Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.

Slides:



Advertisements
Similar presentations
Workplace Occupational Health, Safety and Security
Advertisements

DOE IMPLEMENTATION WORKSHOP WATERSHED APPROACH TO FEDERAL LAND AND RESOURCE MANAGEMENT PAUL M. LIN (202)
Federal Energy and Environmental Regulation Agencies and Laws
Federal Environmental Policy: A Summary Overview
Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
Tennessee Solid Waste Program- Background The solid waste program within the DSWM regulates landfills and waste processing facilities in Tennessee. Solid.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
What is NPDES? “National Pollutant Discharge Elimination System”
Florida Department of Environmental Protection Air Resource Management Orange County Environmental Streamlining Task Force May 4, 2011 Air Resource Management,
Copyright © 2008 by West Legal Studies in Business A Division of Thomson Learning Chapter 50 Environmental Law and Land Use Controls Twomey Jennings Anderson’s.
Chapter 51 Environment Law and Land Use Controls Twomey, Business Law and the Regulatory Environment (14th Ed.)
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
RAILROAD COMMISSION OF TEXAS OIL & GAS INDUSTRY REGULATORY JURISDICTIONS Gaye Greever McElwainAnn Marie Callery RRC Public OutreachTCEQ Small Business.
© 2005 West Legal Studies in Business, a division of Thompson Learning. All Rights Reserved.1 PowerPoint Slides to Accompany The Legal, Ethical, and International.
Click your mouse anywhere on the screen to advance the text in each slide. After the starburst appears, click a blue triangle to move to the next slide.
Environmental Legislation and Agencies Review. Sets a time table for phasing out ozone- depleting substances.
© 2007 Prentice Hall, Business Law, sixth edition, Henry R. Cheeseman Chapter 45 Environmental Protection Business Law Legal, E-Commerce, Ethical,
COMPLIANCE ASSISTANCE OFFICE Giving small businesses a helping hand to overcome hurdles in Environment Regulations Genevieve Salmonson Compliance Assistance.
Federal Energy and Environmental Regulation Agencies and Laws
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
National Pollutant Discharge Elimination System(NPDES) Permit.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Celebrating Our Success David K. Paylor, Director Environment Virginia April 2013.
Chapter 25 Environmental Protection and Global Warming.
OH NO! WHAT DO WE DO NOW. WHAT DO YOU DO WHEN YOU DISCOVER THAT YOU’VE NOT BEEN DOING SOMETHING THAT YOU ARE REQUIRED TO DO? THE STORY OF RCW WATER.
Carrin Williams.  Purity of Waters Act  To assure supplies of clean drinking water  Clean Streams Law  To protect the streams from pollution.
Chapter 45 Environmental Protection and Global Warming.
Knowing your Legal Requirements Beth Graves EMS Project Coor. NC Division of Pollution Prevention and Environmental Assistance (DPPEA)
Comprehensive Volume, 18 th Edition Chapter 52: Environmental Law and Land Use Controls.
Under what common law theories can polluters be held liable? Under what common law theories can polluters be held liable? What is an environmental impact.
 Nuisance.  Person liable if they use their property in a manner that unreasonably interferes with others’ rights to use or enjoy their own property.
© 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Environmental Protection in the United States Christopher Green U.S. Embassy July 13, 2006.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
IDEM and Agricultural Organizations Meeting February 17, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental Management.
Chapter 46 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
ENVR 247 Spring Semester Environmental Practices.
From: Unnati, Esha & Sheila. Agency that protects human health and Natural Environment Formed on December 2, 1970 Formed by President Nixon Formed to.
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
LEGAL ASPECT OF WASTE MANAGEMENT (INTERNATIONAL) NURUL MAISYARAH BINTI SAMSUDIN NORAINI BINTI ABD RAHMAN NOR AINI OTHMAN NUR NAZNIN BINTI ISHAK.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
SOLID WASTE REGIONALIZATION MONTANA’S JOURNEY Waste & Underground Tanks Management Bureau Solid Waste Section.
Oil Pollution Act By D.J. Magee Period 3. Summary The Oil Pollution Act was signed into law by the U.S. legislature in August, The bill was passed.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
Prentice Hall © PowerPoint Slides to accompany The Legal Environment of Business and Online Commerce 5E, by Henry R. Cheeseman Chapter 25 Environmental.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Task Manager Construction Coordinator Training -- EMS-- Fermilab 95% of Asbestos found is either Amosite or Chryosotile95% of Asbestos found is either.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Chapter 45 Environmental Protection
Lecture (11): Waste Recycling
Federal Energy and Environmental Regulation Agencies and Laws
How to Protect the Local Environment
National Ambient Air Quality Standards (NAAQS)
Environmental Protection Agency
Essentials of the legal environment today, 5e
Chapter 17 Environmental Laws and Pollution Control.
Georgia Update Jeff Cown Land Protection Branch
National Environmental Policy Act of 1969
John Tinger U.S. EPA Region IX
Resource Conservation and Recovery Act of 1976
CONSTRUCTION REGULATIONS AND CODES
Level 1B: Advanced Fundamentals Effective August 2018
Relationship between World Bank and Romanian EA requirements
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings to the ACMP Develop and enforce standards for protection of the environment that allow for sustainable economic growth. Provide controls and enforcement for the prevention and abatement of pollution to the environment and to protect citizens from unsafe sanitary practices. Results: Results: Environment is protected Citizens are protected from unsafe practices

