Scheduling CTC-415. Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete.

Slides:



Advertisements
Similar presentations
Scheduling CTC-470.
Advertisements

Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
Having Fun with Gantt PERT &.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Chapter 10: Project Schedule Planning
Eleanor Roosevelt High School
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Importance of Project Schedules
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
ELC 347 DAY 7. Agenda Questions Assignment 3 Due Assignment #4 posted  Due next week Group Progress report due next week Exam 2 next week  Same format.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Workshop-3 Gantt and Pert Chart.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Chapter 6 Introduction to Microsoft Project
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
1 Selected Topics on Project Management The Critical Path Dr Marc Conrad 1Marc Conrad.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Chapter 8 Scheduling.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
KNOWLEDGE & INTERPRETATION – graphic st aidans high.
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Scheduling Class 7.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. Characteristics.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Using Graphs to Show Information
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Project and Project Formulation and Management
Chapter 16 – Project Management
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
& Urban Planning Civil Engineering Department
Project Management and scheduling
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Project Activity and Risk Planning
Tools for project scheduling.
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Data Visualization Data visualization principles. Tell a story
PROJECT TIME MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
Project Management: A Managerial Approach
Project Scheduling: Lagging, Crashing and Activity Networks
THE HIERARCHY OF SCHEDULES
Project Management © 2004 D. J. Foreman.
Project Planning By Phaik San Liew.
Project Management © 2004 D. J. Foreman.
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Management © 2008 D. J. Foreman.
Scheduling.
Presentation transcript:

Scheduling CTC-415

Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project

Types of Schedules Depend on Viewer –Simple bar chart (Gantt chart) Tells owner progress –Activity on Node (AON) –Activity on Arrow (AOA) Used by PM, supers, foremen

Developing Activity Sequence Physical Relationship An activity cannot start until a previous one is complete Safety Relationship Performing activities which cause a safety hazard to other activities Resource Relationship The amount of resources available at any time Preferential Relationship Contractors preference on activity order

Constructing Bar Chart How should bar chart be laid out –Time on horizontal axis –Activity on vertical axis –Time of activity start based on position –Duration of activity based on length of line Day = start of day to start of day

Constructing Bar Chart What time unit should be used –Work days –Hours –Weeks –Bar chart size may dictate time units

Constructing Bar Chart Additional Info –Activity Value –Activity Cost –Activity Resource requirements

Constructing Bar Chart Work days or Calendar days –Work days harder to follow No weekends or holidays –Calendar days allow you to see concrete curing

Gantt Chart Looks like a horizontal bar chart Good for linear work Good for providing an overview of the project Not good for complex projects

Gantt Chart