NESTS Transit Planning Project Facilities and Technology Briefing with CAST of Cornell University and Creighton Manning Engineering, LLP.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Bus Real-Time Information Steven Turvey and David McGuigan Consultants, Faber Maunsell Nottingham University, 24 th November 2005.
Metro Transit INTELLIGENT TRANSPORTATION SYSTEMS (ITS)
Presented by: Chakman Choi, Baradhwaj Hariharan, Uday Sankar Kandolath Date: 4/3/07.
Overview What is the National ITS Architecture? User Services
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Introduction of FUTÁR System. Basic data of FUTÁR System Devices to be installed The investment cost of project: EUR Vehicle consolidated with.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
WMATA Bus ITS Project Update Transit Signal Priority Briefing to the Traffic Signals and Operations Working Group April 21, 2005.
Transportation Tuesday TRANSPORTATION TUESDAY What needs quick thinking and concentration? Intersection, junctions, roundabouts & U turns all require your.
GPS TimeTrack ™ for Vehicles. Proprietary and confidential. All rights reserved. Xora, Inc. 2 Overview GPS TimeTrack for Vehicles In-Vehicle Option –Real-Time.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Mobile Transit Planning with Real Time Data Jerald Jariyasunant, Dan Work, Branko Kerkez, Eric Mai Systems Engineering Program, Dept. of Civil and Environmental.
Advanced Traveler Information System ATIS. What are Intelligent Transportation Systems (ITS) ? The application of advanced sensor, computer, electronics,
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
1. Overview Background Introduction to IntelliDrive SM Preliminary Research/Proof of Concept Potential Applications –Safety –Mobility –Commercial The.
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- user’s.
Surface Transport and Information Technology
TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location –Speed Door & Lift Status –Predictions Passenger Counting.
Transit Traveler Information CEE582. Fixed-Route Central ControlCustomer Information Wireless Data On-Off Load Data Radio/ Message and AVL Transmission.
APTS – Fourth Day Miscellaneous Topics. Fleet Management Fixed Route versus Paratransit Operations versus Maintenance.
Applications of GPS to Shortest Path Algorithms and Automatic Vehicle Location Systems A Project for FRS 142 – Where’s Waldo? The Science and Application.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Center for Urban Transportation Research | University of South Florida Technology Session: 21 st Annual Transportation Disadvantaged Best Practices and.
Bus Stop Design Guidelines - In Support of Effective Service Planning
Rapid Transit System Steering Committee Meeting December 4, 2012.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
How to Conduct a Government Operations GHG Emissions Inventory AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Broward County Pollution Prevention, Remediation and.
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
[1] INSTITUTE OF ADVANCED COMPUTER AND RESEARCH TECHNICAL SEMINAR PRESENTED BY- A SEMINAR PRESENTATION ON AUTOMATIC VEHICLE LOCATER NIWEDITA BURNWAL.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Intelligent Transportation System (ITS) Project Update TAC - July 21, 2015 Nick Perfili, FCDOT Department of Transportation.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
TRB 88th Annual Meeting, Washington DC January, 2009 Huan Li and Robert L. Bertini Transportation Research Board 88th Annual Meeting Washington, DC January.
Trackstar Navigations Pvt. Ltd. Presenting New Generation GPS Tracking System.
Bus Lane with Intermittent Priority
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
STATE-OF-THE-ART OF FINNISH PT TELEMATICS Research Scientist Mikko Lehtonen, VTT.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
ITS Lab Members  Ph.D Student in Civil Engineering  Areas of Interest  Freeway Management and Operation  Transit Operation  Intelligent Transportation.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
16 October London Borough of Merton Transport Liaison Robert Pontin.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Vehicle Management And Tracking Software
Bus Detection Device For The Passenger Using GPS And Gsm Application Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Abstract The City of Portland, in collaboration with TriMet (Portland’s regional transit service provider) and the Oregon Department of Transportation,
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Camden County Travel Management Coordination Center Project Update Camden County WIB Board Meeting – March 26, 2008.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
VEHICLE MANAGEMENT SYSTEM
Real Time School Bus Tracking System
I-85 Corridor Light Rail Transit Feasibility Study
Presentation transcript:

