East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
PRESS C7000/C7000P/C6000 Color Density Control Color Balance
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
 An Operation or action step  another process step or series of process flow steps that are formally defined elsewhere.
Documentation Letts Study Guide Information Systems - IT Chapter 19.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
©2004 Texas Trade and Industrial Education1 Computer Maintenance 1 Unit Subtitle: Printers.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Installing SAS 9.3 Raymond R. Balise Health Research and Policy.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Installing SAS 9.3 Raymond R. Balise Health Research and Policy.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Key Applications Module Lesson 12 — Word Essentials
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
PowerPoint 2007 © : The Power of Presentations How can Microsoft PowerPoint 2007 help you finalize a presentation for an audience?
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Digital Logic and State Machine Design Installing Xilinx WebPACK 12.4 CS 2204 Digital Hardware.
Downloading and Installing PAF Insight PAF Insight can be easily downloaded Or can be installed from a CD A license is needed t0 activate the program.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
The Control Panel is the starting point when you wish to load files into Blackboard. Students cannot see this panel, unless they know your password of.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Chapter 9 Prototyping. Objectives  Describe the basic terminology of prototyping  Describe the role and techniques of prototyping  Enable you to produce.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Exercises Graph the following functions. Solutions will follow the exercises.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
WS50(Stratacache) Software updating guide (By Using USB)
Computing Fundamentals Module Lesson 7 — The Windows Operating System Computer Literacy BASICS.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Login Screen Step 1: Please Enter your individual Login Id and Password Step 2: Click on Submit Button.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
Key Applications Module Lesson 12 — Word Essentials Computer Literacy BASICS.
Intelligent Integration
Introduction to Powerschool Gradebook and tienet
© 2006 Cisco Systems, Inc. All rights reserved.
How to Submit a External Tool Assignment
IPBPM test results at the LINAC end
Shift instructions August 16, 2017 Antoni Aduszkiewicz
of secondary light ion beams
of secondary light ion beams
Maintain a single control room for all accelerator programs
Activating your account and navigating through TIDE
McCrometer Nano Board Test Procedure
Test Information Distribution Engine (TIDE) Training
Key Applications Module Lesson 12 — Word Essentials
Activating Your Account and Navigating Through TIDE
PS East Area operation…
2003 test beam with 25 ns bunched muons
Status of energy deposition studies IR7
Climate Surveys.
Manual Water Ski Directory
Download from Zotero Home Page
How to control the local beam density
How magnet opening affects PVDIS acceptance
Key Applications Module Lesson 12 — Word Essentials
The East Area beam-lines
Presentation transcript:

East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015

L.Gatignon, East Area Secondary Beam Controls User Guide 2 From where The East Area secondary beam lines are controlled from the EBCR. This room is located on the first floor, above the T10 control room, downstream of the T11 area. You can access this room easily from the big gate (Porte 18) on the Bldg 251/252 side. Many beam elements can be controlled from the user control rooms.

L.Gatignon, East Area Secondary Beam Controls User Guide 3 Tools for Beam Control There is a PC for magnet control (both beam and spectrometer magnets) and detector readout A series of racks allows to control collimators, vacuum, access signals from the barracks and get timing signals

L.Gatignon, East Area Secondary Beam Controls User Guide 4 COLLIMATORS For users: For experts: VACUUM CONTROLDRIFT CHAMBERS

L.Gatignon, East Area Secondary Beam Controls User Guide 5 TIMING AND OTHER SIGNALS Communication with user barracks Communication with APRON (primary beam electronics and RP barrack) Timing distribution Two more racks provide timing signals and connections with the user barracks

L.Gatignon, East Area Secondary Beam Controls User Guide 6 Magnet and detector control Magnets and detectors are controlled from the CESAR beam control program. The use of Cesar is described in the Control Summary Sheets (quick User Guide: entations/docs/Controls- Summary-Sheet.pdf also available as plastified sheets in the EBCR. entations/docs/Controls- Summary-Sheet.pdf Folder with reference settings and general info Beam control PC (user: eaop passwd: ) Magnets and detectors are controlled and read from the Linux PC in the EBCR or from the beam computers in the user control rooms

L.Gatignon, East Area Secondary Beam Controls User Guide 7 Magnets: Which current? Lists of currents for each energy are available in the green folder. Whenever you change energy, all currents must be modified using the knobs. Normally the sign of the current corresponds to the sign of the beam particles (except possibly for ZT9.QFO03 – ask your liaison physicist) Please check carefully that you are changing the right rectifier in the right beam! ( In each knob the name of the magnet contains the name of its beam line, e.g. ZT9.BHZ1) Do not use the currents in the old printed User manuals. They are obsolete. Please consult the liaison physicist if you have special beam requirements, e.g. different focusing of the beam.

L.Gatignon, East Area Secondary Beam Controls User Guide 8 Collimator control Find the crate controlling the collimators in your beam line If you want to open to (-x, +y) mm, dial 50+x/2 and 50+y/2 with the thumbwheels Push on the red STROBE buttons The final position in mm is shown on the LCD screens. Push STROBE again if the setting reached is not precise enough. The horizontal collimators usually define  p/p with typically  p/p=±1% for ±5 mm gap (see User manual). The vertical collimators control the angular acceptance and hence the beam flux and the divergence at your detector. Check in the green folder xy Thumbwheels LCD screens

L.Gatignon, East Area Secondary Beam Controls User Guide 9 Vacuum control The vacuum control is regularly checked by experts from the AT/VAC group. However, the user can check the vacuum in his beam line in case of problems. Typical values are in the few mbar ballpark

L.Gatignon, East Area Secondary Beam Controls User Guide 10 TIMING SIGNALS The detailed documentation is available in the paper document inside the module The North branch (T9, T10, T11) uses EASTA cycles, the T7 line and IRRAD the EASTC cycles. DIRAC uses EASTB. Paper documentation Select the wanted cycles Delay (in msec) from start of PS cycle Signal during full PS cycles selected Pulse at start of extraction (  delay)

L.Gatignon, East Area Secondary Beam Controls User Guide 11 Communication with barracks There are several cable connections between the user barracks and the EBCR. The name of the barrack is written on the blue panels above each patch panel. Please check the labels for the correspondence between the barrack and EBCR connectors

L.Gatignon, East Area Secondary Beam Controls User Guide 12 Information from the PS machine Activate EA Vistar from the General menu in the Java Console Manager: The green dots indicate the Intensity per spill for the different Target telescopes The white curve shows The shape of the spill over Its 400 msec length

L.Gatignon, East Area Secondary Beam Controls User Guide 13 The Vistar on the TV screen shows the overall state of the PS (+ cycles): Magnet current Inst. Intensity Active cycle Cycle intensity Comments from the operators

L.Gatignon, East Area Secondary Beam Controls User Guide 14 Further Information There is a web page: The access system operation is described in Call the CCC (76677) for operational problems (24 hrs/day, 7 days/week) Call your liaison physicist (L.Gatignon, ) for other questions and requests (during working hours )