PHIN JRA Status PHIN collaboration CARE SC meetingParis 23-24 February 2004.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Starting an ESC Chapter in Your State. Energy Services Coalition Mission To promote the benefits of, provide education on, and serve as an advocate for.
Linn OHLSSON, IATI Secretariat Rudolphe PETRAS, Development Co-operation Directorate, OECD IATI Steering Committee, 3 October 2013 The Common Standard.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
EU Information and Publicity Policy Claudia Salvi e Anna Claudia Abis Formez 8 May 2007.
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
Development plan and quality plan for your Project
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
What is SMEcollaborate Primarily developed for Small and Medium Companies who wish to collaborate together. It is a:- A resource center for collaborating.
Agricultural Market Information System (AMIS): State of Play AMIS First Meeting of the Rapid Response Forum 11 April 2012 Mexico City Abdolreza Abbassian,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
Recommendation JAINA Committee Structural Proposal.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
BALTICOM - BALTIC Transport Communication and Regional Development Klaipeda, 6 to 8 September rd Project Meeting.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Every Child Matters Improvement Programme Integrated Working In Localities Project Phase 2 – October 2009 update.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
COGAIN Kick-Off Tampere, Finland WP 9: Management Stina Boedeker
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Platform for African-European partnership in agricultural research for development (Phase II) Nairobi WP5 meeting - PAEPARD II 4YE – Thierry - February.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
SAON Operational Activities Draft proposal Jan René Larsen SAON Board Meeting, January 2012, Tromsø,
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
ERA-PLANET KoM, Brussels February 2016 WP 2 Jana Klánová RECETOX, Masaryk University Czech Republic.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Karantonis Iraklis PRAXI Network/FORTH Thursday, 14 th April, 2016 STEP-C, Heraklion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Activity of the USER GROUP (January October 2012)
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
AMICI WP1 – Management, coordination and dissemination
TOP6 – WP4 Coordination and Management JPICH Coordination Office
MIG-P orientation debate
TOP6 – WP4 Coordination and Management JPICH Coordination Office
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Presentation transcript:

PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004

Graeme Hirst takes place of Ian Ross as coordinator of the Laser WP. Ian continues to collaborate to the project part time

First PHIN Steering Committee meeting Paris 3 – 4 February 2004 IN2P3 LPNHE (Jussieu Paris) - Tuesday 3 (14:00 – 18:00) 1 – PHIN Steering Committee organization 2 - PHIN WEB area configuration: Relevant Links / Papers collection Databases set up 3 - Job Opportunities (notice in PHIN and ESGARD pages) 4 - PHIN collaboration meeting 5- PHIN review Committee - Wednesday 4 ( 09:00 – 13:00) 6 - Work packages organization 7 – Discussion on first milestones and deliverables A.Ghigo(PHIN Coo.) G. Bienvenu (WP GUN) J.G. Hirst(WP LAS) J. Teichert(WP CP)

1 – PHIN Steering Committee organization a.SC decided to have regular meeting three times a year to revise the work package activities, possibly co-located with the collaboration meetings in order to optimise the time and the cost of the meeting itself. b.SC proposed to hold the second PHIN SC meeting during the ELAN and PHIN collaboration meetings in Frascati. The meeting date could be May 5th or 6th. c.The third PHIN SC meeting was proposed for October, during the CTF3 Collaboration Meeting.

2 - PHIN WEB area configuration: Relevant Links / Papers collection Databases set up a.SC agrees to create the PHIN WEB page in the INFN WEB area and to put links to PHIN WEB on the main pages of the participating laboratories. b.SC committee will encourage all the participants to communicate the most relevant links for the JRA. c.The JRA participants should collect the most interesting papers in the photoinjector field and put the references on the PHIN WEB site. d.SC agrees not to restrict access for readers of the PHIN WEB page, assuming no objections from CARE management or Institute Directors. e.SC hopes to create a database in which the news on photocathode materials, the best lasers for the photoinjector options and the most promising design for the gun structure will be collected. f.To begin with the collected documents will be published on the WEB page through INFN; we can decide to give write access to the page to selected participants. g.The WEB page will include a Job Opportunities area.

3 - Job Opportunities (notice in PHIN and ESGARD pages) SC discussed the procedures of the different laboratories for additional staff recruitment. The institutes are free to use their own contracts and procedures, taking into account that it is necessary to give notice of the open positions in the CARE and in PHIN web pages. The participating institutes should start these procedures as soon as possible, following the Rossendorf example, while awaiting the EU funds.

4 - PHIN collaboration meeting SC proposed to hold the collaboration meeting in Frascati during (and in parallel with) the ELAN network activities collaboration meeting. The ELAN meeting will start with plenary sessions on May 4 th. May 5 th will be dedicated to parallel sessions and PHIN SC proposes to schedule the PHIN collaboration meeting alongside these.

5- PHIN review Committee SC agrees to form an international review committee composed of three specialist researchers in photocathodes, lasers and RF guns respectively. Names were proposed and SC members will contact them. WP2-CP: Paolo Michelato WP3-LAS: Wolfgang Sandner WP4-GUN: ??? The idea is to invite the review committee to the collaboration meeting in order to involve them from the beginning of the programme.

6 - Work packages organization SC discussed the entire PHIN JRA proposal in order to organize the WPs and, in particular, those aspects related to the collaborations between participating institutes, the schedule for the first reports and the financial plan for the first 18 months. Each WP coordinator will manage the commencement and continuation of the work to achieve the goals of the different tasks and to collect any missing information. SC is convinced that the plans and initial phases of our activities are in good shape and that the resources are adequate for the short and medium term plans.

Main Hardware Deliverables 2 Photocathode preparation chambers (LAL, Rossendorf). 1 High power Laser system (CERN) 1 Conventional Laser system (LAL) 1 SC photo-gun prototype (Rossendorf). 2 3GHz RF gun (CERN, LAL) 1 Low energy e- spectrometer (LOA) 1 High energy e- spectrometer (LOA)

7 - Discussion on first milestones SC discussed all the milestones and deliverables presented in the proposal. SC decided that the following Reports should be delivered during 2004: 1- Existing photocathode material comparison (June) 2- Cathode preparation chamber design (July) 3- High power laser oscillator (June) 4- High power laser amplifier (September) 5- Pulse shaper studies (June) 6- Harmonic crystal studies (June) 7- SC RF gun studies (June) 8- 3 GHz RF gun design (June) 9- Low energy spectrometer design (May) JRA coordinator will ask to CARE SC for the report form (UE template?). SC is convinced that the milestones and deliverable are achievable, but strong effort from all the participating institutes is necessary.

PHIN implementation plan

PHIN implementation plan -2