“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.

Slides:



Advertisements
Similar presentations
Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
NEC Network Emergency Exercise - Exercise Prelude.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
UNC Modification 0050 – Storage Monitor Adjustment.
“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
Transmission Workstream 7th Dec 2006 Chris Logue
UNC Modification Proposal 0202 National Grid Distribution
Transmission Workgroup 7th July 2011
SO Incentives from April 2010
Consideration of issues raised by UNC Modification Proposal 0244
Review Group 0175: DM Supply Point Emergency Arrangements
UNC Transmission Workstream 15th June 2005
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Information Provision for Transitional Exit Capacity
DN Interruption Phase II
Proposed Changes to UNC Section Q Emergencies - Mod 035
Transmission Workstream 05 November 2009
Annual Quantity (AQ) 45.
Presentation transcript:

“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris Logue

Background  Discussed the potential new approach to procurement of Safety Monitor gas at the December 2006 Transmission Workstream  Draft Code Modification Proposal has been produced and circulated  A Code Modification Proposal will be submitted to the UNC Panel on the 18 th January with a request that the Proposal proceeds to consultation

Concept  Safety Monitors ensure that sufficient gas is held in storage to support those gas consumers whose premises cannot be physically and verifiably isolated from the gas network in the event of a 1 in 50 winter.  To achieve this all gas consumers are categorised into one of two groups:  Protected by Monitor – Gas is held in storage to facilitate continuity of supply and safe control to these consumers in a 1 in 50 winter  Protected by Isolation – Safety is ensured by physically isolating these consumers from the networks

End consumer categorisation  Sites which can be safely isolated from the network  NTS Interruptibles  LDZ Interruptibles  NTS Power Firm  NTS Industrial Firm  DM (excluding priority customers)  Sites which require protection under the safety monitor  Priority Firm DM  Ireland Firm  All NDM

Proposed New Approach  Each User to have a new UNC obligation to secure its proportion of the total protected by monitor market  The total volume of gas to be secured by all relevant Users will be equal to the Stored Safety Gas Requirement in each Storage Facility Type  This obligation may be met either through direct arrangements with Storage Operators or through a contract(s) with a third party  This new shipper obligation will replace 071A compensation arrangements – no future requirement for compensation in the event of storage curtailment  Shippers will be required to warrant that they have secured and will hold sufficient gas to meet their individual Stored Safety Gas Requirements  The gas secured must be held until the Safety Monitor declines or is removed or the gas is allowed to flow as directed by the NEC

Annual Process  31 st May – Provide initial view on Stored Safety Gas Requirement  31 st May – Notify each shipper of their indicative Individual Stored Safety Gas Requirement based on their portfolio position on 1 st May  1 st September – Take shipper portfolio snapshot  1 st October – Publish Safety Monitor levels  1 st October – Notify each shipper of individual Stored Safety Gas Requirements for each storage type  31 st October – Shippers warrant that they have secured sufficient gas in storage to meet their obligations

Annual Process  It is not envisaged shipper portfolio changes within the winter will be material enough to merit altering individual Stored Safety Gas Requirements  Maximum portfolio change during winter 05/06 was around 2% of total protected by monitor market  If the Safety Monitor is amended during the winter, individual Stored Safety Gas Requirements will be amended accordingly and notified to shippers  Shippers will be required to warrant they have secured the amended quantity of gas as soon as practicable

To Calculate Stored Safety Gas Requirement  Total Stored Safety Gas Requirement split into 4 bands:  Domestic loads with AQ<73,200 kWh  I&C NDM loads with AQ<58,600,000 kWh  Firm loads supplied by the Irish Interconnector  Priority Firm DM loads  Total AQ* for each band used to give a ‘weighting’: AQ<73,200 kWh63.3% AQ<58,600,000 kWh23.4% Firm Irish13.1% Priority Firm DM0.2%  Weightings applied to Safety Monitor in each storage type and individual shipper Stored Safety Gas Requirements are calculated from this based on individual shipper AQ totals within each load band. *AQ information provided by xoserve. Weightings would be expected to change year on year.

Potential Advantages  Targets the requirement to hold stored gas at those that will be supplying the gas in a severe winter.  Removes requirement for a complex and “imperfect” compensation regime  Takes reserved gas out of the supply chain (unless a 1 in 50 winter occurs) and therefore increases the value of contracted demand response – therefore reducing risk of NGSE  Ensures all shippers comply to minimum security of supply standards that are proportionate to their individual portfolios and market share  Better aligns UNC to the domestic security of supply provisions contained in the gas suppliers licence  Incentivises additional supplies - therefore reducing risk of NGSE  Helps PBM to quantify storage requirements in a timely manner ahead of winter period