La Center, Washington: Balancing Pipelines and Populations 1.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Increasing Pipeline Safety Through Shared Planning Transmission Pipelines and Land Use: What needs to be accomplished and why? General Session --- November.
Applicants Rob & Judi McCarthy, SLO County Permit #DRC
Board of County Commissioners PUBLIC HEARING October 28, 2008.
The State of Natural Gas Pipelines in Fort Worth.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Proposed Land Use & Development Regulations Public Hearing Month Day, 2012.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
One the things we found most troubling about the City’s Draft Environmental Impact Report (DEIR) was that there was no information included about your.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
LOCAL GOVERNMENT TOOLS Jim Doherty Municipal Research & Services Center November 2006.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
Platting Update Orange County BCC January 27, 2015.
Candidate Briefing and Update. 45 minutes. Not a lot of time for most, for me IMPOSSIBLE ! ◦ Personal background ◦ Vision ◦ Development of a comprehensive.
Carly Ruacho, AICP, Senior Planner Skagit County Planning & Development Services Pipeline Safety Project.
Event Name/Date Presented by: Name/Title/Organization Pipelines and Informed Planning Alliance (PIPA)
Pipelines and Informed Planning Alliance A Real Estate Symposium International Right of Way Association/Appraisal Institute Las Vegas, NV January 13-15,
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Community Development Department Neoga Lakes – Development of Regional Impact (DRI) Master Planned Development (MPD) Rezoning Application.
Transfer of Development Rights
Glenn Archambault INTERSTATE GAS PIPELINE/ LANDOWNER/ 15 YEARS PIPELINES INFORMED PLANNING ALLIANCE BOARD MEMBER PIPELINE SAFETY TRUST MY FAVORITE HOBBY?
Pipelines and Informed Planning Alliance (PIPA) Pipeline Safety Trust Conference November 16, 2007 New Orleans, LA Presented by Jerry Kenerson.
Julie Halliday, Program Development DOT – PHMSA – OPS November 18, Pipeline Safety Trust Conference Pipeline Safety – Getting to Zero Pipeline.
Consultation zones To ensure communication using guidance from the Pipelines & Informed Planning Alliance (PIPA) Pipeline Safety Trust Conference Nov 4-5,
1 Impact Fees in Virginia Virginia Municipal League Annual Conference October 15, 2007 Jeffrey S. Gore Hefty & Wiley, P.C.
LAND USE, PLANNING, ZONING, AND ENVIRONMENTAL HAZARDS
UPDATE February 8, DRAFT PRESENTATION OBJECTIVES 1.Quick Overview a.Definition of Study Area b.Joint Land Use Study (JLUS - Dept. of Commerce-May.
Planning Processes/Permits “From Pre-application meeting to Board of Aldermen Approval.” “From Pre-application meeting to Board of Aldermen Approval.”
Legal Regulations for High School Road II BAINBRIDGE ISLAND MUNICIPAL CODES & COMPREHENSIVE PLAN CONDITIONAL USES.
Growth Management Legislative Discussion March 20, 2012.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
The Balcones Canyonlands Conservation Plan, Balcones Canyonlands Preserve, & Public Service Infrastructure William A. Conrad Secretary BCCP Coordinating.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Protecting Communities Co-Chairs Cathy Pratt- City of St. Peters Greg Ford- Williams Gas Pipeline;INGAA.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Case No. RZ APPLICATION TO REZONE ACRES FROM A-2 TO R1-AAA.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Planning Zones to Protect People Near Pipelines Chuck Lesniak City of Austin Watershed Protection Department.
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
Pipeline Safety & Development Changes File # ZON Proponent Carl Weimer, Whatcom County Council Docketed Unanimously by the Whatcom County Council.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
MONTGOMERY COUNTY PLANNING DEPARTMENT Maryland-National Capital Park and Planning Commission Master Plans in Montgomery County.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
An ordinance amending the County’s zoning and land use regulations to increase pipeline safety Adopted July 27, 2010.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Residential Plats Orange County Board of County Commissioners August 19, 2014.
Planning for Travel and Transportation Management National Training Center Course # Unit Three Land Use Planning Decisions.
Public Workshop May 14, 2013 Alachua County Board of County Commissioners.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 2: Land-Use Controls and Property Development.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Jim Doherty MRSC Legal Consultant
LOCAL GOVERNMENT TOOLS Jim Doherty Municipal Research & Services Center, Seattle November 2007.
Olema Farm House Coastal Permit/Minor Design Review/Use Permit Renewal State Route One, Olema APN
Scoping Meeting April 20th 6:00 pm
LEE FARM ADDITION – GDP AMENDMENT
Protected Area Any areas in which tree protection measures are required pursuant to this Chapter, including without limitation any Bluff Conservation Area.
Draft Transportation Element September 6, 2017
Planning and Development Commission
Land Use Assumptions Public Hearing - 5/31/18
Nick Bonvoisin Secretary to the Convention on the
Planning Commission Meeting: August 3, 2016
Competency: Create site plan drawings
Tools and Techniques for Management of Coastal Development
Board of County Commissioners
Presentation transcript:

La Center, Washington: Balancing Pipelines and Populations 1

La Center: Establishing a Framework Population Character Area Location County Annual Growth rate 2

Photo© Courtesy of Glenn Williams PDX 3

Washington State Growth Management Act County Comprehensive Plan County works with cities Urban Growth Areas Continuous Review Amendments—Once a year 4

