Capacity Planning Production Planning and Control.

Slides:



Advertisements
Similar presentations
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Advertisements

CAPACITY PLANNING FOR PRODUCTS AND SERVICES.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Capacity Planning For Products and Services
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
Facility Planning: Capacity. Capacity Planning Interrelated facility planning decisions: 1.Number of facilities and general type 2.Capacity 3.Locations.
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Strategic Capacity Planning for Products and Services
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Management Decision Making Management Decision Making Supplement – Break Even Analysis.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Operations Management Capacity Planning Supplement 7
Chapter 20 Cost-Volume-Profit Analysis and Variable Costing
Operations Management Capacity Planning Supplement 7
Operations Management
For Products and Services
Learning Modules Introduction to POM Chapters, 1, 2, & 3
Operations Management
Operations Management
W8 8.3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Operations Management © Ana G. Méndez University System, All rights.
Process Selection and Capacity Planning
Lecture 12 Capacity Management and Planning (continued) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Capacity and Constraint Management
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Capacity Planning © 2006 Prentice Hall, Inc.
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
7 Capacity Planning PowerPoint presentation to accompany
Copyright ©2016 Cengage Learning. All Rights Reserved
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
© 2006 Prentice Hall, Inc.S7 – 1 Capacity Planning © 2006 Prentice Hall, Inc.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
Capacity Planning Pertemuan 04
Chapter 7s Class 2.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Suppl Capacity Planning Heizer and Render Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl.
Operations Management Capacity Design
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Technique for evaluating process and equipment alternatives  Objective.
Chapter 5 Lecture 8 Capacity Planning FOR Products and Services.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1 Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
For Products and Services
7 3 Capacity Planning PowerPoint presentation to accompany
Capacity and Constraint Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operations Management
Operations Management Capacity Design
Stevenson 5 Capacity Planning.
Operations Management
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Capacity Planning Production Planning and Control

Capacity  The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time  Determines fixed costs  Determines if demand will be satisfied  Used to plan overtime horizon

Modify capacity Use capacity Planning Over a Time Horizon Intermediate- range planning SubcontractAdd personnel Add equipmentBuild or use inventory Add shifts Short-range planning Schedule jobs Schedule personnel Allocate machinery * Long-range planning Add facilities Add long lead time equipment *

Design and Effective Capacity  Design capacity is the maximum theoretical output of a system  Normally expressed as a rate  Effective capacity is the capacity a firm expects to achieve given current operating constraints  Often lower than design capacity

Utilization and Efficiency Utilization is the percent of design capacity achieved Efficiency is the percent of effective capacity achieved Utilization = Actual Output/Design Capacity Efficiency = Actual Output/Effective Capacity

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, 8 hours, 3 shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, 8 hours, 3 shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, 8 hours, 3 shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, 8 hours, 3 shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, 8 hours, 3 shifts Efficiency = 84.6% Efficiency of new line = 75% Expected Output = (Effective Capacity)(Efficiency) = (175,000)(.75) = 131,250 rolls

Capacity and Strategy  Capacity decisions impact all 10 decisions of operations management as well as other functional areas of the organization  Capacity decisions must be integrated into the organization’s mission and strategy

Managing Demand  Demand exceeds capacity  Limit demand by raising prices, scheduling longer lead time  Long term solution is to increase capacity  Capacity exceeds demand  Stimulate market  Product changes  Adjusting to seasonal demands  Produce products with complimentary demand patterns

Economies and Diseconomies of Scale Economies of scale Diseconomies of scale 25 - Room Roadside Motel 50 - Room Roadside Motel 75 - Room Roadside Motel Number of Rooms Average unit cost (dollars per room per night)

Capacity Considerations  Forecast demand accurately  Understanding the technology and capacity increments  Find the optimal operating level (volume)  Build for change

Tactics for Matching Capacity to Demand 1.Making staffing changes 2.Adjusting equipment and processes  Purchasing additional machinery  Selling or leasing out existing equipment 3.Improving methods to increase throughput 4.Redesigning the product to facilitate more throughput

Complementary Demand Patterns 4,000 4,000 – 3,000 3,000 – 2,000 2,000 – 1,000 1,000 – J F M A M J J A S O N D J F M A M J J A S O N D J Sales in units Time (months) By combining both, the variation is reduced Snowmobile sales Jet ski sales

Approaches to Capacity Expansion (a)Leading demand with incremental expansion Demand Expected demand New capacity (b)Leading demand with one-step expansion Demand New capacity Expected demand (d)Attempts to have an average capacity with incremental expansion Demand New capacity Expected demand (c)Capacity lags demand with incremental expansion Demand New capacity Expected demand

Break-Even Analysis  Technique for evaluating process and equipment alternatives  Objective is to find the point in dollars and units at which cost equals revenue  Requires estimation of fixed costs, variable costs, and revenue

