Rev 6.1.  Lack of collaboration is a major risk  Late engagement is a risk  How much is new?  How much time?  How many resources?  Design Collaboration.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Aerospace Advanced Product Quality Planning (Aerospace APQP) Introduction October
“The Honeywell Web-based Corrective Action Solution”
Initial Capacity Assessment Sheet (ICAS) &
Smart Connect – Supplier Portal Training Module 3 – Creation of Advance Shipment Notification.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
1 Confidential PCR Process Change Request Mike Rizuto Supplier Development Technologist March 16, 2015 Rev 3.
Control Your Business Processes ProStar Software, Inc.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Commissions.
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
LAMS Legal Action Management System Seminar 1 SKIP TO 1.Overview of LAMS 2.The Index_Active.xls11.Small Claims Court PLAINTIFF’S CLAIM:12.Plaintiff No.112.Plaintiff.
First Article Inspection Report
How to Document A Business Management System
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Request Material Information Use Case Item as created in Optiva. Supplier information request(s) can happen at any time. The same process works for Optiva.
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
Basics of Good Documentation Document Control Systems
Integrate your people maximize your knowledge Tel SalesBase Customer.
4 Unit Title Blocks and Notes. 4 Unit Title Blocks and Notes.
Office of Project Management Metrics Report Presentation
Supplier Program Review Meeting #1
MSDSonline HQ: Viewer Site Tour Main Menu Getting to your Company List Searching within your Company List How to View and Print an MSDS How to Print a.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
Student Resource Package Leave Replacement. Presentation Content  Navigation Accessing the Leave Home Page Leave Home Page Panels The Replacements Panel.
1 ADVANCED MICROSOFT POWERPOINT Lesson 10 –Using Advanced Presentation Features Microsoft Office 2003: Advanced.
Contract Training Class I
DRP World Class Operations - Impact Workshop Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products.
V Slide 1V 1.0Slide 1 Class Details School Administrator School JAN 1 Class Subject Maintain Class Details  Basic Information  Class-Based Subject.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Oracle Services Procurement
State of Georgia Release Management Training
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
LOAN RADAR Media Center, LLC. Keep your team on the same page Update your in-process loans with loan status.
Supplier Performance Development Process
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
2012 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Eaton Supplier APQP Process Overview
Travel Reimbursement -step by step- When is Travel Reimbursement (TR) required? All travel that requires reimbursement or travel advance issued on TA.
Requirements of Documents for Quality Management System ISO 9001 Certification.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Company Confidential Americas Aerospace Quality Standards Committee (AAQSC) Private Web Based on SAE Standard Works September 28, 2015 The.
Production Part Approval Process (PPAP)
Customer Return Management Scenario Overview
Food Safety Program Based on HACCP Principles by Ramadan Badran
Process Training - Supplier
Travel Reimbursement -step by step-
Attachments from Templates in PD2
Customer Online Ordering
Appearance Approval Report (AAR)
Free Trade Agreements - Supplier Training
Supplier Performance Development Process
Product Development Scenario Overview
To the ETS – Encumbrance Online Training Course
RISK REDUCTION PROCESS
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Smart Connect – Supplier Portal Training
Smart Connect – Supplier Portal Training
Supplier Performance Development Process
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Company X Process Mapping Training
Managing Performance Priorities
APQP Jan ("Yon") Roovers President JAN ROOVERS ASSOCIATES, INC.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Rev 6.1

 Lack of collaboration is a major risk  Late engagement is a risk  How much is new?  How much time?  How many resources?  Design Collaboration  Process Collaboration Rev 6.1

Structured collaboration involving Engineering, Manufacturing, Material Control, Purchasing, Quality, Sales and Management from both Polaris and the Supplier INPUT! Rev 6.1

Advanced Product Quality Planning is a structured method of defining and establishing the steps necessary to assure that a product satisfies the customer Sometimes Referred to as Moving the Mountain Rev 6.1

The AIAG Advanced Product Quality Planning (APQP) and Control Plan Reference Manual [available at aiag.org] provides the general guidelines for ensuring that APQP is implemented in accordance with the requirements of the customer. The APQP spreadsheet used by Polaris includes the corresponding page number referencing each of the APQP steps for quick orientation. Rev 6.1

The APQP/PDP Spreadsheet acts as both a workbook and project tracker Relevant product information is entered Cross functional teams are established Individual tasks are selected and assigned Time lines are managed by date, responsibility, and percent of completion Documentation relative to the project is stored Overall APQP/PDP performance/progress is reported Here is where progress is recorded and stored Rev 6.1

Risk is determined by several factors: Time to resource New product New supplier Design risks Safety critical Technically complex Supplier assessment score Supplier performance (history) The Polaris Risk Assessment considers the factors and selects whether the APQP/PDP workbook will be level 1, 2 or 3 Each level will have a minimum number of APQP steps assigned required to be completed by both Polaris and the Supplier There are 63 possible steps to select on the APQP/PDP spreadsheet. These steps are selected by all or part of both cross functional teams. Based on project risk, Polaris has 3 levels of APQP/PDP with minimum required steps preselected. Rev 6.1

Level 1 – Low Risk 21 Mandatory APQP Steps Selected Level 2 – Medium Risk 28 Mandatory APQP Steps Selected Level 3 – High Risk 39 Mandatory APQP Steps Selected These are minimum APQP requirements as determined by Polaris, other value added APQP steps may be selected by the Supplier/Polaris cross functional teams When saving APQP/PDP workbooks please use the naming convention of: project name_supplier_part number Rev 6.1

There are 5 PDP Gates/Milestones total Rev 6.1

The tabs at the bottom of the workbook are hyperlinked to the steps on the APQP sheet Information on APQP and sometimes sample forms are located on these tabs The tabs should also be used to convey information related to the selected step Rev 6.1

The tabs at the bottom of the workbook are hyperlinked to the steps on the APQP sheet Information on APQP and sometimes sample forms are located on these tabs The tabs should also be used to convey information related to the selected step Marked up drawings for 2.2 DFM&A, completed 2.13 MFC, completed Packaging Approval Form are a few examples of items which should be attached to the workbook Larger items such as PFMEAs and Control Plans we ask that upon completion the first page of the document be placed on the corresponding tab and the full copy sent to the SQE for review Rev 6.1

PDP Status Tab of Workbook Provides a Snapshot of PDP Progress by the Supplier Populated from APQP Spreadsheet Rev 6.1

Data Derived from the Supplier PDP Status is Used to Report Overall PDP Project Status Across Multiple Suppliers Rev 6.1

SQE’s issue the APQP/PDP Workbook to our Suppliers. When the Supplier utilizes the Workbook Project PDP reporting is automatically reported by Supplier and by Project to our Management Group. The APQP Spreadsheet acts as both a workbook and project tracker Relevant product information is entered Cross functional teams are established Individual tasks are selected and assigned Time lines are managed by date, responsibility, and percent of completion Documentation relative to the project is stored Overall APQP performance/progress is reported Rev 6.1