Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT.

Slides:



Advertisements
Similar presentations
Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Advertisements

Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
and Trend for Smart Grid
中 国 水力资源与开发概况 Overview of Hydropower Resources and Development in China Zhou Shangjie China Society for Hydropower Engineering.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
1 © 2012 Lockheed Martin Corporation, All Rights Reserved Intelligent Microgrid Solutions Efficient, Reliable and Secure Solutions for Today’s Energy Challenges.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Virtualization and HA PI Systems: Three strategies to keep your PI.
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
The Status Quo, Barriers, and Countermeasures to Small Hydropower Development in Rural China Hydropower and Rural Electrification Development Bureau, the.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Critical Facilities, Data Center,& IT Regional Seminar Series Mike.
Answers for infrastructure and cities. © Siemens AG 2013 All rights reserved. Energy meets intelligence METE TAŞPINAR Smart Grid The Smart Grid - Constant.
PI-The Backbone of Conectiv Energy’s Generation Asset Management. Amit Mahajan And Paul Wassil.
Smart Cities & Smart Utility
VSE a.s Page 1 Východoslovenská energetika a.s. We invest in the region Košice, October 19, 2010.
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
Prepared by Dr. ML Chan, ML Consulting Group, USA & Mr. Yimin Wang, State Grid Corporation of China,
Smart Grid in Transmission Engineering Cell, GETCO, Vadodara.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Smart Grid APPA Annual Meeting Kiah Harris Burns & McDonnell June 15, 2009.
ENERGY IN THE MEDITERRANEAN REGION: Situation and prospects Dr Houda BEN JANNET ALLAL, OME General overview of renewable energy and energy efficiency in.
Fleet Performance and Reliability in Generation Utilities
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Turkish Power System Overview March 2012
February 2003 Using PI-ACE & PI-MDB in applications for Hydro Energy Production.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
SMART GRID The Next Generation Electric Grid Kunkerati Lublertlop 11/30/2011 Electrical Engineering Department Southern Taiwan University.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
© 2008 OSIsoft, Inc. | Company Confidential Smart Grid, Smart Metering and DSM OSIsoft and Cisco systems Arjen Zwaag- Cisco Martin Otterson- OSIsoft.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Sanjay Garg General Manager PGCIL/ Ministry of Power
RtPM for Asset and Environmental Monitoring Dave Wilson - National Grid Paul Verey - Capula.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Smart Grids: Ireland’s Unique Opportunity Doireann Barry, Smart Grid Programme Manager.
NEMMCO Bryan Connell Terry Day. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 2 NEMMCO was established in May 1996 to implement,
Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.
Smart Grid Energy Generation Renewable Energy Distributed Generation Transmission & Distribution Load Management Demand Response Electrical Vehicles Charging.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
ABB Power Technologies Network Management ABB Industrial IT for Network Management.
Steady State Analysis Of A Microgrid Connected To A Power System
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
Maximizing Electrical Output at ComEd Nuclear Stations by David J. Miller Kevin Rumbaugh James Rafferty and Gary Loeb.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Issues of Grid Integration of Renewables : Creative solutions 09/11/2012Mickaël HERVY01 / 11.
Smart Grid Schneider Electric Javier Orellana
Real Time Goes Mainstream Dr. J. Patrick Kennedy, CEO and Founder OSIsoft Inc.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Real Time Information and Dynamic Response Dr. J. Patrick Kennedy, CEO and Founder OSIsoft Inc.
Smart Grid PRESENTED BY: ZUBAIR AHMAD
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Siemens Smart Grid Driving Value in a Digital World
Module 4 Smart Grid Implementation Issues
NS4960 Spring Term, 2018 China: Expanded Renewables
POWER GRID INTERCONNECTIONS IN CHINA
RE Grid Integration Study with India
Presentation transcript:

Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 2 AGENDA A Power Hungry China How to Face the Challenge Power Generation Solution T&D Solution Q&A

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 3 A Power Hungry China How to sustain China’s GDP Growth Rate: –Suppose China wants to sustain its GDP at 10% rate for the next decade –China needs to add additional MW of new generation capacity per year –It’s equivalent to 2/3 of current total generation capacity of Great Britain –This is equivalent to one new 100 MW power plant every week –Total investment of $590 Billion US --From “China Electricity Council”