Photo © courtesy of A McGill 5

The Challenge Comprehensive Plan—updated 2007 La Center Urban Growth Area expanded Possible annexation of land to city Two pipelines Awareness of past pipeline failures 6

7

An Evolving Approach Prescriptive practices Research – Low-rupture risk Responsibility to the public – Public safety concerns – Take reasonable measures Pipeline Safety Trust – Consultation and Planning Zones 8

The Result: Sensitive Utility Corridor Overlay District Purposes: – Minimize accidental damage to pipelines due to external forces – If pipeline fails: Avoid exposing uses requiring evacuation assistance to risk of injury or damage Help reduce adverse impacts – Improve communications between property owners 9

What’s A Sensitive Utility? Natural Gas Transmission Line – As defined by 49 CFR Section – Inside diameter of 8 inches or more 10

What’s An Overlay District? Additional requirements on an existing district – Low Density Residential (LDR) District – Uses specifically permitted in LDR District can continue Prohibited: Limited or conditional uses previously allowed 11

Ordinance Applicability All existing and proposed land uses within the Sensitive Utility Corridor “Development” Examples: Construction, reconstruction, demolition, grading, dredging, mining Removal or harvesting of vegetation Activities related to cultivation or use of land for agricultural purposes. 12

Ordinance Applicability (continued) Excluded from the term “ new construction” – An addition to, reconstruction or replacement of certain existing structures if the existing building footprints are used. Developer: Individual or legal entity 13

Composition of the Corridor Consultation Zone (CZ) Restricted Pipeline Area (RPA) “No Uses Requiring Evacuation Assistance Area” (NUREAA) 14

Consultation Zone 641 feet 1,282 feet 641 feet Methodology: “Potential Impact Radius” used in 49 CFR Part 192, Subpart O (Gas Transmission Pipeline Integrity Management) 15

Developer Responsibilities: CZ To the Pipeline Operator – Contact and provide documentation detailing the proposed development activity and location – Consult regarding compatibility of development with safe operation of the pipeline. 16

Developer Responsibilities: CZ (continued) To the City – Show CZ on all site plans and plats – Include disclosure on the plan or plat face – Provide written evidence of operator compatibility review when applying for development permit – Submit a State Environmental Policy Act environmental checklist with permit application for parcel within CZ 17

Developer Responsibilities: CZ (continued) To Their Contractors – Mark the CZ and restricted pipeline area on all engineering and construction drawings – Mark the restricted pipeline area with a temporary construction fence – Flag the restricted pipeline area 18

City Responsibilities—CZ To the Pipeline Operator – Issue permit only if received written verification regarding consultation To the “Developer” – When applying for a permit or making inquiries: Notify that development is within a CZ Explain the relevant application procedures Provide contact information for the pipeline owner 19

City Responsibilities—CZ (continued) To “general public” – Brochures and permits about potential excavation activities must contain “clear and concise” information about the state’s “one- call” requirements. – All maps prepared by the city planning or engineering staff with data about the location of roads and other infrastructure also must contain data indicating the location of the CZ and RPA. 20

Consultation Zone 641 feet 1,282 feet 641 feet Restricted Pipeline Area 21

RPA RPA = Area of the pipeline easement Prohibited Activities* – Construction – Expansion of structures – Other activities involving land disturbance *Unless pipeline owner gives written approval 22

RPA (continued) Allowed Activities – Pipeline or appurtenances – Facility producing, consuming, processing or storing gas transported by the pipeline – A crossing utility line – A utility service connection – A road – A surface parking lot 23

Responsibility of Owner of Property With RPA Before transferring title: Deliver a document to the proposed grantee describing – The restricted pipeline area – The limitations on its development – Name and address of the pipeline owner or operator 24

Consultation Zone 1,282 feet 250 feet 641 feet No Uses Requiring Evacuation Assistance Area (NUREAA) 25

NUREAA NUREAA = Within 250 feet of outer edge of pipeline easement Prohibited uses** include: Congregate living Hospitals Schools (public and private) Other uses—as determined by the City Planner—posing a safety concern because of the characteristics of the occupants, development, or site ** Uses requiring evacuation assistance 26

Uses Requiring Evacuation Assistance—Outside the NUREAA Area from outer edge of NUREAA to outer edge of CZ Uses requiring evacuation assistance allowed: – Hearing must be held – County Fire Marshal must make certain recommendations 27

Fire Marshal Recommendations (Partial List) Structure – Can protect occupants from the immediate effects of a catastrophic pipeline explosion – Has a performance-based design that provides adequate time for evacuation to a safe place in the event of a pipeline leak or fire Emergency procedures are in place 28

29

Draft PIPA Recommended Practices 30

Draft PIPA Recommended Practices Baseline (BL) Recommended Practices – Preparing for future development or new pipeline siting New Development (ND) Recommended Practices – New developments proposed in vicinity of pipelines New Pipeline (NP) Recommended Practices – Planning the route for new pipelines. 31

Draft PIPA Recommended Practices in La Center Regulations Consultation Zone – BL 04—Adopt an ordinance – BL 05—Define the CZ Planning Zone – BL 06–Adopt a planning zone Consider adopting recommended New Development (ND) practices 11 through 23 Real Estate Disclosure – BL 18—Pipeline Easements 32

Resources Dale Miller, City Planner, La Center (360) PIPA Draft Recommended Practices 33