1 Presentation Crisis Management Tuesday September 29 AIG St. John’s University Tuesday, September 29.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Presentation Best Risk Management Practices John J. Hampton March 24, 2014.
By: Matthew Shuman 7A. The BP oil spill happened because a rig under the ocean exploded and wasn’t capped properly. BP was responsible for the spill.
1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
DEEPWATER HORIZON OIL SPILL APRIL –JULY 2010 Muhammed Fatih Altınok Zekeriya Akyıldız Halil Cihan Helvacıoğlu Ömer Burak Kınay.
Presenters: Steve Gigliotti Laura McMullen Marcus Smith.
Think Safe. Act Safe. Be Safe. Monthly Safety Spotlight, March 2010: Emergency Preparedness and Continuity Planning Preparing ahead of time helps you cope.
Petroleum Petroleum is an oil that is found underground.
Safety at Deep Water Horizon Lighting News – Focus on Reducing Hazards Preventing Errors Among Shift Workers Safety Photo of the Week Collider-Accelerator.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
1 Continuity Planning for transportation agencies.
Trouble in the Gulf Deepwater Horizon
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
Safety and Health Programs
Feature Article. Building Background Typhoons, willy-willies, hurricanes Hurricanes can whirl from 50 to 500 miles in diameter. They can contain sustained.
Staying Healthy and Safe Make Safety Your Business
Trouble in the Gulf Deepwater Horizon
Deepwater Horizon COMMUNICATION AND FAILURE WITHIN BP Annie Dai Jonathan Pearson Boiar Qin Victoria Wong Jason Zeng.
International Health and Safety at Work
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
Managing Company Tactical Operations
SWN Communications Inc. | Proprietary and Confidential – Not For Distribution Send Word Now ™ March 2009 St. Vincent’s: Planning for the Unexpected Michael.
By Leah Bertler 7B.  The oil spill started in the Gulf of Mexico and it happened on April 20, The BP oil spill occurred by the very big bubble.
Hazard Identification
Incident Review Meeting Example  The next slides are an example of how to complete the template and identify latent conditions, threats, errors, UAS and.
Business Continuity for Facilities Managers Peter Carr FastTrack Solutions Ltd
Safety & Health Programs.
Your full name Teacher’s Name 5 th Grade. Impact of the BP Oil Spill How is the leak being cleaned up? Why couldn't the oil leak be stopped quickly? What.
Workplace Health and Safety Practicum in LPSCS. Copyright © Texas Education Agency All rights reserved. Images and other multimedia content used.
PAR CONFERENCE Homeland Defense A Provider’s Perspective Lessons from TMI Dennis Felty November 15, 2001.
Gulf of Mexico Oil Spill. News Report This lesson you need to collect information on the Gulf of Mexico oil spill to help you write your own news bulletin.
How to Protect Your Company and Your Customers in a Dangerous World Lee L. Bishop ICPHSO Annual Meeting and Training Symposium February 23, 2011 Orlando,
1 Presentation BP, Copiapó, and the MV Braer. 2 Presentation BP Oil Spill.
FLOOD MITIGATION OBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006.
Trindel Insurance Fund Department Safety Representative Training Safety Incident & Hazard Reporting.
Preventing Slips & Trips at Work
OSHA Office of Training and Education1 Safety and Health Programs.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
“Billions of dollars in damage, animals threatened, people scared. This is one of the worst problems that has ever struck the Gulf of Mexico”- New York.
Developing an Issues Management Plan Poor Crisis Management NEW YORK (AP) -- Lingering images of passengers stranded at sea for days as toilets back.
Refinery Safety EDM Services, Inc. April Tesoro Blast  Horrific explosion on Friday, April 2, 2010 at 12:30am in Anacortes, Washington.  Cause.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
What is 9/11? On the 11 th September 2001 (9/11) there was four suicide attacks that were committed in the United States of America which were to strike.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
By Jesse Buchman. We don't know exactly what happened to cause the blowout, but there will no doubt be months of investigations. The basic idea of what.
The Reputation for Safety at BP
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
© 2012 Regents of the University of Minnesota. All rights reserved.
Relating to the Public.
Crisis Management. What should we do in a crisis? Learning Objective.
Health and Safety in Adult Social Care.
Crisis Management Crisis: any situation that has the potential to affect long-term confidence in an organisation or product and may interfere with its.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
 Flight 11 takes off from Boston, MA  Flight 175 takes off from Boston, MA.
Tom Lenart & John Field CT DEMHS Region 2.  Department of Emergency Services and Public Protection (DESPP)  Commission on Fire Prevention and Control.
PIER System Discussion with Phillips 66 August 23, 2013.
Witt-O’Brien’s Presentation with Southeast Pennsylvania Regional Task Force January 28, 2013.
Safety Leadership - the game changer at National Manufacturing & Supply Chain Conference On 26 th January 2016 Presented by Mary Darlington - BSc., CFIOSH.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Mrs. Brinston. a. Disasters can hit like a bomb, causing injury, death, and power-phone-water outage. b. A plan of action dispels the chaos so that pt.
DIVISION OF STUDENT AFFAIRS EMERGENCY RESPONSE TEAMS.
Fire Safety & Disaster Planning
EMERGENCY OPERATIONS PLANS
The strength of ombudsmen in a disaster
Meter Reading Safety Initiatives
International Environmental Law
Presentation transcript:

