WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Similar presentations


Presentation on theme: "WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements."— Presentation transcript:

1 WCMS Report Web Advisory Committee April 2010

2 Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements –In Phase 1 and Phase 2 to develop Uwaterloo Main site;

3 Schedule April Meeting w/ other universities using Drupal Obtaining additional Drupal knowledge via conference Developing rapid prototypes to learn about Drupal

4 Schedule May Define and implement hardware (system architecture) to run Drupal Finalize web design functional requirements specifications (with Redesign Team)

5 Schedule May Define the scope for –Pilot website 1 - Phase 1 (Housing) –Pilot website 2 - Phase 1 (Web resources) –Pilot website 3 - Phase 1 (UWaterloo main) Perform thorough review of CMS requirements

6 Schedule June – September Define Drupal configuration Develop Pilot website 1 (Housing) - Phase 1

7 Schedule September 2010 Develop Pilot website 2 (Web resources) - Phase 1

8 Schedule October 2010 Develop Pilot website 3 (UWaterloo main) - Phase 1

9 Schedule November 2010 Develop Pilot website 3 (UWaterloo main) - Phase 2

10 Schedule December 2010 Develop Pilot website 1 (Housing) - Phase 2

11 Schedule January 2010 Develop Pilot website 2 (Web resources) - Phase 2

12 Notes Web Resources site chosen as pilot b/c site will provide CMS and Design Resources for the project

13 Notes Housing chosen as pilot b/c of staff on the team and b/c well-defined existing website with manageable scope

14 Notes Starting with Housing, then Web Resources and UW Main in Phase 1 Reversing the order in Phase 2 Pilot because of time pressures to get site out

15 Notes Faculty rollout and other-sites rollout TBD –phased faculty rollout expected; –sometime after January 2011;