1 Project Budgeting. 2 Control or Feedback Involves Monitoring/Assessing Output to Determine Necessity of Making Changes in Input or Transformation of.

Slides:



Advertisements
Similar presentations
Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Advertisements

The Control System.
Cost Estimation and Budgeting
© 2006 Prentice Hall, Inc.4 – 1  Short-range forecast  Up to 1 year, generally less than 3 months  Purchasing, job scheduling, workforce levels, job.
Chapter 2.
Chapter 15 Financial Management Cost Accounting Traditions and Innovations Barfield, Raiborn, Kinney.
Estimating Project Times and Costs
PowerPoint Presentation by Charlie Cook Control Systems: Financial and Human Chapter 14 Copyright © 2003 South-Western/Thomson Learning. All rights reserved.
Cost Accounting AGEC Spring Managerial Cost Concepts 1.Direct materials 1.Direct materials: raw materials physically associated with the.
Organizational Systems Controls
Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Managerial and Quality Control CHAPTER 19. Copyright © 2008 by South-Western, a division of Thomson Learning. All rights reserved. 2 Learning Objectives.
Cost Accounting Allocation of Overhead MB-664 May 2009.
Time and Cost Estimation
Cost Accounting An Overview. Managerial Cost Concepts 1.Direct materials 1.Direct materials: raw materials physically associated with the final product.
MEM 612 Project Management
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
1 MODULE 2 Strategic and Operational Management in Public Sector Chief Information Officers (CIO)
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 The Flexible Budget: Factory Overhead Chapter Fourteen.
1 Given the following data, compute the tracking signal and decide whether or not the forecast should be reviewed.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
EMBA Presentation October 20, Overview  Budgets Within the Architecture of the Organization  Types of Budgets  Budget Preparation Theories 
Full Costs and Their Uses
Cost Concepts and Cost Allocation
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Review network diagram Forward/backward pass Critical path/activities Float Funding a project Costs estimates Type of costs Financial reports 7-1.
Managerial Accounting UMST-MBA-BATCH 8
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Costs and returns project Congress decreed that USDA conduct cost of production (COP) studies for selected commodities National survey for 15 commodities.
Adult Education and Literacy Budget Development and Cost Allocation.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
: Mrs. Kamlesh.  Standard cost is: A predetermined cost. Used for cost-control. And the technique is known as standard costing.
Copyright © 2012 by John Wiley & Sons, Inc. All Rights Reserved. HOUSEKEEPING MANAGEMENT SECOND EDITION ︳ MATT A. CASADO.
Cost Estimation and Budgeting Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 8 Learning Objectives After completing.
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
4-1 Chapter 4 Budgeting the Project. 4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting.
Estimating projects Estimating  The process of forecasting or approximating the time and cost of completing project deliverables  The task of balancing.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
CHAPTER SIX Budgeting. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-2 Outline of Chapter 6 Budgeting  Generic Budgeting.
MEM 612 Project Management
Project Management in Practice, Fourth Edition
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
5 Ir. Haery Sihombing/IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka Project Management Estimating Project Times.
Cost Estimating and Budgeting. Cost Estimating Initial Cost Estimate Initial Cost Estimate Underestimates are Initially a Big Problem Underestimates are.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 14 1.
CONTROLLING (MANAGING QUALITY AND PERFORMANCE) PRIMAN KATE MARANON KAT NG KRISTA TAMAYO.
Budgeting An important Project Management Tool. What is a budget? A Plan A Limit A Schedule A Reality Check An Allocation.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Introduction to Cost Accounting and the Job Order Cost Cycle
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Cost Analysis 101 Prepared by Frederic Glantz November 13, 2009
Cost Accounting and Reporting Systems
AP Macroeconomics Final Exam Review.
“Cost Driver” (the activity) Owning a car
Chapter 4 Budgeting the Project.
Budgeting for Planning and Control
Exponential Smoothing with Trend Adjustment - continued
PUBLIC WORKS EXPENDITURES BY DIVISION
Presentation transcript:

1 Project Budgeting

2 Control or Feedback Involves Monitoring/Assessing Output to Determine Necessity of Making Changes in Input or Transformation of Input. INPUT  TRANSFORMATION  OUTPUT Budgeting is an Important Control Technique. Does the Output or Result Use Up More or Less Resources than Expected? (I.E. Does It Cost More?) What Action Can be Taken to Correct the Problem if There is One? A Budget is a Baseline Measuring the Differences between the Planned and Actual Use of Resources.

3 The Control Process

4 Budget Example Expenses ActualBudgetVariance Payroll 8511 Salaries 29,42534,5835, Payroll Tax 1,789 3,4581, Group Ins. 1,407 1, Misc Bonus Total Payroll 32,66439,1246,460

5 Obtaining Budget Data Top-Down Budgeting Bottom-Up Budgeting Mixed Methods

6 Budget Orientation Line Budgeting – Causes Budget to be Split Up among Many Different Organizational Units Program (Task) Budgeting – Aggregates Income and Expenditures across Programs. For Example: Project AProject BTotal Rent $2000 $1000 $3000 Parking Telephone Totals

7 1.Planning-Programming-Budgeting System (PPBS) Cost/Benefit Analysis of Sets of Projects. Problem: Measuring Costs and Benefits. 2.Zero-Base Budgeting (ZBB) Review Desirability of Each Program before Funding Problem: ZBB Perceived as a Threat. Types of Program Budgeting

8 3.PERT/COST Costs Assigned to Workpackages (Activity Groups). Problem: Time and Cost of Updating Information. 4.Activity-Based Costing (ABC) Can be Used to Track Sums of Activity Costs Over Time. Types of Program Budgeting

9 Activity-Based Costing Measures the Cost and Performance of Activities, Resources, and Cost Objects. Assigns Resources to Activities and Activities to Cost Objects Based on Resource Use. Recognizes the Causal Relationship of Cost Drivers and Activities.

10 Purchasing Budgets FUNCTIONAL Salaries & Benefits$300,000 Administration & Support 75,000 Travel 30,000 Supplies 20,000 Other 25,000 Total$450,000 ACTIVITY Sourcing & Selection$180,000 Contracting 150,000 Purchase Orders 120,000 Total$450,000

11 ABC Tracks Costs Over Time

12 Cost Estimation 1.Identify Resources Needed. Which? How Much? 2.Convert Units of Resources to Dollars. 3.Sum Painting Job Example: Labor $10= $2000 Paint (Gallons) 5= 100 Brushes (Unit) 2= 50 Cash= 100 Total $2250* *Overhead Often Added as a % Adjustment (E.G 20%).

13 Problems in Estimation Learning Curves Waste and Spoilage More Resources Required than Anticipated Changes in Resource Prices (E.G. Inflation) Loss of Project Professionals Allowance for Contingencies

14 Measuring Cost Variations Mean Absolute Deviation (MAD) MAD =  (|A(t) – E(t)|) / n WhereA(t) = Actual Cost E(t) = Estimated Cost n = Number of Observations Tracking Signal (TS) TS = RSFE / MAD RSFE is Running Sum of Forecast Errors

15 Measuring Cost Variations Example: PeriodA(t)E(t)A(t)-E(t)|A(t)-E(t)| Totals MAD = 40 / 4 = 10TS = 36 / 10 = 3.6 Guideline for TS: TS  3

16 Measuring Cost Variations