May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
SSIART – Smart Sensor Inter-Agency Reference Test bench Activity Presentation October 2010 Jean-François Dufour ESA/ESTEC/TEC-EDD.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
April-2009CCSDS SOIS Wireless WG 1 Magenta Book Strategies for Success Kevin Gifford, NASA/UC-Boulder Patrick Fink, NASA JSC.
30-Oct-2009CCSDS SOIS Wireless WG Meeting Summary 1 CCSDS SOIS Wireless WG Fall 2009 Meeting Summary ESTEC.
SOIS Plenary Session Spring 2015 Meeting Chris Taylor ESA.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS SOIS Wireless Working Group (WWG) 16-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 16-Sep Sep-2015.
ESA UNCLASSIFIED – For Official Use CCSDS SOIS Overview - Fall 2015 Martin Suess 07/10/2015.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Discussion Outline 1.RFID Tag-Encoding Blue Book updates to respond to CESG RIDs A.KKG observations and suggestions re: Peter Shames, SANA registries i.ISS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Brainstorming for Future WWG Activities 1.High data rate wireless Blue Book (Start 2012) –PHY and MAC, star topology; we offer a set of recommendations.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
CCSDS SOIS WWG – Spring 2011 – Berlin Presentation of the Agency’s activities on wireless technologies Jean-Francois Dufour
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Wireless WG Monthly Teleconference
The CCSDS Security WG is chartered to:
Fall 2009 Meeting Summary ESTEC
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
CCSDS Systems Engineering Area: Security Working Group
Brainstorming for Future WWG Activities
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Liaison Consultative Committee on Space Data Systems
Presentation transcript:

May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on the second recommended practice of the low data-rate wireless communications Magenta book Further define the technical architecture and the cooperation and administrative framework of the shared test bench for smart sensors Working Group Status RFID-Based Inventory Management Systems Magenta Book submitted to editing review, to be followed by first Agency review. The WG to evaluate the need to define the RFID encoding (tag content), which requires additional expertise (currently under investigation). Low data-rate wireless communications for spacecraft monitoring and control Magenta book to be completed (two use-cases) during the summer and submitted to CCSDS before the Fall meeting Discussions took place about organizing a workshop on wireless technologies to be held in the North America in 2012 The WWG agreed in nominating Jean-François Dufour (ESA/ESTEC) as group chairman in replacement of Patrick Plancke (ESA/ESTEC) now retired. Working Group Summary Situation

May11-cesg-2 SOIS Area Report WG status Consensus achieved on all open issues Contention-based access when the spectrum environment is controlled, low overhead needed and l - IEEE Scheduled-access for use when deterministic behaviours and higher interference tolerance is needed - ISA100.11a (International Society of Automation) -- (potential patent issue under investigation) Remaining tasks Identified and assignments made to team members Book is to be completed and reviewed at SOIS-level before the end of the summer prior to submission for CESG review Wireless WG “Low data-rate wireless communications for spacecraft monitoring and control” (This magenta books identifies a number of use cases for the application of wireless technology, ranging from AIT to onboard sensor networks and recommends commercial wireless standards)

May11-cesg-3 Wireless WG Low data-rate wireless communications for spacecraft monitoring and control (cont) To assist in the joint evaluation of potential technology and commercial devices, the group continued the work on the definition/exploration of a “Smart Sensor Inter-Agency Reference Testbench (SSIART)” This is an effort to coordinate the work in wireless networking projects of each agency and to leverage on that work to simplify the overall testing efforts and technically prepare future updates (e.g. new use-cases) of the MB Intended as a controlled test environment with associated test procedures for assessment of wireless technologies and engineering metrics for wireless spacecraft communications, including common hardware and software Need to investigate proper channels and procedures for interagency (ESA/NASA/CSSAR/CSA) collaboration (e.g. potentially ITAR issues)

May11-cesg-4 1.ASWG –architecture updated and consolidated to cover NASA, AFRL and ESA avionics, three books under final publication process 2.Wireless WG – Low data-rate wireless communications for spacecraft monitoring and control Magenta book under final update, major step forward on defining the inter-agency test bench 3.SDR SIG – completed initial discussion, agreed to continue interaction with Agency experts to arrive at final conclusion E. SUMMARY: MAJOR ACCOMPLISHMENTS, S’11 MEETING SOIS Area Report