1 Presentation Crisis Management Tuesday September 29 AIG St. John’s University Tuesday, September 29

2 Topics BP Oil Spill Recovery Chilean Mine Collapse Jet Blue Airways Disruption Crisis Planning at U.S. Airways

3 Presentation BP Oil Spill

The BP Crisis Day 1. (April 20, 2010) Transocean is preparing to move the Deepwater Horizon:  Leased to the BP Group.  Finished drilling a high pressure well for BP.  Explosion creates an out-of-control sea- floor oil gusher.  The oil rig sinks. 4

In Fairness to BP Horizon Deepwater was a very successful rig until April 20, 2010:  Seven-year safety record.  Drilling some of the deepest wells in the world.  Never fail or mostly working?  Should BP have known? 5

Mostly Working in Normal Times 2005: Texas City Refinery explosion.  15 deaths.  180 injuries.  Cause: Hydrocarbon overflow. Maintenance was cut as a cost-saving measure post-disaster inspection findings:  270 unfixed safety violations.  439 new violations. 6

Mostly Working At the BP Texas City refinery in :  Worker crushed between a pipe stack and mechanical lift.  Worker electrocuted.  Worker killed by a 500-pound piece of metal. In the North Sea in good weather:  BP helicopter ferrying workers from BP oil platform crashed killing all 16 on board. 7

Mostly Not Working From 2007 to 2010, (Occupational Safety and Health Administration) OSHA reported:  851 willful safety violations by U.S. oil refiners.  829 by BP. February OSHA reported that “BP has a serious, systemic safety problem in their company." 8

Information not Shared On the Horizon Deepwater, workers were surveyed prior to the oil spill:  Concerned about safety practices.  Feared reprisals if they reported problems.  Unreliable equipment.  “Run it, break it, fix it.”  Did BP have access to the information? 9

Failure to Collaborate On the Horizon Deepwater, Transocean did a 112-page equipment assessment report:  Unsafe conditions and practices.  Rig had never been in dry dock.  Blowout preventer rams and fail-safe valves not inspected.  26 components and systems in “bad” or “poor” condition. 10

Lacey Resignation Kevin Lacy was a drilling engineer who had implemented a rigorous drilling safety program at Chevron.  He was hired by BP in 2007 senior vice president for drilling operations.  He tried to improve and standardize the BP drilling policies and practices.  He resigned in 2009 believing BP was not committed to improving safety in offshore drilling. 11

Ready to Respond? Slow progress.  It was one thing to be surprised.  It is another thing to not be ready to respond.  The crisis was attacked in stages.  Close blowout preventer valves.  Add a containment dome.  Pump in heavy fluids  Pump in mud and cement. 12

Outcome Day 86. July 15, 2010 – Gusher was capped after releasing 5 million barrels of oil. 13

14 Presentation Chilean Mine Collapse

15 Copiapó Mining Accident A quite different picture Day 1. August 5, 2010  Copiapó, Chile.  Collapse of San José copper-gold mine  Trapped: 33 miners 770 meters below ground.  Did they survive?

