Group 18: Alejandro Castro Sam Leuthold Andrew Borger GE Sponsor: Todd Hopwood Faculty Advisor: Dr. Van Sciver.

Slides:



Advertisements
Similar presentations
Water Penetration Testing Device
Advertisements

Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
Team Dow Electronic Materials Nicholas Bishop, Jessica Harrington, Rachael Lutchmedial, Alexander Stachnik, Anthony Vacaro. Overview Background Information.
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood 1.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1.
Team FlexGrade.  There is a potential market for the use of small diameter logs as integral parts of a structure.  Current grading techniques are conservative.
Team Members: Jason Fitch David Gardner Lisa Huffman Zach Sielaff Sponsor: Dr. Tom Hess Design Review: 11/13/09 Reed Forming Machine 1 Advisor: Dr. Jay.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
Noise Reduction in Over-molded HVAC Module Doors Industrial Sponsor: Goal: Create a component and or system design that will eliminate any acoustic signal.
Improved Thermal Transport for Helical Brake System Group Members: Jim Cloer Matt Evonuk Arek Gazdowicz Dirk Tarman Industry Sponsor Braking Technologies.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Team Dade Behring Mechanical Modifications to a Vibratory Tablet Feeder Prepared by: Craig Livingston Andrew Snodgrass Jordan Weinstein Aaron Winn.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
Ergonomic Housing improvements to Personal Smoke Monitoring Device Team: Evan Wozniak Sarah Kostuk Christina Smith Aaron Prahst Multidisciplinary Senior.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
P14311: PCB Isolation Routing System Final Presentation Team Members: Matthew Clark, Marley Collier Sears, Sarah Duman, Richard Kalb, Joseph Post, Zoe.
Chapter 7 An Introduction to Power. Objectives Identify the difference between work and power. Define horse power (hp). Recognize various power components.
For Cardinal Newman Hall Randall Lessard ET Fall 2013 Dr. Cris Koutsougeras Advisors: Dr. Rana Mitra Mr. Byron Patterson.
MEMD 261 Computer Aided Design (CAD) Introduction to CAD
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
Group 17 Oceanic Thermal Energy Conversion Model - Lockheed Martin 1 Oceanic Thermal Energy Conversions Group Members: Brooks Collins Kirby Little Chris.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
Problem Definition Review Reciprocating Friction Tester.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Volcanic Lake ROV Capstone 2012 Presenter: Stephen Phan Team Members: Christina Yugay Duc Nguyen Giang Le Son Nguyen Chinh Vu Faculty Advisor: Dr. Faryar.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Problem Statement Automotive and heavy equipment applications use sensors on machines to report temperatures, pressures, speeds, etc. to a central embedded.
WCMS Report Web Advisory Committee April Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Group 18: Alejandro Castro Sam Leuthold Andrew Borger 1 GE Sponsor: Todd Hopwood Faculty Advisor: Dr. Van Sciver.
MSD P13453 Final Project Review Sean Deshaies (ME) Erin Sullivan (EE) Michael Gorevski (EE) Brandon Niescier (ME)
Improving Performance of a Heavy Duty Engine Cooling Drive Through Reduction of Drag Losses Design Recommendations & Future Analysis CFD Analysis It is.
Faculty Coach: Professor Martinez  Justin Mahar  Chris Baum  Greg Schmitz  Adam Abdelhamed.
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
P16452 Active Reciprocating Compressor Valve Assembly Team: Negar Salehi, Bob Osborn, Ian Nanney, Keith Leung, Chris Reynolds.
Jar Opener Redesign Team 04F Sponsor: R.I.T. ME Dept. Advisor: Dr. Walter Sean Doherty Frank Novak Mike Salvaterra.
CNC Assembly: 3 axis rigid PVC structure NEMA 17 Motors and lead screws Off the shelf Router and Specialty collet Vacuum Table to hold down work piece.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
MRO Dry Gas Seal Reliability Improvement
3/16/2016 Vanderbilt Motorsports Intake and Exhaust Project 1 Vanderbilt Motorsports Intake/Exhaust Team January 17, 2008 Presentation Kristina Kitko Mark.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
P16452 Active Reciprocating Compressor Valve Assembly System Review.
Advisor: Dr. Shangchao Lin
Turbo Installation Manipulator Final Design Review
Advisor: Dr. Shangchao Lin
Prototyping and Testing of an Economizer in a Gas Cycled Chiller System Team 4 Members: Steven Hutto Breck Dorsey Kenneth Martin Brandon Van Guoxin.
Right Angle Screwdriver
Robert Karas and Frank McCloskey
Valve Manifold Assembly/Disassembly
MEMD 261 Computer Aided Design (CAD) Introduction to CAD
Active Reciprocating Compressor Valve Assembly P16452
INFORMATION SYSTEMS PLAN
Tablesat iid Kavin Kang, Matthew Coronis,
Automated Screw Organization System
Quality Improvement Mid-Point Progress Update 18 October 2018
Anti-Tip Bar for manual wheelchair
Presentation transcript:

Group 18: Alejandro Castro Sam Leuthold Andrew Borger GE Sponsor: Todd Hopwood Faculty Advisor: Dr. Van Sciver

Overview Application Problem Statement Project Scope Final Design(Initial) Problems Encountered Final Design Current Progress Testing Potential Issues Modified Future Scope Summary 2

Application 3

Current Valves Valve Stop Valve Shutter Valve Seat Valve Springs Plate ValvesPoppet Valves 4

Problem Statement Reciprocating compressors move large volumes of natural gas Current compressor valves are reliable but inefficient Inefficiencies caused from indirect flow path Project Goal: Obtain direct flow with a rotational type valve 5

Project Scope Must operate in a rotational manner and obtain direct flow Operate at pressures between 30 psi and 600 psi Materials must be able to withstand temperatures approaching 350F Modifiable to fit all current gas compressors used by G.E. Is to be easily replaced $2000 budget 6

Final Design(initial) 7 Gas Flow

Problems Encountered Machining of the threads on the outer housing would have been overly complicated A separate threaded insert needed to be designed Thickness of back plate needed to be minimized to be easily milled Prototype materials have been changed from production materials due to cost 8

Final Design(Modified) 9 Gas Flow

Current Progress(update) Final design changes have been made for ease of machining Valve machining in progress Materials for test rig in process of being ordered: $ Materials for flow visualization have been ordered: $

Test Rig 11 ≈ 50 psi

Test Rig 12 ≈ 50 psi

Wind-Tunnel Smoke Wire Test A simplified acrylic model will allow flow visualization through entire valve 13

Potential Issues Valve does not completely open Test conditions are not the same as operating conditions Thread and/or pin binding Machining tolerances 14

Future Scope Machining in progress Parts for test rig being ordered Testing will follow for the remainder of the semester During testing valve performance will be optimized Collaboration with team 19 not likely 15

Summary 3-D prototype already implemented Design slightly changed for machining purposes Machining in progress Parts for test rig currently being ordered Total Budget: $2000 Total spent: $ Project is running slightly behind accepted schedule due to machining difficulties 16

Questions 17

Bill of Materials 18

Original Test Rig Design 19

Calculations 20