Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
Module N° 6 – Prescription/Performance based environment.
Advertisements

Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
Colorado Springs Airport
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
MAJOR REPAIRS AND ALTERATIONS
Airport Obstruction Standards Committee (AOSC)
1 #4295. Which frequency should you expect to use for Regional Approach Control, control tower, and ground control respectively at DFW when coming from.
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
Presented January 20, 2011 by: John Allen Director, Flight Standards Service (AFS-1) Federal Aviation Administration Public Aircraft Operations Forum.
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
Airport Obstruction Issues And ASM GAA Workshop February 25, 2015 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program.
Presented to: By: Date: Federal Aviation Administration AEA Office of Runway Safety Runway Safety Initiatives Airports Conference Runway Safety 04/02/2012.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
WHAT AIRPORT MANAGERS NEED TO KNOW ABOUT TERPS Association of California Airports Lake Tahoe, California September 10, 2014 QED Airport & Aviation Consultants.
Recent Lighting and Marking Design Challenges/Trends
Approach Charts and Procedures
Federal Aviation Administration Airport 20 to 1 Approach Surface & Restoring Night Minimums Georgia Airports Association (GAA) 2015 Annual Workshop Cindy.
VISUAL APPROACHES.
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
A- Class B airspace to 10,000 feet MSL.
Presented to: By: Date: Federal Aviation Administration FAAST Runway Safety Training Proper Planning Promotes Safer Ground Operations.
AIRSPACE What’s old –What’s new!.
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
Federal Aviation Administration Unmanned Aircraft Systems in the National Airspace System Coming soon to airspace near you…..UAS-101 Presented At: Pecora.
Federal Aviation Administration Runway Safety Action Team 2014 Gary A. Palm ATM Teterboro ATCT.
Houston Flight Standards District Office Manager Holly W. Geiger
Outcome: Zero fatalities resulting from runway incursions.
0 Downloaded from FAA Runway Safety Briefing Sun ‘n Fun EAA Fly-In April 2002.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
By: FAASTeam Federal Aviation Administration Land and Hold Short Operations (LAHSO)
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
ICAO Requirements on Certification of Aerodromes Module - 2
Airport Markings & Signs
Airport Lighting, Markings and Sign Systems
Transportation Emergencies
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer 2012 RVR/Prevailing Visibility Conversion and.
Presented by: Roger Sultan, FAA Aviation Safety Inspector; AFS-400 Date: February 25, 2015 Federal Aviation Administration Operational impact of §
A Runway/Taxiway marking and signage quiz
Communications, Airspace and a bunch of other stuff ! Rick L. Crose Orlando International Tower.
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer CFR Part 135 Automated Surface Weather.
Air Transport Association of Canada Safety Advisory Committee Larry Lachance Assistant Vice President, Operational Support November 7, 2010.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
FLIGHT SAFETY LOGO PAGE
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
Sun-n-Fun 2001 Steve Shaffer National Runway Safety Program Steve Shaffer National Runway Safety Program April 13, 2001.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Wes Timmons, Director of Runway Safety, FAA April 2009 Federal Aviation Administration Runway Safety: Sun ‘N Fun Update.
Reduced/Low Visibility Operations – ATAC AGM, November, 2010.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
2015 GDOT PowerPoint Title Page Sub Titles Body Text Obstruction Evaluation “What are all these surfaces?” GAA Spring Conference February 19, 2016 Presented.
Presented to: By: Date: Federal Aviation Administration FAASTeam & North Florida Flight Standards District Office FAA Safety Team Safety Presentation Airspace:
UAS Operations in the Golden Triangle Mike Hainsey Executive Director Golden Triangle Regional Airport.
REGULATIONS FOR ARMY AIRCRAFT CW2 ROBERT GOEBEL. Administrative Please turn off all: –Cell phones –Beepers –Palm Pilots –Gameboys –Stereos –Watch alarms.
Federal Aviation Administration Presented to: OSWG Presented by: Chris Hope Date: March 9, 2016 ILS Performance Classification OpSpec C061.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
Physical Characteristics
Aerodrome Operations under Limited Visibility Conditions
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
Association of California Airports Instrument Flight Procedures
AIR TRAFFIC CONTROL SERVICE
2017 Annual Conference, South Lake Tahoe Rayvon Williams,
Presentation transcript:

Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration Airport Obstructions Standards Committee FAA Broadcast On Precision Obstacle Free Zone (POFZ) Implementation FAA Broadcast On Precision Obstacle Free Zone (POFZ) Implementation

Federal Aviation Administration 2 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Agenda Introduction Broadcast Objectives AOSC Background Overview of POFZ POFZ Examples ARC-1 Memo to RAPTs Frequently Asked Questions Questions & Answers Introduction Broadcast Objectives AOSC Background Overview of POFZ POFZ Examples ARC-1 Memo to RAPTs Frequently Asked Questions Questions & Answers

Federal Aviation Administration 3 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Broadcast Objectives Develop common understanding of POFZ requirements Provide clarifying guidance to regional teams Discuss associated implementation issues Develop common understanding of POFZ requirements Provide clarifying guidance to regional teams Discuss associated implementation issues

