STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.

Slides:



Advertisements
Similar presentations
Session 3 Outline What is a Illicit Storm Water Discharge? - Potential Sources What is required by the permit? What should I have in place prior to getting.
Advertisements

SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Metropolitan Council Environmental Services A Clean Water Agency Info Item: Waste Discharge Rules Presented to the Environment Committee September 14,
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
MERCURY REQUEST FOR EFFLUENT DATA. MERCURY - BACKGROUND STATEWIDE CAMPAIGN TO ELIMINATE THE USE AND RELEASE OF HUMAN- CAUSED MERCURY IN WASHINGTON STATE.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
1 What is a Multijurisdictional Agreement? By Scott Mallery, P.E. Pretreatment Engineer September 2007 State of Washington Department of Ecology Water.
Combined Sewer Overflow (CSO) Management Audience –Policy Makers and General public Role played Consultant Engineers.
Fox Valley OperatorsAssociationCMOM Capacity Management Capacity ManagementOperationMaintenance January 2011 C apacity M anagement O peration & M aintenance.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
Presented by Fred Barker, P.E., MassDEP Boston Massachusetts Department of Environmental Protection Drinking.
Integrated Approach Planning - Ecology’s Perspectives Spokane River Forum Conference Spokane, WA March 26, 2013.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Spokane River Forum 23 May 2011
Command and Control Regulation in Action Regulating Industrial Water Pollution in the US.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Implementation of Antidegradation Policies for Indiana Waters.
National Pollutant Discharge Elimination System(NPDES) Permit.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
Energy, Utilities, and Telecommunication Summer Study Committee Meeting September 2, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Pretreatment 101 Training Course Sponsored by U.S. Environmental Protection Agency, States of Region 6 And the Region VI Pretreatment Association.
VI. Developing a VSMP Program General Stormwater Training Workshop.
TCEQ Environmental Trade Fair
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA
Planning schemes Statutory documents under s.20(2) of LUPAA –outline policies and objectives –regulate or prohibit use or development of land –reserve.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
What’s This HWA Design Thing All About??? Design Capacity HWA Info from one POTW CITY OF GREENSBORO North Buffalo POTW.
Produced Water Treatment For Recycle 22 nd IPEC – Denver, CO Dan Mueller, P.E.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Bacteria Rulemaking Inclusion of Bacteria Limits in TPDES Permits.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011.
Public Information Meeting Wastewater Treatment January 26, 2016.
1 Water Quality Antidegradation: Guidance to Implement Tier II Summary of Discussion: Review the Tier II Rule requirements. Clarify what feedback we are.
Proposition 50 Chapter 8 Integrated Regional Water Management Grant Program Round 2 Guidelines and PSP Packages Public Meetings Sacramento – May 21, 2007.
Connie Brower NC DENR Division of Water Resources.
Administration Code Changes to Incorporate Graywater Policy Principles Jayne Joy, P.E. Director, Environmental & Regulatory Compliance January 2016 EASTERN.
Pollution Prevention & Management DentalBMPs. Overview Amalgam in POTW New EPA Guidelines City of Tulsa Dental BMPs.
FUTURE REQUIREMENTS AND GOALS
Update on PI Modeling and Nitrogen Removal at Blue Plains
David Kurz, P.E. Lead Wastewater Engineer
The Nuts & Bolts of TBLL Development
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Finance Options: Funding Water Infrastructure Projects George Bryan South Carolina Department of Health and Environmental Control State Revolving Fund.
Stormwater Control Transfer Program Overview January 31, 2018
National Environmental Policy Act of 1969
Westcas position paper
Wastewater Permitting Updates
Multi-Sector General Permit: MSGP
Indiana Department of Environmental Management Office of Water Quality
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Presentation transcript:

STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005

Outline for Presentation Definition Definition Status of EPA’s Policy Status of EPA’s Policy EPA’s Draft Guidance Policy EPA’s Draft Guidance Policy Flow Blending Issues & Concerns Flow Blending Issues & Concerns Possible Elements of Ecology’s Draft Policy Possible Elements of Ecology’s Draft Policy Interim Process Interim Process Q & A Q & A

Definition The intentional bypass of wastewater around secondary treatment units during peak flow conditions. The intentional bypass of wastewater around secondary treatment units during peak flow conditions. Bypass flows receive primary treatment and blended with flow receiving full secondary treatment. Total flow receives disinfection prior to discharge. Bypass flows receive primary treatment and blended with flow receiving full secondary treatment. Total flow receives disinfection prior to discharge.