Break-Even Analysis  Fixed costs are costs that continue even if no units are produced  Depreciation, taxes, debt, mortgage payments  Variable costs are costs that vary with the volume of units produced  Labor, materials, portion of utilities  Contribution is the difference between selling price and variable cost

Break-Even Analysis  Costs and revenue are linear functions  Generally not the case in the real world  We actually know these costs  Very difficult to accomplish  There is no time value of money Assumptions

Profit corridor Loss corridor Break-Even Analysis Total revenue line Total cost line Variable cost Fixed cost Break-even point Total cost = Total revenue – – – – – – – – – – – |||||||||||| Cost in dollars Volume (units per period)

Break-Even Analysis BEP x =Break-even point in units BEP $ =Break-even point in dollars P=Price per unit (after all discounts) x=Number of units produced TR=Total revenue = Px F=Fixed costs V=Variable costs TC=Total costs = F + Vx TR = TC or Px = F + Vx Break-even point occurs when BEP x = F P - V

Break-Even Analysis BEP x =Break-even point in units BEP $ =Break-even point in dollars P=Price per unit (after all discounts) x=Number of units produced TR=Total revenue = Px F=Fixed costs V=Variable costs TC=Total costs = F + Vx BEP $ = BEP x P = P ==F (P - V)/P F P - V F 1 - V/P Profit= TR - TC = Px - (F + Vx) = Px - F - Vx = (P - V)x - F

Break-Even Example Fixed costs = $10,000 Material = $.75/unit Direct labor = $1.50/unit Selling price = $4.00 per unit BEP $ = = F 1 - (V/P) $10, [( )/(4.00)]

Break-Even Example Fixed costs = $10,000 Material = $.75/unit Direct labor = $1.50/unit Selling price = $4.00 per unit BEP $ = = F 1 - (V/P) $10, [( )/(4.00)] = = $22, $10, BEP x = = = 5,714 F P - V $10, ( )

Break-Even Example 50,000 50,000 – 40,000 40,000 – 30,000 30,000 – 20,000 20,000 – 10,000 10,000 – – |||||| 02,0004,0006,0008,00010,000 Dollars Units Fixed costs Total costs Revenue Break-even point

Break-Even Example BEP $ = F ∑ 1 - x (W i ) ViViPiPiViViPiPi Multiproduct Case whereV= variable cost per unit P= price per unit F= fixed costs W= percent each product is of total dollar sales i= each product

Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$2.95$1.257,000 Soft drink ,000 Baked potato ,000 Tea ,000 Salad bar ,000 Fixed costs = $3,500 per month

Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$2.95$1.257,000 Soft drink ,000 Baked potato ,000 Tea ,000 Salad bar ,000 Sandwich$2.95$ $20, Soft drink , Baked , potato Tea , Salad bar , $46, AnnualWeighted SellingVariableForecasted% ofContribution Item (i)Price (P)Cost (V)(V/P)1 - (V/P)Sales $Sales(col 5 x col 7) Fixed costs = $3,500 per month

Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$2.95$1.257,000 Soft drink ,000 Baked potato ,000 Tea ,000 Salad bar ,000 Fixed costs = $3,500 per month Sandwich$2.95$ $20, Soft drink , Baked , potato Tea , Salad bar , $46, AnnualWeighted SellingVariableForecasted% ofContribution Item (i)Price (P)Cost (V)(V/P)1 - (V/P)Sales $Sales(col 5 x col 7) BEP $ = F ∑ 1 - x (W i ) ViPiViPi = = $67,200 $3,500 x Daily sales = = $ $67, days.446 x $ $2.95 = 32.6  33 sandwiches per day

Decision Trees and Capacity Decision -$14,000 $13,000$18,000 -$90,000 Market unfavorable (.6) Market favorable (.4) $100,000 Large plant Market favorable (.4) Market unfavorable (.6) $60,000 -$10,000 Medium plant Market favorable (.4) Market unfavorable (.6) $40,000 -$5,000 Small plant $0 Do nothing

Strategy-Driven Investment  Operations may be responsible for return-on-investment (ROI)  Analyzing capacity alternatives should include capital investment, variable cost, cash flows, and net present value

Net Present Value (NPV) whereF= future value P= present value i= interest rate N= number of years P = F (1 + i) N

NPV Using Factors P = = FX F (1 + i) N whereX=a factor from Table S7.1 defined as = 1/(1 + i) N and F = future value Year5%6%7%…10% Portion of Table S7.1

Present Value of an Annuity An annuity is an investment which generates uniform equal payments S = RX whereX=factor from Table S7.2 S=present value of a series of uniform annual receipts R=receipts that are received every year of the life of the investment

Present Value of an Annuity Portion of Table S7.2 Year5%6%7%…10%

Questions?