Quick Response Day 4.  Chilean President Sebastián Piñera took charge.  Andre Sougarret, head of El Teniente mine put in charge.  Flew immediately to Copiapó.  Took charge.  Did they survive? 16

Situation at the Mine Day 5. Sougarret:  Found a nest of confusion with rescue workers, firefighters, police officers, volunteers and relatives.  Sent rescue workers home.  Talked to escaped workers.  Inspected the mine.  Gathered maps. 17

Gathering Information Day 6. Findings:  Huge block of stone closed the 4-mile corkscrew shaft to the miners.  Collapse involved 700,000 tons of rock.  Reopening the shaft could cause another collapse.  Nobody knew if the miners were still alive. 18

Hope for the Miners Day 7. Sougarret talked to miners who had escaped the collapse. Learned:  Maps were not up-to-date.  Likely location of trapped miners.  Safe room with 48-hour supply of food and water. Also repair shop.  Ventilation shaft..  Miners had a chance to be alive. 19

Find the Miners. Green. 4 drill shafts to galley near shelter. Blue. 4 drill shafts to shelter. 2 points of collapse Repair shop. Shelter. 20

Start of Success Day 17.  The 8 drills are getting close.  One drill broke through into the shaft near the safe areas.  Banging on the drill head.  Rescue team retrieved note. 21

Step 2. Prepare for the Rescue. Days 18 to 69  Drill two 28-inch wide shafts.  Send food, water, oxygen, messages, progress reports.  Monitor health conditions. 22

Successful Rescue Day 70. October 13, 2010  From midnight to 11 pm.  One at a time.  33 times. 23

BP Weakness Before the Event Before the extreme event:  Safety information identified but not shared.  Failures to comply with regulations not in organized systems.  Collaboration not encouraged. 24

BP Weakness after the Crisis Weaknesses include:  Failure to respond decisively to spill.  Failure to respond decisively to clean up. 25

Copiapó Situation Copiapó was different:  Good. Local risk management.  Bad. Central risk management. 26

Local Risk Management Two safety features:  “Safe” room.  Stocked with provisions.  Ventilation shaft.  Separate escape route. 27

Central Risk Management Weakness before the crisis:  Failure to maintain safety standards in a dangerous place.  Failure to install ladders after failing a safety inspection that closed the mine.  Opportunity lost. A second collapse closed the shaft. 28

Question Did BP have the big picture in 2010? 29

Big Picture Board of Directors Safety Practices in Texas Cost Cutting Concerns of Rig Workers Maintenance of Oil Rig itself Kevin Lacy Resignation OSHA Violations

Big Picture Top Management High pressure well 41 miles from Louisiana wetlands Everybody not ready Rig needs overhaul Rushing to complete drilling

Cost Cutting and 41 Miles Linkages. leads to creating while for a big loss when 32 Cost Cutting Unsafe practices Rushing to complete drilling Everybody is not ready 41 miles from Louisiana wetlands Poor maintenance of oil rig

Question Did Sebastián Piñera and Andre Sougarret have the big picture in 2010? 33

Lesson Learned Risk management has value.  We cannot predict extreme events.  We can look for the big picture.  We can avoid some situations.  We can prepare for others. 34

Lesson Learned Severity Trumps Frequency  The value of risk management is not the occurrence of extreme events.  We may just be lucky.  Who knows?  But we should be ready. 35

36 Presentation Jet Blue Airways Disruption

37 Jet Blue Airways New York’s Kennedy Airport. Valentine’s Day Ice storm. Trapped passengers on planes up to 10 hours.

38 Question Did the company have the Big Picture?

39 Question (2) What are some examples of disruptions?

40 Answer Examples:  Ice storm.  Police action.  Terrorist act.  Congestion.  Maintenance.  FAA regulations.  Technology.  Fuel shortage.  Employee absence. Strike. Crazy person. Power outage. Communications outage. Airport closing. Improper training. Absence of linguists. Missing parts. Accident/Crash.

41 Question Who should be responsible for disruption risk?

42 Answer Highest level.  This risk is assigned to the Executive Vice President for Flight Operations. Next level.  It is further assigned to Kennedy Airport Operations Center.