Federal Aviation Administration 4 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 AOSC Background Chartered May 2003 The AOSC works across FAA lines of business to transform outdated, inconsistent obstruction standards practices to future policy that optimally balances operational safety, effectiveness, and economic benefit Chartered May 2003 The AOSC works across FAA lines of business to transform outdated, inconsistent obstruction standards practices to future policy that optimally balances operational safety, effectiveness, and economic benefit

Federal Aviation Administration 5 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 AOSC Steering Group Reports to Deputy Administrator, ADA-1 AOSC Steering Group Membership –Ruth Leverenz, ARC-1 –Catherine Lang, ARP-1 –Russ Chew, ATO-1 –Nick Sabatini, AVS-1 Reports to Deputy Administrator, ADA-1 AOSC Steering Group Membership –Ruth Leverenz, ARC-1 –Catherine Lang, ARP-1 –Russ Chew, ATO-1 –Nick Sabatini, AVS-1

Federal Aviation Administration 6 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 AOSC Decision Documents DD01 - POFA and Runway Separation, dated 12/18/03 DD :1 Departure Surface, dated 9/13/04 DD03 - Atlanta End-Around Taxiway (Departure Only), dated 7/12/04 DD04 - Runway / Parallel Taxiway Separation Standards, dated 03/21/05 DD05 - Airport Traffic Control Tower Interim Siting Guidance, dated 06/08/05 DD06 - Dallas / Fort Worth (DFW) End-Around Taxiway System, dated 06/08/05 DD01 - POFA and Runway Separation, dated 12/18/03 DD :1 Departure Surface, dated 9/13/04 DD03 - Atlanta End-Around Taxiway (Departure Only), dated 7/12/04 DD04 - Runway / Parallel Taxiway Separation Standards, dated 03/21/05 DD05 - Airport Traffic Control Tower Interim Siting Guidance, dated 06/08/05 DD06 - Dallas / Fort Worth (DFW) End-Around Taxiway System, dated 06/08/05

Federal Aviation Administration 7 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Introduction POFZ protects the area of short final area during very low ceilings (<250’ feet) and or visibilities (<3/4 Sm or < 4000’ RVR) P O F Z Final Approach “W” Surface TERPS 34:1 area 400’ 200’ 2 4

Federal Aviation Administration 8 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Applicability  The requirement to clear the POFZ applies when an aircraft on a vertically guided final approach is within 2 nautical miles of the runway threshold and the reported ceiling is below 250 feet and/or visibility less than ¾ SM (or runway visual range below 4,000 feet).

Federal Aviation Administration 9 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Applicability (Cont’d)  The POFZ is considered clear even if the wing of the aircraft holding on a taxiway waiting for runway clearance penetrates the POFZ; however, neither the fuselage nor the tail may infringe on the POFZ.  If the POFZ is not clear, the MINIMUM authorized height above touchdown (HAT) and visibility is 250 feet and ¾ statute mile (SM).  The POFZ is considered clear even if the wing of the aircraft holding on a taxiway waiting for runway clearance penetrates the POFZ; however, neither the fuselage nor the tail may infringe on the POFZ.  If the POFZ is not clear, the MINIMUM authorized height above touchdown (HAT) and visibility is 250 feet and ¾ statute mile (SM).

Federal Aviation Administration 10 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Compliance In the approved AOSC Decision Document #01, the requirement was set for the POFZ guidance to be applied uniformly to all airports nationally by January 1, 2007 It was further noted that “any airport that fails to meet the POFZ guidance by that date will not have its procedures approved at their next subsequent biennial review”. In the approved AOSC Decision Document #01, the requirement was set for the POFZ guidance to be applied uniformly to all airports nationally by January 1, 2007 It was further noted that “any airport that fails to meet the POFZ guidance by that date will not have its procedures approved at their next subsequent biennial review”.

Federal Aviation Administration 11 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Examples

Federal Aviation Administration 12 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 P O F Z T E R P S

Federal Aviation Administration 13 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 P O F Z T E R P S

Federal Aviation Administration 14 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 P O F Z T E R P S

Federal Aviation Administration 15 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 P O F Z TERPS

Federal Aviation Administration 16 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ TERPS ILS Critical

Federal Aviation Administration 17 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 T POFZ TERPS POFZ TERPS POFZ TERPS

Federal Aviation Administration 18 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 ARC-1 Memo to RAPTs (12/16/05) Less than a year remains before the POFZ implementation deadline Help is needed to ensure that implementation strategies are developed and the necessary actions are taken at any affected airports. –Implementation oversight by the Region is critical to successful implementation –Regional Airspace Procedures Team (RAPT) support is needed Less than a year remains before the POFZ implementation deadline Help is needed to ensure that implementation strategies are developed and the necessary actions are taken at any affected airports. –Implementation oversight by the Region is critical to successful implementation –Regional Airspace Procedures Team (RAPT) support is needed

