Material Selection Central Office Hydraulics

Slides:



Advertisements
Similar presentations
Lecture 8: Design of Erodible Channels
Advertisements

Chapter 3: Steady uniform flow in open channels
Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Find the perimeter. Areas Grade 7 - CIC 15-Feb-14 Area of a Rectangle X = X = X = BAh B B h h B h B = base h = height Must learn formula.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Topic 1Topic Q 1Q 6Q 11Q 16Q 21 Q 2Q 7Q 12Q 17Q 22 Q 3Q 8Q 13Q 18Q 23 Q 4Q 9Q 14Q 19Q 24 Q 5Q 10Q 15Q 20Q 25 Final Jeopardy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Measurements and Their Uncertainty 3.1
Arithmetic and Geometric Means
Signing Plan Design - At Grade Intersections TEM Chapter 6-4
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Warning Signs.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Guide Signing.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
PIPE CONSTRUCTION Ohio Department of Transportation
ODOT Structure Project Manager Training
Year 6 mental test 10 second questions
ZMQS ZMQS
Classification of Building Construction Types
By: Walter C. Brown and Daniel P. Dorfmueller
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Concrete Construction Part 3
Fire Protection Systems
Review for 2nd Nine Weeks Exam
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
Filling and Wrapping Review Sheet
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Chapter 5 Test Review Sections 5-1 through 5-4.
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Precision and Accuracy
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
PSSA Preparation.
How Cells Obtain Energy from Food
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
ENCE 455 Design of Steel Structures
PIPE CULVERT By CH. VENKATARAMAIAH.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Subsurface drainage – Investigations
Basic Hydraulics: Culverts – I
INDOT Culvert Sizing Policy
Understanding our Competition - Part B Metal Pipe
Baffles – Structures - Spans
Presentation transcript:

Material Selection Central Office Hydraulics Culvert Design Material Selection Central Office Hydraulics

Steps for Material Selection Field Review Culvert Hydraulics Structural Strength Service Life Material Analysis Plan Alternates

Field Review Determine pH of the water Use an instrument that is capable of accuracy of 0.1 Use Figures 1002-2 through 1002-3 only if no flow is present when performing the field check

Do not use unless there is no flow when performing the site visit.

Field Review Determine if there is a presence of abrasive material. Abrasive Material – Presence of gravel, stones, or a course sand in the barrel of an existing conduit (or in the existing stream bed) that has a stream gradient or flow sufficient to cause movement of the abrasive material. Assume abrasive conditions if there is any question about the bed material.

Abrasive Condition

Non-Abrasive Condition

Field Review Investigate the condition of existing structures. If a replacement structure, look at the existing structure. If a new structure look at any adjacent existing structures.

Culvert Hydraulics Use approved methods outlined in the Location and Design, Volume 2 Manual

Structural Strength Structural strength for Metal Conduits (steel and aluminum) Select the gauge thickness and corrugation profile that is adequate (based upon fill height). Figures 1008-1 through 1008-9 (steel) Figures 1008-15 through 1008-21 (aluminum) (NOT Aluminized)

Structural Strength Structural Strength for Concrete Conduits Select the D-load that is adequate for structural strength (based upon fill height). Figures 1008-10 through 1008-14

Service Life Service life is either 50 or 75 years Use 50 years as a minimum . Use 75 years for high fills (>16’), under freeways, or where future costs may be high to replace the structure.

Service Life Durability for Metal Conduits Use the obtained pH and abrasiveness observation to determine the gauge thickness. Use figures 1002-5(50) through 1002-6(75) & the general notes for the figures.

Service Life Durability for Concrete Conduits Check for adequate service life based upon the pH, pipe slope, and pipe rise. Use figure 1002-4.

Material Analysis For metal conduit, choose the higher gauge thickness from the structural design, or the durability analysis. When durability thickness is higher than structural thickness, provide the 1-inch corrugation profile for pipe diameters over 48 inches.

Plan Alternates Place all available material options in the plan (all metal alternatives and concrete). In some cases, only one material may be specified in the plan: If the outlet velocity in a concrete pipe requires a ring chamber and the velocity of the metal alternative is below 20fps, then metal may be used exclusively. When encountering excessive cover for a concrete pipe.

Plan Alternates Where a larger corrugated metal pipe would require a higher pavement grade to satisfy minimum cover requirements, concrete may be used exclusively. Where a metal pipe arch is required hydraulically and a round concrete pipe would work, concrete may be used exclusively. Do not need to specify minimum D-loads or minimum gauge thicknesses in the item call-out.

Plan Alternates Show the following in the plan: D-load or gauge thickness if it is above the minimum shown in the specifications. The conduit shown in the plans should be the longest length pipe (the smallest diameter). Hydraulic Design Information Other information (see L&D, Vol. 3, Section 1312.2)

Example Problem Given: Hydraulic design requires 96 inch corrugated or 90 inch smooth lined Outlet velocities: Corrugated: V=17.0 fps & Smooth lined: V=21.0 fps Height of cover = 18 feet Under a new alignment (minor state route) pH was measured and found to be 7.5

Design Example Photo from creek: Is this Abrasive?

Example Problem Select the appropriate design alternatives. As per L&D, we will exclude concrete conduit in the design due to the velocity of 21 fps. Durability Design Site was determined to be abrasive in nature A design service life of 75 years will be used due to the high fill height. Use Figure 1002-6(75) for the durability design

Example Problem Options from figure & notes are: 10 gauge 707.02 Aluminum Coated 12 gauge 707.07 Aluminized & Asphalt Coated & Paved 14 gauge 707.04 Polymer Coated with 1” corrugations 16 gauge 707.04 Polymer Coated & Asphalt Coated & Paved 16 gauge 707.02 with Concrete Field Paving 1 gauge 707.03 12 gauge 707.03 with Concrete Field Paving 707.22 (aluminum pipe) with Concrete Field Paving 707.23 (aluminum structural plate) with Concrete Field Paving

Example Problem Structural Design of Metal Conduit Use Figure 1008-1 & 1008-3 to check for maximum height of cover:

Example Problem A gauge thickness of 0.064 (16 gauge) will be satisfactory up to a fill height of 31 feet for all steel options except for 707.03 (structural plate). A gauge thickness of 0.109 (12 gauge) will be satisfactory up to a fill height of 29 feet for steel structural plate. A thickness of 0.105 (the minimum for this size) will be satisfactory up to a fill height of 20 feet for aluminum pipe. A thickness of 0.100 (the minimum for this size) will be satisfactory up to a fill height of 20 feet for aluminum structural plate.

Example Problem Specifying in the Plan Specify the alternative as per L&D, Volume 3, Section 1312.3. For this example it would be as follows: 603 – 180 L.F. 96” Conduit, Type A 707.02 (0.138) Aluminized, 707.02 with CFP, 707.03 (0.280), 707.03 with CFP, 707.04 (1”) (0.079) Polymer Coated, 707.04 (1”) Polymer Coated Asphalt Coated and Paved, 707.07 (0.109) Aluminized Asphalt Coated and Paved, 707.22 with CFP, 707.23 with CFP

Questions ?