43 Question What is the likelihood of a disruption of operations? An ice storm hits New York once every three winters. 33%. The chance of hitting at a busy time.

44 Answer A disruption is likely to happen one time in a 9-year period.

45 Question How severe could it be to have a disruption of operations?

46 Answer Could be:  A public relations nightmare if passengers stranded on planes for long periods of time.  Financially costly to reimburse passengers for losses or time spent.  Harmful to long-term and cherished reputation for the highest quality of customer service.

47 Question What alternatives did Jet Blue have to mitigate the impact of a disruption?

48 Answer (1) Bus Contingency Plan. Unload planes sitting on the tarmac.

49 Answer (2) Additional Personnel. Train nearby headquarters staff. "We had so many people in the company who wanted to help but who weren't trained to help," David G. Neeleman, CEO quote, New York Times”.

50 Answer (3) Revised Operating Procedures. For weather or other delays.

51 Question What were the consequences of the failure to prepare?

52 Answer (1) Consequences:  $30 million in added costs.  Removed from #4 position in a customer satisfaction survey published by Business Week (March 5, 2007).

53 Answer (2) Consequences:  $30 million in added costs.  Removed from #4 position in a customer satisfaction survey published by Business Week (March 5, 2007).  Jet Blue was the cover story in Business Week on March 5.

54 Answer (3) More consequences. Jet Blue endangered:  Top choice in national airline quality rating (4 years in a row).  Condé Nast Traveler reader’s choice award (5 years in a row).  High J.D. Powers ranking for quality.

Question What happened to Jet Blue in the years after the Valentine’s Day disruption? 55

Answer Jet Blue recovered:  Implemented a Customer Bill of Rights.  Created a database to track crew locations and contact information.  Cross trained employees and had on call in the event of a crisis.  Created a Web-based rebooking system to reschedule flights. 56

Presentation Tower Request Takeoff 57

58 Presentation Crisis Planning at U.S. Airways

59 Question U.S. Airways flight 1549 landed on the Hudson River in 2009 with no loss of life. Landing by pilot Sullivan was called the “Miracle on the Hudson.” How did U.S. Airways prepare for a crisis?

60 Answer Preparation:  “Dry Runs.” 3 times a year at every airport it serves.  “Care Team.” Gates agents, reservation clerks, and other employees dispatched on a “moment’s notice.”  800 Number. For families to call for information.

61 Question How did it handle the passengers who were removed from the plane?

62 Answer The airline took action:  150 employees from headquarters (Arizona) to New York.  Employees credit cards to buy medicines, toiletries, and personal items.  Bag of cash.  Suitcases with prepaid cell phones and sweat suits (dry clothes).  Escorted passengers to hotels with 24-hour buffets.

63 Question What else did it do?

64 Answer (1) More action:  Arranged train tickets and rental cars for individuals who did not want to get back on a plane.

65 Answer (2) More action:  Arranged train tickets and rental cars for individuals who did not want to get back on a plane.  Reached out to high-level executives at Hertz and Amtrak so no hassle getting the tickets.

66 Answer (3) More action:  Arranged train tickets and rental cars for individuals who did not want to get back on a plane.  Reached out to high-level executives at Hertz and Amtrak so no hassle getting the tickets.  Retained locksmiths to help passengers who had lost keys for cars and home.

67 Question Anything else?

68 Answer (1) Follow-up action:  Sent letters updating passengers after they arrived home.

69 Answer (2) Follow-up action:  Sent letters updating passengers after they arrived home.  Refunded the airplane ticket and gave each passenger $5,000 to replace lost possessions.

70 Answer (3) Follow-up action:  Sent letters updating passengers after they arrived home.  Refunded the airplane ticket and gave each passenger $5,000 to replace lost possessions.  Paid additional monies to passengers where $5,000 did not cover losses.

Question Jet Blue stumbled. U.S. Airways seized an opportunity. Is life fair? 71

Answer (1) Is life fair? Jet Blue fully recovered. American Airlines acquired US Airways. 72

Answer (2) Is life fair? Jet Blue fully recovered. American Airline acquired US Airways. U.S. Airways management will run the combined airline from the American headquarters in Fort Worth, Texas. 73