Typical Bypass Process Flow Schematic Preliminary Treatment Primary Treatment Secondary Treatment Disinfection Bypass Blended Flow Influent Outfall

Status of EPA’s Flow Blending Policy EPA Draft Policy issued for comment on December 2003 EPA Draft Policy issued for comment on December 2003 Ecology provided comments to EPA in January 2004 Ecology provided comments to EPA in January 2004 EPA has yet to adopt their final policy EPA has yet to adopt their final policy In anticipation of EPA’s Policy, Ecology formed a work group to develop a state policy. Ecology will wait till EPA issues federal policy before the State will issue its policy In anticipation of EPA’s Policy, Ecology formed a work group to develop a state policy. Ecology will wait till EPA issues federal policy before the State will issue its policy

EPA’s Draft Guidance ( December 2003) Blending permissible if final effluent meets all concentration and % removal secondary standards and water quality standards are not violated. Blending permissible if final effluent meets all concentration and % removal secondary standards and water quality standards are not violated. Policy applies to CSO and SSO systems Policy applies to CSO and SSO systems “Treatment scheme, including designed capacity of various units, should be consistent with generally accepted practices and long-term design criteria…” “Treatment scheme, including designed capacity of various units, should be consistent with generally accepted practices and long-term design criteria…” Proper O&M of collection system Proper O&M of collection system

Ecology’s Historical Perspective Secondary Treatment for Max. Month/ Max. Week Design Flow – no bypasses! Secondary Treatment for Max. Month/ Max. Week Design Flow – no bypasses! Exceptions – Combined Sewer Systems (40 CFR 133) Exceptions – Combined Sewer Systems (40 CFR 133) Precedents – Combined Systems (KC WP & Bellingham) and Separated Systems (KC South Plant, Tacoma, Enumclaw) Precedents – Combined Systems (KC WP & Bellingham) and Separated Systems (KC South Plant, Tacoma, Enumclaw)

Ecology’s Issues & Concerns with EPA’s Draft Policy Severely reduces the incentives for public entities to maintain their collection systems Severely reduces the incentives for public entities to maintain their collection systems - Exacerbate collection systems problems - Increase in the amount of flow that is bypassed at POTWs - Doesn’t recognize responsible investment and hard work to remove I/I in order to not flow blend Allows for frequent bypassing during the wet weather season Allows for frequent bypassing during the wet weather season Backsliding Backsliding

Ecology’s Issues & Concerns with EPA’s Draft Policy (cont’d) “Generally accepted design practices” “Generally accepted design practices” - Prevent bypasses, Full Secondary treatment Design Flow Capacity Design Flow Capacity - Mass Based Permit limits - Trigger Dates for Expansion - Funding Eligibility Other States and EPA Regions have concerns Other States and EPA Regions have concerns

Possible Elements of Ecology’s Draft Policy Applies to municipal POTWs only, CSOs are not regulated under policy Applies to municipal POTWs only, CSOs are not regulated under policy Industrial WWTPs are not allowed to blend Industrial WWTPs are not allowed to blend Discourage Blending Discourage Blending I/I Analysis required I/I Analysis required Consideration of Non-Blending options Consideration of Non-Blending options Detailed Program of O&M on collection system Detailed Program of O&M on collection system Must meet Avg. Monthly and Avg. Weekly limits & % removal at all times during design period Must meet Avg. Monthly and Avg. Weekly limits & % removal at all times during design period Must use secondary system up to 100% of its capacity at all times Must use secondary system up to 100% of its capacity at all times Net Environmental Benefit (NEB) Net Environmental Benefit (NEB) De Minimus De Minimus NPDES Permit Reporting Requirements NPDES Permit Reporting Requirements Design Flow must be defined in Planning Documents Design Flow must be defined in Planning Documents Consultation with Dept of Health Consultation with Dept of Health Blended effluents not allowed for reuse purposes Blended effluents not allowed for reuse purposes

Interim Approach to FB Proposals For now, all flow blending proposals are first reviewed at regional level. If regional approval is granted, then Work group approval is required. Proposals then taken to the WQ PMT For now, all flow blending proposals are first reviewed at regional level. If regional approval is granted, then Work group approval is required. Proposals then taken to the WQ PMT PMT could grant approval, allow with conditions, or deny proposal PMT could grant approval, allow with conditions, or deny proposal Set of Information must be included with each proposal. Set of Information must be included with each proposal. Facilities previously permitted or approved to flow blend are exempt from this procedure. Facilities previously permitted or approved to flow blend are exempt from this procedure.

Contact Info Mark Henley, P.E Water Quality Program Northwest Regional Office, 3190 – 160 th Ave SE Bellevue, WA

Questions?