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 4 Confidential to Power Generation Year 2005Year Avg./year Energy Gen. (TWH) % Increase Energy Gen. (TWH) Energy Hydro Gen. (TWH) Increase Energy Gen. (TWH)171.4 Energy Coal Gen. (TWH) Increase Energy Gen. (TWH)663.8 Energy NG Gen. (TWH) Increase Energy Gen. (TWH)90.1 Energy Nuclear Gen. (TWH)5164 Increase Energy Gen. (TWH)13 Energy Others Gen. (TWH)3.315 Increase Energy Gen. (TWH)11.7 Year 2005Year Avg./year Installed Gen. Capacity (GW) % Increase Capacity (GW) Hydro Gen. Capacity (GW) Increase Capacity (GW)57.44 Coal Gen. Capacity (GW) Increase Capacity (GW)159.3 NG Gen. Capacity (GW) Increase Capacity (GW)20.75 Nuclear Gen. Capacity (GW) Increase Capacity (GW)2 Others Gen. Capacity (1.56 Increase Capacity (GW)4.5 State Power Comp (11 th 5 year plan) North China Northeast China Northwest China East China Central China South China National Total Year 2005 Energy Demand (TWH) Installed Capacity (GW) Year 2010 Energy Demand (TWH) Installed Capacity (GW)

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 5 Confidential to Power Transmission Development Substation Project Projects that are building year 2005 ± 500KVDC Qty 2 ± 500KVDC Capacity (MW) 6, KVAC Qty2 750KVAC Capacity (MVA)3, KVAC Qty46 500KVAC Capacity (MVA)33, KVAC Qty11 330KVAC Capacity (MVA)3, KVAC Qty KVAC Capacity (MVA)26,045 State Power Co’ Number(Next 5 Years) Substation ProjectOne Typical Province Planning (Year ) 500KVAC Qty (extend) 500KVAC Capacity (MVA)39, KVAC Qty (extend) 220KVAC Capacity (MVA)64,000

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 6 FIRST SECOND THIRD FOURTH FIFTH NATIONAL CONTROL CENTERS northcentralnorthwestnortheasteastsouth Twenty-three provincesFour duchiesFive municipalities ABCD The city under the province 、 municipality, duchy ………..counties NATIONAL SIX REGIONALS OVER THREE HUNDREDS CITIES OVER 32 PROVINCES LEVEL OVER THOUSANDS COUNTIES Five Level Dispatch Architecture

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 7 Other Key Factor Strategy of Industrialized Nation –City population of 0.33 Billion to 0.65 Billion –More demand on power, housing, education, transportation and health care –Emphasis on Productivity instead of Capacity

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 8 Power Generation Solution Supervisory Information System (SIS) 1.Required for New Power Plant with 2*300MW up. 2.All data has to be saved into SIS database 3.Plant Level Performance Calculation 4.Optimization and Operation Support Real-time Data Center for Power Plant (RtDC) 1. Required for All Power Plant(Can use SIS for New Plant) 2. Gateway to Operation Management and ERP system

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 9 Architecture Overview #1 DCS #1 PLC #1 RTU#2DCS #2PLC #2RTU Interface Firewall SIS Application SIS ManagerSIS Operator Physical Isolator Mirror Server MIS/ERP Server Clients Internet Secured Area III Secured Area II Secured Area I DCS Network SIS Network MIS Network Security Level I Web Server Security Level II SIS Server

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 10 Application SIS RtPM Time Series Database Real-Time Control System (DCS, PLC, NCS, RTU) BASE FUNCTION Operation Support Real-Time Supervisory Performance Calculation Control Optimization Condition Based Maintenance Online Test EXTENDED FUNCTION

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 11 Real-Time Supervisory Unit Overview Boiler System Power Flow