DEC Permits Subject to ACMP Permit to apply pesticides Permit to apply pesticides Oil discharge contingency plans for offshore facilities and onshore fuel storage facilities Oil discharge contingency plans for offshore facilities and onshore fuel storage facilities Oil discharge contingency plans for oil tankers and oil barges Oil discharge contingency plans for oil tankers and oil barges Solid waste disposal permit Solid waste disposal permit Waste disposal permit (wastewater discharge) Waste disposal permit (wastewater discharge) Clean Water Act -401 Certification Clean Water Act -401 Certification Air quality control construction permit Air quality control construction permit Air quality control operating permit Air quality control operating permit

. The Industry Preparedness program approves Oil Discharge Contingency Plans for offshore and onshore fuel storage with a capacity of 10,000 barrels or greater, and oil tankers and barges.The Industry Preparedness program approves Oil Discharge Contingency Plans for offshore and onshore fuel storage with a capacity of 10,000 barrels or greater, and oil tankers and barges. Contingency plans describe the equipment, resources, and strategies required to quickly respond in the event of a spill.Contingency plans describe the equipment, resources, and strategies required to quickly respond in the event of a spill.

The Pesticide program issues pesticide permits for aerial applications on public and private land and within a right of way. Pesticides must be registered and approved. Commercial applicators must be trained and certified. DEC is mandated by the legislature to allow the safe use of pesticides in order to protect human health and the environment -

The Solid Waste program issues permits to municipal Class I,II,III facilities, to non municipal monofills and to industrial landfills. The Solid Waste program issues permits to municipal Class I,II,III facilities, to non municipal monofills and to industrial landfills. The goal of a Solid Waste Disposal permit is to ensure effective management by requiring the use of Best Management Practices. The goal of a Solid Waste Disposal permit is to ensure effective management by requiring the use of Best Management Practices. These permits require plans management, and monitoring that ensures the protection of public health and the environment. These permits require plans management, and monitoring that ensures the protection of public health and the environment.

The Air Permit program issues permits for new construction and modifications of existing stationary sources. The Air Permit program issues permits for new construction and modifications of existing stationary sources. Air permits protect the Alaskan environment by ensuring that air emissions from industrial operations do not create unhealthy air. Air permits protect the Alaskan environment by ensuring that air emissions from industrial operations do not create unhealthy air. These permits require management of stationary out-of- stack air pollution discharges. These permits require management of stationary out-of- stack air pollution discharges.

The Wastewater program issues permits for domestic, municipal, and industrial wastewater disposal. The Wastewater program issues permits for domestic, municipal, and industrial wastewater disposal. This program monitors permit compliance with Alaska Water Quality Standards and other permit requirements. This program monitors permit compliance with Alaska Water Quality Standards and other permit requirements. DEC certifies that EPA wastewater discharge permits comply with State water quality law. DEC certifies that EPA wastewater discharge permits comply with State water quality law.

The Clean Water Act, 401 water quality certification provides reasonable assurance that a dredge and fill project will meet Alaska Water Quality Standards The Clean Water Act, 401 water quality certification provides reasonable assurance that a dredge and fill project will meet Alaska Water Quality Standards Stipulations on the permit require certain types of fill materials, erosion control and drainage control. Stipulations on the permit require certain types of fill materials, erosion control and drainage control. The wetlands program maintains and minimizes impacts to water quality associated with construction projects through the 401 Certification. The wetlands program maintains and minimizes impacts to water quality associated with construction projects through the 401 Certification. 401 Water Quality Certification

ACMP Process at DEC The activities permitted by DEC are excluded from ACMP consistency review. The activities permitted by DEC are excluded from ACMP consistency review. The issuance of a DEC permit establishes consistency with the ACMP Air, Land and Water Quality Standard. The issuance of a DEC permit establishes consistency with the ACMP Air, Land and Water Quality Standard. DEC is a review participant in ACMP reviews. The department can request additional information, comment and receive due deference for comments about air, land or water quality. DEC is a review participant in ACMP reviews. The department can request additional information, comment and receive due deference for comments about air, land or water quality. During single agency reviews permitters follow Single Agency Consistency Review Procedures for permits on the C- list and new general permits. During single agency reviews permitters follow Single Agency Consistency Review Procedures for permits on the C- list and new general permits.

DEC Single Agency Review Process This process applies when a project requires only a C-listed DEC permit. This process applies when a project requires only a C-listed DEC permit. DEC consults with coastal districts to determine if the proposed activity is the subject of an enforceable policy. DEC consults with coastal districts to determine if the proposed activity is the subject of an enforceable policy.

Federal Activities/Projects on Federal land DEC provides findings to the Office of Project Management and Permitting indicating whether the proposed activities satisfy the requirements in DEC statutes and regulations. DEC provides findings to the Office of Project Management and Permitting indicating whether the proposed activities satisfy the requirements in DEC statutes and regulations.