NESTS Transit Planning Project Facilities and Technology Briefing with CAST of Cornell University and Creighton Manning Engineering, LLP

Tasks for Facility and Technology Review Determine whether and how a new transit center can be developed in the Route 13/ Triphammer Road area Assess the potential benefits of new traffic control, transit operations and traveler information-oriented technologies

Transit Center Feasibility Assessment Five Dimensions of Feasibility Institutional Operational Physical Fiscal Cost-Effectiveness

Transit Center Feasibility Assessment Key Questions on Feasibility Institutional: Can all parties reach agreement on a workable site and plan? Operational: Will the transit center truly benefit/be compatible with operations? Physical: Can the center be fit as needed into an available space? Fiscal: Are the initial and ongoing costs of center operations affordable to the region? Cost-Effectiveness: Is development of the center worth doing?

Exploring Potential Benefits of Technology Not just “technology for technology’s sake” – looking for practical benefits

Some Possible Technology Applications Vehicle-Based/“On the Road” Signal Priority Bridge Signals Automatic Vehicle Location Systems Automatic Passenger Counters Improved Timed Transfers See the “APTS Summary Table” handout for other technologies which will be explored in the course of this Study

Vehicle-Based/“On the Road” Concepts Signal Priority for Transit Vehicles Description Depending on whether a bus is running on time, early, or late, and whether it is currently at a stop boarding passengers, a computer on the bus decides whether to send a signal to a traffic light to extend a green light, or turn a red light to green to get the bus through the intersection faster. Potential Benefit Faster and more reliable service.

Vehicle-Based/“On the Road” Concepts Bridge Signals for Transit Vehicles Description For one-lane bridges, approaching buses send signals to traffic lights (like the signal priority treatment) requesting that opposing traffic be stopped and the buses let through. Potential Benefit Helps keep transit on schedule.

Vehicle-Based/“On the Road” Concepts Automatic Vehicle Location Systems Description Buses are tracked as they travel along their routes, using either Global Positioning Systems (GPS) or roadside beacons. Potential Benefit This is a key input to real-time traveler information, fleet monitoring and transit security.

Vehicle-Based/“On the Road” Concepts Automatic Passenger Counters Description Optical sensors count passengers as they enter or leave a bus. Potential Benefit These data can provide important information on travel patterns and service needs.

Vehicle-Based/“On the Road” Concepts Improved Timed Transfers Description Coordination of the schedules of different transit routes to facilitate transfers. Potential Benefits Easier use of transit for making connections between sites not on the same route, and reduced wait time for transfers.

Some Possible Technology Applications Traveler Information Systems – Real-Time Bus Status Information Kiosks Internet Countdown signs at stops See the “ATIS Summary Table” handout for other technologies which will be explored in the course of this Study

Traveler Information Systems Concepts Kiosks Description Tied into bus tracking systems, touch- screen kiosks at malls, universities and other major destinations provide current information on bus status and opportunities for connections with other routes. Potential Benefits Improves pre-trip planning and system navigation; can enhance the attractiveness of transit.

Traveler Information Systems Concepts Internet Description Web-based counterpart to kiosks, providing 24-hour access to bus status information and schedules. Potential Benefit As for kiosks, improved pre-trip planning.

Traveler Information Systems Concepts Countdown Signs at Transit Stops Description Based on bus tracking system and schedule data, displays provide estimates of when buses will next arrive at a given stop. Potential Benefit Reduces traveler impatience with the system by providing clear indications of remaining waits.

For More Information… Fernando de Aragon, Ithaca-Tompkins County Transportation Council (607) 274 – 5570 Steve Falbel, Multisystems, Inc. (617) 864 – 5810 x285 Steve Allocco, Creighton Manning Engineering, LLP (518) 446 – 0396