Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
NORTHWEST POWER POOL Reliability Update
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
LED Case Lighting With and Without Motion Sensors Michele Friedrich – Sr. Engineer PECI 1/5/2010.
Measuring What Matters November 7 th Agenda Review and update of tasks and timeline Review and update of tasks and timeline Role of RTF Role of.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
NORTHWEST POWER POOL Reliability through Cooperation
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
Interlocal Cooperation for a Sustainable and Secure Water Supply Don Greeley Regional Managers Meeting April 8 th, 2014.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N PTR System Long-Term Strategy Regional Technical Forum September 15, 2009 Rasa Keanini.
Draft 3/18/ Simplified Voltage Optimization M&V Protocols Getting to Delta V Regional Technical Forum Presentation April 6, 2010.
Northwest Power and Conservation Council The Role of the Regional Technical Forum in PNW Energy Efficiency Programs May 14, 2008.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
1 Performance Tested Comfort System Program Update January 24, 2007.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Developing A Pacific Northwest Smarter Grid Workforce A Case Study in Regional Collaboration For Workforce Development In Clean Energy Northwest Hydroelectric.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
RTF Policy Advisory Committee Gillian Charles 1/24/13 Update on RTF Financials.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Northwest Power and Conservation Council Action Plan Summary.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Center for Energy Workforce Development Pacific Northwest Regional Meeting Portland, OR July 28-29, 2009 Barbara Hins-Turner Executive Director, Center.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Plan Today. Power Tomorrow. The Utility Perspective PNUCC June 11, 2009.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
Interim and Long-term Approaches for Assessing Wind’s Contribution to Capacity Adequacy PNW Resource Adequacy Steering Committee Meeting July 21, 2008.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
2010 Work Plan Steering Committee January 29, 2010.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Proposed 2015 Work Plan and 3 Year Look Back September 18, 2014.
How The Regional Technical Forum Supports PNW Energy Efficiency Programs January 5, 2010.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
NW Loss of Load Probability James Gall Power Supply Analyst
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Topics Corporate Overview – Transmission Expansion Planning - Members
Pacific Northwest Aggregated Demand Response Demonstration Project
NEEA Products Council Meeting Air Saving Unit Investigation
Northwest Demand Response Symposium
The Columbia River Treaty and its Future
Update on Utility Integrated Resource Plans
Pacific Power Seismic Preparedness Update
NW Demand Response Symposium
Jeff King Northwest Power & Conservation Council July 28, 2010
Energy Northwest 1957 A not-for-profit Municipal Corporation
NEEA Products Council Meeting Air Saving Unit Investigation
ADS and WPR Seed Case Background
ADS and WPR Seed Case Background
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3 day cold snap or heat wave. Study Purposes:  Inform hydro utilities’ resource planning efforts  Assure consistent assumptions are used for individual sustained hydro peaking studies, such as assumed flows on common tributaries;  Provide a check of the GENESYS-based Regional Sustained Hydro Peaking Capability result; and  Help assure consistent reporting of hydro capacity to the Western Electricity Coordinating Council’s Loads and Resources Subcommittee (WECC LRS) and the Pacific Northwest Utilities Conference Committee (PNUCC). 1 Don Long Services st Ave SE - Ephrata WA 98823

Study Deliverables:  Contact each hydro utility’s representative to ascertain whether sustained hydro peaking analyses are available for its projects, or can easily be run for the projects for the defined water conditions, or will require the development of a model  Develop a detailed work plan, cost estimate and schedule for Phase II  Develop a preliminary plan for a repeatable process to allow for calculation of the regional sustained hydro peaking capacity analysis on a periodic basis Schedule: Phase 1 start date:July 14, 2008 Original Phase 1 due date:September 12, 2008 Revised Phase 1 due date:October 19, Don Long Services st Ave SE - Ephrata WA 98823

Contacts with utilities:  Many of the listed points of contact were unaware of the study  Several referred me to someone else as the correct point of contact  Status of 14 surveyed utilities willingness to participate: 7 will perform all of their own studies 1 will perform its own studies on 1 project and use the regional model for 4 small projects 4 will use regional model for all projects 2 have not agreed to participate at all Outstanding issues:  Release of discharge data for use by downstream projects  Release of study detailed results to consultant for verification 3 Don Long Services st Ave SE - Ephrata WA 98823

Utilities who will perform their own modeling:  Avista (will share studies to consultant for review, but will not allow release of discharge data for use in downstream projects’ studies)  Eugene (Carmen only)  Idaho Power  PacifiCorp (Verbal agreement to participate. Have not agreed to provide study results to consultant for review)  PGE (Has provided results of their own study, but may be insufficient detail for review)  PSE (verbal agreement to participate)  Tacoma  BPA 4 Don Long Services st Ave SE - Ephrata WA 98823

Utilities who will use regional model:  Chelan  Douglas  Eugene (all except Carmen)  Grant  Snohomish 5 Don Long Services st Ave SE - Ephrata WA 98823

Utilities who have not agreed to participate: (Consultant will make assumptions to model their projects based on known or assumed data)  Montana  Seattle 6 Don Long Services st Ave SE - Ephrata WA 98823

Utilities not contacted: (Projects will be modeled with simplifying assumptions)  City of Centralia  Fall River REA  Lewis County PUD  Pend Oreille PUD  City of Portland  Bonners Ferry  Energy NW  City of Idaho Falls  Twin Falls Hydro  Warm Springs Tribe 7 Don Long Services st Ave SE - Ephrata WA 98823

Number of projects to be modeled: (Note: FCRPS Projects not included in count)  Modeled by project owner: 76  Modeled by consultant using regional model: 13  Modeled by consultant with simplifying assumptions: 9  Projects owned by utilities who have not agreed to participate:  Model with regional model: 12  Model with simplifying assumptions: 5 _____  Total projects115 8 Don Long Services st Ave SE - Ephrata WA 98823

Phase II Workplan:  Obtain approval by BPA and the Council of Phase II approach  Develop a spreadsheet model for determining sustained peaking capability  Gather project data for projects for which the regional model will be used and studies from utilities who are doing their own modeling  Run model for selected projects  Verify studies from utilities who are doing their own modeling  Fill in Technical Exhibit D.1 for all projects  Present results to the Forum  Aggregate and check reasonableness of purchase assumptions for all utilities  Prepare a description of the final methodology to allow the analysis to be a repeatable process 9 Don Long Services st Ave SE - Ephrata WA 98823

Phase II Schedule and Cost Estimate: (Assumes Phase II begins January 1, 2009  Estimated completion date:October 11, 2009  Estimated cost:$152, Don Long Services st Ave SE - Ephrata WA 98823

Preliminary plan for a repeatable process to allow for calculation of the regional sustained hydro peaking capacity on a periodic basis.  Obtain agreement from all regional utilities that they will participate in determining the regional sustained hydro peaking capacity  Encourage all utilities to use the spreadsheet model developed by the Contractor  Provide training to utilities on use of the spreadsheet model  Perform regional analysis at least once every three years to reflect potential changes in load shapes, owned or contractual resources other than hydro and purchases 11 Don Long Services st Ave SE - Ephrata WA 98823