks – PATRAN FEA under multiple load cases

BAJA STATUS UPDATE November 9, 2011 GEARBOX Calculation Phase completed – Gears – Shafts – Bearings Design Phase 60% completed – Gear train design completed Upcoming Tasks – Packaging design in SolidWorks – SolidWorks FEA

GANTT CHART – 11/9/2011