SJDEVLA Advisory Committee Meeting September 6-7, 2007 1 EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Veilux Fiber Optic Transceiver
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
BHEL – Electronics Division, Bangalore
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Cold Chain Surveillance Coordinator Provincial EPI cell.
The TIMING System … …as used in the PS accelerators.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
S. A. spoločnosť s r.o. Bratislava. Core activities of the S. A. 4 Computer technics 4 Data transfer services 4 Fiscal modules - POS 4 Software 4 Control.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Leon Abeyta LO-IF Engineer EVLA LO-IF PDR 22 January EVLA LO/IF Central and Antenna Reference Generation.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Reliability Applied to KM3NET
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
High Speed Digitizers EVLA Advisory Committee Meeting March 19-20, 2009 Steven Durand & Mike Revnell.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Future LBO Developments
Injectors BLM system: PS Ring installation at EYETS
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
WP02 PRR: Master Oscillator and RF Reference Distribution
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Production & Maintenance
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Terry Cotter LO/IF Group Leader
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting System Status
Mark McKinnon EVLA Project Manager
Background Information P.Napier
ESD Procedures for the Electronics Industry
Data Transmission System Digital Design Chris Langley NRAO
EVLA Advisory Committee Meeting System Status
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division

Electronics Division Manufacturing Goals Out-source board assemblies Build modules in-house as needed Facility is ready for production Electro-Static Discharge (ESD) protected facility

SJDEVLA Advisory Committee Meeting September 6-7, Outsource Circuit Cards Board Vendor Provides: Fully assembled boards/cables Some assemblies tested –Flying probe tests – NRAO test fixtures Just-in-time deliveries VLBA Site Techs building some cables and small module assemblies

SJDEVLA Advisory Committee Meeting September 6-7, In House Module Assembly Goal is to produce 28 identical antennas Small quantity builds, 5-10 at a time In-house module assembly and test Same team that built the prototypes Good job scheduling production

SJDEVLA Advisory Committee Meeting September 6-7, Electro-Static Discharge Prevention Program 12 ESD stations including floor mats ESD totes & parts bins ESD shoes & wrist straps Humidity controlled facility Staff training

SJDEVLA Advisory Committee Meeting September 6-7, In-House Assembly Support Complete in-house board assembly Reflow oven X-Ray machine Environmental chamber Secure storage

SJDEVLA Advisory Committee Meeting September 6-7, Quality Tools Shaker table Environmental chamber EVLA test rack Real-time monitoring Red/Green tag procedures

SJDEVLA Advisory Committee Meeting September 6-7, Quality Assurance Program Formalized written QA procedures Bench test fixtures –LabView test programs MainSaver maintenance software Collecting reliability data

SJDEVLA Advisory Committee Meeting September 6-7, Production Time Table Maintain the 6 antennas per year rate. Track funding profile Time to complete production –24 months to build LO and DTS modules –36 months to outfit the remaining 16 antennas –56 months to design & install the receiver suite

SJDEVLA Advisory Committee Meeting September 6-7, Electronic Modules Currently in Production –D301-4 DTS Module – excluding 3-bit digitizer –D305 Optical Wavelength Division Multiplexer –D351 DTS De-formatter –F317 Front End Controller –F320 Front End Transition Module –L354 LO Driver –L355 Digital Timing Distributor –L300 Synthesizer Reference Generator * –L GHz Synthesizer * –L GHz Synthesizer * –L304 LO Reference Receiver –L305 / L350 Reference Generators –L351 Offset Generator –L353 LO Transmitter * Minor mechanical retrofits anticipated

SJDEVLA Advisory Committee Meeting September 6-7, Electronic Modules Currently in Production (cont.) –M301 Converter Interface –M302/M303 utility modules –M304 Module ID –P301 LO/IF Rack DC/DC Power Supply –P302 Utility Rack DC/DC Power Supply –T301 4/P Converter –T302 LSC Converter –T303 UX Converter –T304 Baseband Converter * –T305 Baseband Converter - Digital –ACU/FRM Interface –Power Distribution Board for Antenna Racks –Main Shielded Equipment Racks –-48 VDC Power System –Front End Card Cage * Minor mechanical retrofits anticipated

SJDEVLA Advisory Committee Meeting September 6-7, Electronic Modules Not in Production P350/P351 Power supplies L352 Round Trip Phase measurement D301-4 DTS Module, 3-bit digitizer

SJDEVLA Advisory Committee Meeting September 6-7, Continuity of Operations Plan Hardware Redundancy Maintenance Plan Real Time Alarms Remote Monitor & Control

SJDEVLA Advisory Committee Meeting September 6-7, Hardware Redundancy Central rack power supplies –P350 modules are installed in pairs –5 pairs power the central racks Antenna -48Vdc power supplies –5+1 redundant Antennas are repaired by swapping modules –Spares are stored at the VLA

SJDEVLA Advisory Committee Meeting September 6-7, Slot ID is Functional Modules of each type are identical –Slot ID defines function –Hot swappable, rack stays powered Modules are identified using slot ID –Ea14-L302-1 Serial number and software version are also available from each installed module

SJDEVLA Advisory Committee Meeting September 6-7, Cold Start Requirement Power cycle causes automatic restart Personalities load from server/EPROM –Deformatter tests Remote monitoring and reset/resync –Antenna level initialization screen

SJDEVLA Advisory Committee Meeting September 6-7, Real Time Alarms Four severity levels: –Immediate Action –Antenna Rule –Maintenance Request –Informational Report Adjustable high and low trip points

SJDEVLA Advisory Committee Meeting September 6-7,

SJDEVLA Advisory Committee Meeting September 6-7, Increasing System Level Availability 1) Build a few prototypes 2) Field systems (10+ antennas) 3) Trend system reliability 4) Integrate findings and enhancements 5) Repeat 3-5

SJDEVLA Advisory Committee Meeting September 6-7, Availability Goal is to reduce the impact of hardware failures