VARCO PRUDEN’S Self Curbing Day Lighting Solution PrisMAX SL for SSR & HWR Roof’s.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
FRONT VIEW Spool pin Thread guide Bobbin winder Thread take-up lever
HORIZONTAL CONVERSION KIT 4PXC*U Upflow to Horizontal Left
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Team Uno 11/11/04 Bunker Curnes Product Assembly.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Lock Replacement. Step 1: Cut insulation behind lock mechanism.
Click on this image to open the full PDF document.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Cooling Business Group 1 INSTALLATION Directions.
HORIZONTAL CONVERSION KIT 4PXC*D Downflow to Horizontal Right
Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
L2000 Technical Training 6. Assemble/Disassemble.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Your all weather solution!. New thumb screw design, Creates better gasket contact.
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Equipment and Tool Institute June 18, Challenger Body Structure Diane Coopmans, Body Structures Engineering.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Nelson Research, Inc – N. 88 th St. Seattle, WA USA aol.com Design Concept for a Transducer Holding System Suitable.
Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
General Instructions for “KidWind Light” wind tunnel.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Testing the possibility of detecting the light emitted by the PPS.
Tools you will need #8 Torx driver #10 Torx driver Standard Phillips screwdriver Small (jewelers)Phillips screwdriver Small standard screwdriver.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Forging new generations of engineers. USING THE STRESS ANALYSER FOR TENSILE TESTING.
Recognise basic woodworking joints. 1 Can you name and state a use for these joints? These are angled butt joints, which can be used for the simple jointing.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Genuine N1. Conversion Installation manual LC 120 5D 2003
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
GLASS MEASURING GUIDE View Series.
STEP 1: ASSEMBLE ANGLE PLATES
Genuine N1. Conversion Installation manual LC
Using Stress Analyzer for Tensile Testing
Flag Installation on Roll-up Signs
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Flag Installation on Roll-up Signs
The Garage Assembly Instruction By Laser Dollhouse Designs
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
The Victorian Gazebo II Assembly Instruction
Required tools for installation of a V-1020C speaker with V-9914 bridge.
MVB-II Assembly Instructions
Panel Riveting Dept. Adjustable Part Holding Fixture
Ultra-efficient installation solutions
Making a 2-crate Plant Light Box, PLB
Omega Selection Center
Presentation transcript:

VARCO PRUDEN’S Self Curbing Day Lighting Solution PrisMAX SL for SSR & HWR Roof’s

PrisMAX SL GUIDES There are many versions of PrisMAX SL Installation Guides. It is important to review the guide that is sent with the “For Construction Package” before installation. Before installation, contact Varco Pruden if guide is lost or missing. This Presentation show the Basic installation on SSR. Installation on HWR is similar, but many parts will be different.

PrisMAX SL MODEL

PrisMAX SL DIVERTER Current Model Lens has top mounted screws vs side installed.

PrisMAX SL CROSS SECTION

BE SAFE!

TOOLS Note: A Rivet Tool for a 9/32” Olympic Rivet will be required for installing side rail rivets.

PARTS

BEGIN Locating the PrisMAX Unit Cutting the Rib

Locating the PrisMAX Unit Cutting Access Hole Preparing Diverter

Sealing the Closures

Preparing the Support Plate and the diverter

Preparing the Support Plate and the diverter (cont.)

Installing the Support Plate and the diverter

Installing the Side Rails

Multiple Units

Installing Side Rails

Upper Diverter Closure

Lower Diverter Closure & Cutting Access Hole

Lower Diverter Closure & Cutting Access Hole

Cutting The Roof Panels

Insulation

Foam Tape

Insulation Trim

Accessories

Tape When Accessories Are Used

Preparing for Lens

Attaching the Lens THE END of PrisMAX Installation

Installation of the “PrisMAX SL” Locate and make your cut

Installation of the “PrisMAX SL” Cut the roof panel for stiffener plate

Installation of the “PrisMAX SL” Locate and install plugs on stiffener plate

Installation of the “PrisMAX SL” Install Stiffener Plate

Installation of the “PrisMAX SL” Install Diverter

Installation of the “PrisMAX SL” Install Front Diverter

Installation of the “PrisMAX SL” Measure and Install Lower Closure

Installation of the “PrisMAX SL” Cut out panel inside rail

Installation of the “PrisMAX SL” Panel cut out

Installation of the “PrisMAX SL” Pull the fiberglass Insulation out

Installation of the “PrisMAX SL” Cut the facing

Installation of the “PrisMAX SL” Facing on side of rail

Installation of the “PrisMAX SL” Facing on side of rail with Foam Retaining Rod

Installation of the “PrisMAX SL” New Trim Kits

Installed “PrisMAX SL” Trim Kits

Installation of the “PrisMAX SL” Install first 10’-0” Lowside Unit for “multi-unit” systems

Installed “PrisMAX SL”

“PrisMAX SL”