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 12 Performance Calculation [Standard] : 1. ASME Standard ( PTC ) 2. Boiler Performance Test (GB ) 3. Turbine Performance Test (GB ) 4. Condenser Performance Test ( JB/T ) [Plant Performance] : 1. Coal Consumption Rate 2. Total Heat Ratio 3. Assembly Heat Ratio 4. Thermal Efficiency 5. Auxiliary Power Ratio 6. Total 140 Calculation

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 13 Performance Calculation

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 14 Thermal Energy Analysis ActualTargetDiff

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 15 Operation Support Stability Indictor

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 16 Operation Support Emission Indictor

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 17 Condition Based Maintenance Condition Monitoring

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 18 T&D Solution Massive Construction of T&D Network to Deliver the Power Requires Applications at Large Scale: EMS AMR WAMS Power Marketing System Huge Amount of Real-Time Data from above system Requires Concentration of Real-Time Data : RtDC (Real-time Data Center)

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 19 State Grid Southern Grid Face the Challenge Separation of Transmission into two Power Grid companies

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 20 Northeast Northern Northwest East Central Southern Tibet Xinjiang 6 Large-Scale Grid 31 Provincial Grid Confidential to National Inter-connection Backbone Grid In China National Grid Area Distribution

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved Transmission Backbone Grid Tunnel from West China to East China Northern Backbone Tunnel from Northwest to Northern China, and connection with Northeast and Shandong Grid Central Backbone Tunnel from ChuanYu & Central to East China, and connection with Fujian Grid Southern Backbone Tunnel from Southwest to Southern China West to East Interconnection

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 22 Northern to Southern Tunnel from Northern China to Central China Western Backbone Tunnel from Northwest to ChuanYu Grid Central Backbone Tunnel from Northern to Central China, then to Southern Grid West to Central/South Interconnection

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 23 Specification for Real-time System Conventional Protection Wide Area Protection SCADA/EMS

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 24 Limit of Relational DB for EMS Problem with Real-time Data in Relational DB –SCADA Data, for large T&D Network 2 s per each tag → value/day* 26 bytes → 1.2MB/tag·day 100,000 Tag EMS/Day → GB/Day 100,000 Tag EMS/Year → 40,996.8 GB /Year AMR data, 21,000,000 meters, 1 second, 10 variables per meter –Average Value 15 m per each tag → 96value/day* 26 bytes →2,496 bytes /tag·day 100,000 Tag EMS/Day → MB /Day 100,000 Tag EMS/Year → 91.1 GB /Year –Schedule Value 96Value ×100,000Tag = 9,600,000 Event/Day = 3.5 Billion Event/Year

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 25 Mission Impossible for WAMS Problem with Real-time Data in Relational DB –PMU for One Substation Value: 48 Vector, 8 Analog and 20 Status → 268B(data Length) Bandwidth: 20 ms per frame of data = 50*268= 13KB per second Event: 76*50 = 3800 event/per second –WAMS with 50 PMU Bandwidth: 13KB * 50 = 650KB/per second Event: 3800*50 = event/per second –Total Data Size Data Stream: 650KB*60*3600= 14G/Day

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 26 North China WAMS Pilot Project PI RtDC WAMS Apps ORACLE

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 27 WAMS Application Prony AnalysisReal-Time FFT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 28 WAMS Trend By Year 2006 North China: 65 PMUs East China: 44 PMUs Central China: 35 PMUs South China: N/A By Year 2007 Provincial Level WAMS system will start

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 29 EMS Trend PI RtDC PI RtDC EMS WAMS PowerMarket Metering Fault Record Critical Assets Power System Control Center Master Stations Servers Networks Facility Equipment Time-Series Data Others Corp Data Timestamp Name Value Transactional Relational

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 30 EMS Trend RtDC DMZ Existing EMS(Anhui/Hubei) Real-Time Database Historian (Oracle/Sybase ) New EMS(South China Grid) Real-Time Database Historian (Oracle/Sybase ) Future Next Generation EMS Real-Time Database PI Snapshot Database

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 31 Next Generation EMS Key Features –Single database –Module database-Analysis Framework –Fast load flow solutions based on distributed computing –Surface graphics –Advanced dispatching and generation control –Integrated State Estimator –Advanced damping control –Reliable

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 32 QUESTIONS ?