Fourth Generation Light Source for UVA Blaine Norum Department of Physics 3 May, 2011 3 May 2011.

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

Slide 1 Light Source Research at Jefferson Lab George R. Neil and Gwyn P. Williams Associate Director, Jefferson Laboratory JSA Science Council January.
U.S. Department of Energy’s Office of Science Dr. Raymond Orbach February 25, 2003 Briefing for the Basic Energy Sciences Advisory Committee FY04 Budget.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
Slide 1 George R. Neil Associate Director Jefferson Lab Jefferson Avenue Newport News, Virginia VUV Program Directors Review Plans for a VUV.
Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
SURA Jefferson Laboratory Committee report J. L. Matthews, Chair Massachusetts Institute of Technology November 5, 2004.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
ILC DR RF Cavity – D. Li DR Workshop, KEK, Japan 1 Design for the DR RF cavities and impedance issues Derun Li Center for Beam Physics Lawrence Berkeley.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
DOE OFFICE OF SCIENCE ACCELERATOR STEWARDSHIP PROGRAM KEN OLSEN SPAFOA FRIB MEETING APRIL 3, 2013 (Includes slides prepared by Mark Zisman, DOE) IBT Workshop.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
BESAC Dec Outline of the Report I. A Confluence of Scientific Opportunities: Why Invest Now in Theory and Computation in the Basic Energy Sciences?
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
NSDL Collections Based on DOE User Facilities Christopher Klaus 10/05/03.
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science Basic Energy Sciences Advisory Committee Meeting FY 2009 Budget.
W.S. Graves DESY-Zeuthen 8/20031 Study for an xray laser at MIT Bates Laboratory William S. Graves MIT-Bates Presented at ICFA S2E workshop DESY-Zeuthen.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
SURA IT Committee & Regional CASA Meeting “SURAgrid Partnership” Sheraton Four Points 1201 K Street, NW Washington, DC March 7, 2006 Jerry P. Draayer SURA.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility CWL SURA.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
P. 1 basic research needs workshop for Carbon Capture: Beyond 2020 Plenary Closing Session March 5, Liquid Absorbents: panel members * Panel co-lead.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Brief Introduction to (VUV/)Soft X-ray FELs R. P. Walker Diamond Light Source, UK ICFA Workshop on Future Light Sources March 5 th -9 th, 2012 Thomas Jefferson.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
How Do We Control Material Processes at the Level of Electrons? Progress on Grand Challenge New Horizons for Grand Challenge Remaining ChallengeRefreshed.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Y. R. Roblin Hall A beamline and accelerator status.
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
ERL Status and Plans at Jefferson Lab Stephen V. Benson, On behalf of the Jefferson Lab FEL team Current status Next Generation Soft X-ray Sources JLab.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Slide 1/25 Gwyn P. Williams Free Electron Laser Jefferson Lab Jefferson Avenue Newport News, Virginia JSA Science Council January 7, 2011 Plans.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Image courtesy of Oak Ridge National Laboratory Eric R. Colby † Office of High Energy Physics Office of Science U. S. Department of Energy Office of Science-Led.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
1 NGLS Outline and Needs in Superconducting RF Materials Development John Corlett SRFMW, July 16, 2012 Office of Science.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
MSc-Student Activities at the European XFEL
Accelerator Layout and Parameters
Introduction to Jefferson Lab
LAL meeting on e+ studies, Oct. 2010
WBS 5.0 LCLS Strategic Projects Division
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
SOLID Collaboration Meeting
Presentation transcript:

Fourth Generation Light Source for UVA Blaine Norum Department of Physics 3 May, May 2011

Takeaway Messages 1) DOE has approved CD-0 (Mission Need) for NGLS at $1-1.5B based on strong science case. 2) Document is not yet released so we don’t know if it is site specific to LBNL (very unlikely, but who knows). No firm schedule or funding identified yet. 3) JLab will have the largest WBS element, a 2.5 GeV superconducting linac and maybe cryogenics and FEL physics (regardless of site). 4) Virginia has potential to compete for this but it would require a major effort ($3M) over next 3 years to mount realistic challenge to LBNL. 5) We need: Strong regional political support, commitment to build significant user base at universities, donation of site, well-vetted system design 3 May 2011

