RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Flange Protection Band. Flange Protection Band.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
RAILROAD COMMISSION OF TEXAS Pipeline Safety Division Texas Gas Association Transmission Roundtable November 13, 2014.
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
AGENDA 1. Qatar Petroleum (QP) Standardization and Standards Development. 2. Qatar Petroleum Efforts in Corporate National, Regional and International.
North Dakota Gas Pipeline Safety Program 2011 Summary.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
RAILROAD COMMISSION OF TEXAS Gas Plants & Refineries Application and Reporting Process Karen Cassidy, Engineering Unit August 2014.
Oil and Gas Air Quality Authorizations in Texas
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Unregulated Low-Stress Hazardous Liquid Pipelines Mike Israni & John Gale Aug 5, 2009.
Gas Transmission Pipelines
Railroad Commission of Texas Pipeline Safety Division.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Gathering Lines- Definitions, Background, and Proposed Rule Makings * 2011 Pipeline Safety Trust Annual Meeting – New Orleans Randy Knepper NAPSR Vice.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Corrosion Impact of Cathodic Protection on Surrounding Structures
Regulation of Pipelines
Book 2: Chapter 1 Introduction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand commodities.
Hazardous Liquid Pipelines
Electrochemistry-Corrosion Corrosion. Involves oxidation of metal; often returning them to their natural state (oxides or ores) Happens because the oxidation.
CWP Gas Job Funnel. CWP Funnel  CWP recently completed a gas funnel program for entry level laborer positions  Candidates were prescreened prior to.
South Dakota Gas Pipeline Safety Program 2011 Summary.
THE RAILROAD COMMISSION OF TEXAS EMERGENCY MANAGEMENT AND HOMELAND SECURITY A Collaborative Effort By: Team RRC Emergency Management Homeland Security.
Technical Advisory Committee December 2012 Fitness for Service.
Coverings Systems Range Arma-Chek. Covering Systems 2 Main target: provide UV protection and increase the insulation life expectancy reduce risk of CUI.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
HOUSTON, TEXAS1 Hazardous Liquid Pipelines ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Oversight and Safety Division September 2015.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton Date.
Cathodic Protection Requirements for Military Projects.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
PIPELINE SPECIFICATIONS
Samsung Heavy Industries Presenter: 정하림 박성규 김록한. 1.Introduction SHI & FPSO 2.Major process 3.Manufacturing process Contents.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton September 15-17, 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Need Information or Assistance? Where to go, what’s available and what’s not.
Distribution Integrity Management Program
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by Cheryl Stark Chair, ISO/TC67 – “Materials, equipment and offshore structures.
86 th Annual Operations Conference Ames, IA August 5, 2009.
Pipeline Regulations Update
Date of download: 9/30/2017 Copyright © ASME. All rights reserved.
Underground Storage Tanks New Federal 2015 Requirements
Petroleum Storage Tanks – Program Updates
PIPELINE SPECIFICATIONS
Presented to the Project Certification Committee on November 16, 2011.
Utility Considerations on Transportation Projects
TRENTON Casing Filler Presentation
Field Testing for Shorted Casings
Pipeline Cathodic Protection
Petroleum Storage Tanks – Program Updates
Annual Enforcement Report Overview
PIPELINE SPECIFICATIONS
ABC Company ABC Chemical Complex Engineering Specification
Gas Transmission Pipelines
Presentation transcript:

RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015

NEW PIPELINE CONSTRUCTION REQUIREMENTS

Session Overview Goals of this presentation is to: Clarify who the pipeline construction rules apply to Review what’s covered under the rules Provide information on Corrosion Control Requirements for cathodic protection

New Pipeline Construction Reports Applicability Gas Pipelines under 49 CFR 192 – Transmission – Gathering – Distribution/Mastermeter Liquid Pipeline under 49 CFR195 – Crude/Condensate – HVL Gas/Liquid under TAC – Offshore – Production

New Pipeline Construction Reports Requirements of the Rule Liquid, Gas Transmission or Gathering – PS-48 - Any construction totaling one or more miles (new or existing) Gas Distribution / Master Meter – PS-48 - New construction on natural gas distribution or master meter system of five miles or more LPG Distribution – PS-48 - New construction report for the initial construction of a new liquefied petroleum gas distribution system

Summary

New Pipeline Construction Reports Corrosion Control Requirements Liquids – New pipeline metallic systems, relocation or replacement of existing facilities, and the operation and maintenance of steel pipelines. Coatings shall be inspected with Holiday Detector Joints, fittings, and tie-ins shall be coated with materials compatible with the coatings on the pipe. Test lead wire material shall be compatible with the pipe coating and wire insulation.

Summary New Construction report applies to all pipelines under 192/195 & TAC PS-48 shall be submitted 30 days prior to activity Liquids has does have some construction requirements

Contact information 9