Federal Aviation Administration 19 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 ARC-1 Memo to RAPTs (12/16/05) Cont. Specifically, the AOSC requested (by February 28, 2006) the RAPT to: –Review the requirements outlined in AOSC Decision Document #01 (attached) to keep the POFZ clear under the specified conditions and determine the appropriate method of compliance for each runway end with a current or near-term planned precision approach. –Identify the locations where additional markings/signage are needed and a target date for completion Follow-up by the RAPT toward the end of 2006 may also be needed to ensure that the necessary actions are completed by the January 1, 2007 deadline. Specifically, the AOSC requested (by February 28, 2006) the RAPT to: –Review the requirements outlined in AOSC Decision Document #01 (attached) to keep the POFZ clear under the specified conditions and determine the appropriate method of compliance for each runway end with a current or near-term planned precision approach. –Identify the locations where additional markings/signage are needed and a target date for completion Follow-up by the RAPT toward the end of 2006 may also be needed to ensure that the necessary actions are completed by the January 1, 2007 deadline.

Federal Aviation Administration 20 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 POFZ Reference Material AOSC Decision Document #01 Advisory Circular 150/ D “Standards for Airport Sign Systems” Advisory Circular 150/5340-1J, “Standards for Airport Markings” Airport Certification Program Policy and Guidance, Policy #88 FAA Order R, “Air Traffic Control” (Section 3-7-6) FAA Order R, “Facility Operation and Administration” (Section ) ATO training briefing Aeronautical Information Manual (Section b) AOSC Decision Document #01 Advisory Circular 150/ D “Standards for Airport Sign Systems” Advisory Circular 150/5340-1J, “Standards for Airport Markings” Airport Certification Program Policy and Guidance, Policy #88 FAA Order R, “Air Traffic Control” (Section 3-7-6) FAA Order R, “Facility Operation and Administration” (Section ) ATO training briefing Aeronautical Information Manual (Section b)

Federal Aviation Administration 21 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Frequently Asked Questions Does POFZ apply to GPS WAAS approaches? –The POFZ applies to any approach with ceiling below 250 feet and/or visibility below 3/4 of a statute mile or below 4,000 RVR. Does POFZ apply at military airports? –The POFZ applies at joint-use facilities. How do we determine the 250 foot ceiling requirement? –The reportable values from appropriate weather sources should be used to determine ceiling height. Does POFZ apply to GPS WAAS approaches? –The POFZ applies to any approach with ceiling below 250 feet and/or visibility below 3/4 of a statute mile or below 4,000 RVR. Does POFZ apply at military airports? –The POFZ applies at joint-use facilities. How do we determine the 250 foot ceiling requirement? –The reportable values from appropriate weather sources should be used to determine ceiling height.

Federal Aviation Administration 22 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Frequently Asked Questions How do we apply POFZ at non-towered airports or towers that have limited hours? –Pilots will be notified of POFZ requirements at all airports (including non-towered airports) through the Aeronautical Information Manual (AIM). Hold lines should be placed at the most conservative location to protect both the POFZ and the ILS critical area. Pilots are required to understand and comply with these markings. How do we apply POFZ at non-towered airports or towers that have limited hours? –Pilots will be notified of POFZ requirements at all airports (including non-towered airports) through the Aeronautical Information Manual (AIM). Hold lines should be placed at the most conservative location to protect both the POFZ and the ILS critical area. Pilots are required to understand and comply with these markings.

Federal Aviation Administration 23 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Frequently Asked Questions Who will fund modifications to the airport environment (marking, signage, concrete)? –ARP, working with the sponsor, should be developing funding plans for the necessary modifications. However any extensive work requiring multi-year funding should be reported though the RAPT to the AOSC. Who will fund modifications to the airport environment (marking, signage, concrete)? –ARP, working with the sponsor, should be developing funding plans for the necessary modifications. However any extensive work requiring multi-year funding should be reported though the RAPT to the AOSC.

Federal Aviation Administration 24 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Frequently Asked Questions Can the implementation date be deferred? –Any requests for deferral will be considered at the AOSC executive steering group level). –Every effort needs to be made to meet the deadline and each RAPT should report implementation concerns as soon as possible. If an airport is not able to comply by 1/1/07, is it an option to increase the published minima to 250 feet and ¾ statute mile? –Yes, that is an option. Can the implementation date be deferred? –Any requests for deferral will be considered at the AOSC executive steering group level). –Every effort needs to be made to meet the deadline and each RAPT should report implementation concerns as soon as possible. If an airport is not able to comply by 1/1/07, is it an option to increase the published minima to 250 feet and ¾ statute mile? –Yes, that is an option.

Federal Aviation Administration 25 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Frequently Asked Questions Are vehicles allowed to penetrate the POFZ when the POFZ is active? –The POFZ should be protected from all obstacles. The only exception is a wing of a taxiing aircraft. This can be enforced by a hold sign on a road or other agreement with the airport operator Are vehicles allowed to penetrate the POFZ when the POFZ is active? –The POFZ should be protected from all obstacles. The only exception is a wing of a taxiing aircraft. This can be enforced by a hold sign on a road or other agreement with the airport operator

Federal Aviation Administration 26 Precision Obstacle Free Zone (POFZ) Implementation February 17, 2006 Additional Questions & Answers