© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Federal and Regional Efforts Related to Marcellus Shale Exploration and Production David P. Russ,
PennDOT Strategic Environmental Management Program by Kenneth Thornton, PG, Ileana Ivanciu, PG, and James Heeren, PE 2011 TRB Waste Management and Resource.
Piceance Basin Natural Gas Development Program
Common Data Repository and Water Resource Assessment for the Southern and Northern Piceance Basin Northwest Colorado Oil and Gas Forum June 2008 Jude Thomas,
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
The COGCC APD/LGD Process and Recent Changes
Federal Energy and Environmental Regulation Agencies and Laws
OIL AND GAS AND GARFIELD COUNTY Presented To – CLUB 20 Spring Meeting March 20, 2004 Presented By - Doug Dennison, Oil & Gas Auditor.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
1 Effluent Guidelines for Construction Greg Davis USEPA
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
Stormwater Management
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
OIL AND GAS AND GARFIELD COUNTY Presented To – Northwest Colorado Oil & Gas Forum February 9, 2004 Presented By - Doug Dennison, Oil & Gas Auditor.
RAILROAD COMMISSION OF TEXAS OIL & GAS INDUSTRY REGULATORY JURISDICTIONS Gaye Greever McElwainAnn Marie Callery RRC Public OutreachTCEQ Small Business.
EMS Model Policy Planning Implementation Checking Corrective Action Management Review.
Page 1 Copyright © ALL Consulting, All Rights Reserved January 3, 2003ALL Consulting Overview of Coal Bed Natural Gas Best Practices and Mitigation.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Env 247 Overview of Stormwater Management March 1, 2011.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Ecological Revitalization: Turning Contaminated Properties Into Community Assets Michele Mahoney EPA Office of Superfund Remediation and Technology Innovation.
In The Beginning —Public Law 46 was passed by Congress: Established soil and water conservation and wise land use as a national policy Created the.
Davis Graham & Stubbs LLP DGSLAW.COM Dave Neslin Davis Graham & Stubbs LLP Former Director of the Colorado Oil & Gas Conservation Commission Environmental.
A COUNTY’S ROLE IN OIL & GAS DEVELOPMENT (ONE COUNTY’S PERSPECTIVE) Presented To – Colorado Institute for Leadership Training April 3, 2004 Presented By.
DMME RAP Meeting September 24, EIA Regulation – Outline 9VAC15-20 “Guidelines for the Preparation of Environmental Impact Assessments for Oil or.
OHIO STATE UNIVERSITY EXTENSION Ohio Pesticide Applicator Training Unit 5 Special Environmental Concerns.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Federal Energy and Environmental Regulation Agencies and Laws
Norse Energy Corp., USA  As natural gas assumes a far more important role in America’s energy mix, Norse Energy is committed to exploring, developing,
| [Contractor Safety Training] 1 Environmental Policy for Contractors.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Introduction to Construction General Permit Inspections.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
A STORM WATER OUTREACH PROJECT TO SMALL COMMUNITIES IN TENNESSEE.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
Agricultural Careers Soil Scientist By: Dr. Frank Flanders and Ms. Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department of.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Water Quality Rulemaking in Response to S.L
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
1 Welcome to the Public Scoping Meeting Environmental Impact Statement for the Sale of Plum Island, New York Welcome to the Public Scoping Meeting Environmental.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
United States Department of Agriculture Natural Resources Conservation Service NRCS Programs Applicable to Brownfields Natural Resources Conservation Service.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Federal Energy and Environmental Regulation Agencies and Laws
Scoping Meeting April 20th 6:00 pm
DLA Strategic Materials: ESOHMS Management Review FY17
Planning and BMPs for Large LUPs
Mulberry Watershed Management Plan
EPA Public Meeting Dallas, Texas May 10, 2005
Presentation transcript:

© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008

© Chevron 2005 Chevron Mid-Continent Business Unit 2 Chevrons Commitment to Environmental Stewardship Assistance to state agencies as a landowner in responding to Garden Gulch Engagement with Mineral Lessees as the Landowner Stormwater Management Programs Carbon Footprint Assessment, Alternative Energy Opportunities and Resource Conservation Surface Use Location Selection Process for Fee Acreage

© Chevron 2005 Chevron Mid-Continent Business Unit 3 Assistance to State Agencies Recent Garden Gulch Activity Worked closely with all regulatory agencies to provide information and access to property No regulatory obligation as landowner Provided CDOW access to conduct water and fish studies and samplings Provided on site access for EPA, CDPHE, CDOW, Garfield County and the Colorado Water Quality Control Commissioners – irrespective of statutory right of access

© Chevron 2005 Chevron Mid-Continent Business Unit 4 Stormwater Management Best Management Practices (BMPs) Controls Workforce training and awareness raising Utilization of stormwater program service providers for construction and inspection Preventing erosion and/or sedimentation with best management practices applications Silt Fence Retention Basins Check Dams Seeding and Mulching Grading/Roughening Techniques Road and driveway surfacing Spill Prevention Control and Countermeasure plans for reducing spills and/or consequences

© Chevron 2005 Chevron Mid-Continent Business Unit 5 Stormwater Management BMPs cont. Emergency Response Plans Methods of handling/disposing of contaminated soils Post Construction Controls Interim period between construction completion and final stabilization of the area Must be inspected once a month

© Chevron 2005 Chevron Mid-Continent Business Unit 6 Surface Use Location Selection Process The purpose of the process is to make quality land use decisions for the Piceance Development Program. Quality means balancing the environmental and surface use aspects with asset development. Similar processes are employed with mineral lessees on Chevron lands and where Chevron operates on others lands. Initial location selection Geologist recommends the pad location & description Area review On-site review and report with aerial photo of any findings Road access Grazing and/or irrigation impacts Pad orientation Drilling and Geology Review Will pad location and orientation work

© Chevron 2005 Chevron Mid-Continent Business Unit 7 Surface Use Location Selection Process cont. Formal Review of Site Record issues and mitigation recommendations Disturbed area Access road(s) Visual/noise impacts Grading Rig layout and well slot coordinates Pit liners Production facilities Wildlife habitat and migration T&E species considerations

© Chevron 2005 Chevron Mid-Continent Business Unit 8 Surface Use Location Selection Process cont. Mitigation Plan/Stakeholder Meeting Determine if process can proceed or if recycle is necessary Land Survey Disturbed area to be identified Detail Pad Design APD/SUP Preparation Construction and Operations Review for Final Pad Design