DOE BES Science Grand Challenges Directing Matter and Energy; 5 Challenges for Science & the Imagination 1. How do we control materials processes at the level of the electrons? Pump-probe time dependent dynamics 2. How do we design and perfect atom- and energy-efficient synthesis of new forms of matter with tailored properties? PLD, photo-chemistry, XRS 3. How do remarkable properties of matter emerge from the complex correlations of atomic and electronic constituents and how can we control these properties? Pump-probe time dependent dynamics, XRS 4. How can we master energy and information on the nanoscale to create new technologies with capabilities rivaling those of living things? Pump-probe time dependent dynamics, XRS 5. How do we characterize and control matter away -- especially very far away -- from equilibrium? Non-linear dynamics, ultra-bright sources 3 May 2011

Scientific Community Support 3 May 2011

On-going Research & Development United States – LBNL, Cornell, Wisconsin, BNL, JLAB UK – Daresbury Japan – KEK Germany – DESY 3 May 2011

Next Generation Light Source (NGLS) – a new class of X-ray laser Array of (ultimately 10) configurable FEL beamlines 100 kHz CW pulse rate Capability of one FEL having MHz rate Independent control Each FEL configured for experimental requirements Beam transport and switching ~2 GeV CW superconducting linac Laser systems, timing & synchronization Low-emittance, MHz bunch rate photo-gun ≤ 1 nC ≤1 mm-mrad Injector Laser heater Bunch compressor Upgrade potential

Current Status CD-0 “Mission Need” has been approved CD-0 not site-specific but LBNL expects it Independent cost review has been performed: $1 – $1.5B JLAB will lead design, development, prototyping of accelerator and related devices 3 May 2011

Scope of Project Construction Budget B$ Ops Budget - ~15% of CB ~ M$/yr Personnel ~ Users ~ at any time Footprint ~ 100 acres, ~70 flat for machine Expansion ~ acres would be attractive 3 May 2011

Historical context In ’80’s, MIT (Bates) center of electronuclear physics, expected next generation facility – JLAB (VA) In ’90’s, MIT (FBML) center of high magnetic field research, expected next generation facility – FSU In ’00’s, Argonne (ATLAS) center of heavy ion research, expected next generation facility - MSU 3 May 2011

Our strengths Construction: 1.labor costs 2/3 of Bay area 2.Geology & geography advantageous 3.Proximity to JLAB Operations: 1.Labor costs 20% lower → M$/yr 2.Electricity ½ Bay area → M$/yr 3.Charlottesville/Albemarle attractive and affordable 3 May 2011

Our Strengths (cont.) Political 1.No light sources in Southeast; 4 in Bay area 3 May 2011

Our Strengths (cont.) 2.Virginia not bankrupt – state supported and continues to support JLAB; can be expected to support NGLS. Michigan state support crucial to MSU getting the 500 M$ Facility for Rare Isotope Beams 3 May 2011

LBNL Strengths R & D underway at 2-3 M$/yr Center of activity Already a DOE funded laboratory UC Berkeley has strong record The same strengths MIT had! 3 May 2011

Path Forward Strong commitment from UVA - ~3 M$ over roughly three years – ~ 1 M$ for JLAB site specific R&D – ~ 1 M$ for workshops, travel, consultants, etc. – ~ 1 M$ to hire 2 mid-career prominent X-ray users * Site including inducements * Faculty positions connected to facility * Only required if facility at UVA 3 May 2011

Constraints JLAB support absolutely required Anxious to collaborate but operated by JSA (SURA & CSC) → must support any SURA sponsored proposal; Virginia proposal has edge due to continued state support of JLAB VTech “interested”; C. Steger chairs SURA CoP 3 May 2011

Strategy Timely commitment to project Garner local then state support Present comprehensive proposal to SURA Prepare for a very intense few years! 3 May 2011

Conclusions Tremendous opportunity for UVA, Charlottesville/Albemarle, Virginia – UVA will be major international research center – C/A will have new jobs in clean industry – Virginia will enhance reputation as dynamic Return on investment significant if successful Risks nontrivial but managable 3 May 2011