WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 TEPPC March 25, CCPG Transmission Providers.
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
1 Joint Initiative Update WECC OPS Meeting San Diego, California February 2, 2010.
March 14, 2008 TEPPC Mtg WestConnect Subregional Planning Update Jerry D. Smith WestConnect Planning Manager.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
NORTHWEST POWER POOL Reliability Update
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WestConnect RTO Remarks of Charles Reinhold Project Manager FERC’s Regional Technical Conference Phoenix, Arizona September 24, 2003.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
EIM DISALLOWANCE CASE: PROGRESS IN THE SOUTHWEST Aka: Continued Assault.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Regional Transmission Service Tariff March 16, 2015.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Arizona Corporation Commission Energy Workshop February 16, 2001.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Electric Industry Overview: Municipal Electric Utilities Municipal Utilities are not-for-profit electric systems owned and operated by the people and.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Mountain West Transmission Group
WestConnect Joint Sub-Regional Planning Group Meeting August 18, 2016
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
WECC PCC Meeting July 15-16, 2014.
SunZia Project Description
WECC PCC Meeting July 15-16, 2014.
Forecasting and Operations CAISO Case
WestConnect Regional Transmission Service Tariff
Presentation transcript:

WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008

ACC BTA Workshop May 22, 2008 WestConnect Organization A Group of Transmission Owners in the Western Grid Organized under a Memorandum of Understanding Purposes: –Continue investigation of feasibility of cost-effective wholesale market enhancements –Work cooperatively with other Western Grid Organizations and market participants –Address seams issues in appropriate forums 2

WestConnect Arizona Public Service El Paso Electric Imperial Irrigation District Nevada Power Company Public Service Colorado Public Service New Mexico Sacramento Municipal Utility District Salt River Project Sierra Pacific Power Company TOTALS Jan ,000 MW of Load 34,000 Miles of Transmission Line 7.0 Million Retail Customers Served Southwest Transmission Cooperative Transmission Agency of Northern California Tri-State G & T Association Tucson Electric Power Western Area Power Administration - Rocky Mountain Region - Desert Southwest Region -Sierra Nevada Region -CRSP Management Office ACC BTA Workshop May 22,

WestConnect Transmission Footprint

ACC BTA Workshop May 22, 2008 Market Enhancement Initiatives Active Work Groups Regional Pricing Experiment Virtual Control Area Transmission Products (Conditional Firm) TTC/ATC Process Flow Based Market Initiatives Regional Transmission Planning 5

ACC BTA Workshop May 22, 2008 Regional Pricing Experiment Developed a proposed two-year experiment to eliminate rate pancaking for hourly non-firm transactions Preparing FERC filing package for submittal June 1 or shortly after Experiment to begin in early

ACC BTA Workshop May 22, 2008 Virtual Control Area Activities Joining NTTG Ace Diversity Interchange (ADI) Program – Q Western Wind & Solar Integration Study conducted by NREL to determine additional regulation enhancements Contingency reserve sharing analysis 7

Virtual Control Area Activities ADI ADI is the pooling of individual Area Control Errors (ACE) to take advantage of control area diversity By pooling ACE, participants will likely be able to: –Reduce control burden on individual control areas; –Reduce unnecessary generator control movement; –Reduce sensitivity to resources with potentially volatile output, such as wind projects, and, –Realize improvements in Control Performa.nce Standards 8

ACC BTA Workshop May 22, 2008 Virtual Control Area Activities ADI Hosted on British Columbia Transmission Corp EMS System Some WestConnect BAs have executed contract documents to join the program: APSNPCPNM PSCOSPPCSRP 9

ACC BTA Workshop May 22, 2008 Virtual Control Area Activities ADI Projected Operation Date: July 1, 2008 Additional WestConnect BAs considering participation See: _FtCollins_ pdf _FtCollins_ pdf for more detail on ADI operations 10

Virtual Control Area Activities Contingency Reserves Two existing reserve sharing groups in WestConnect footprint –Southern Reserve Sharing Group –Rocky Mountain Reserve Sharing Group Sharing between the groups historically limited by transfer capability Analysis of current potential under consideration 11

ACC BTA Workshop May 22, 2008 Transmission Products Developed regional business practices for conditional firm transmission service Early stages of assessment of potential for standardization of planning redispatch practices 12

ACC BTA Workshop May 22, 2008 TTC/ATC Process Annual workshop held May 21, 2008 Continuing efforts to make information available and responsive to stakeholders’ needs 13

14 WestConnect Subregional Planning Groups Colorado Coordinated Planning Group Southwest Area Transmission CCPG SWAT SIERRA New Area ? CCPG and SWAT act as WestConnect technical planning work groups for WestConnect planning area Coordinate Base Cases for use by all study participants Define subregional study plans, provide study resources, and perform studies Provide forum for coordination and peer review of planning studies and 10-year plans ACC BTA Workshop May 22, 2008

Annual Adequacy Study Purpose – test the adequacy of most recently published WestConnect Transmission Plan (excluding conceptual projects) A WestConnect-wide study utilizing the 5 th and 10 th year coordinated base cases Perform traditional N-0, N-1 and N-2 contingency outages Establish reliability risk of potential corridor outages with planned transmission projects in 10 th year Complete studies by August joint CCPG/SWAT meeting Deficiencies in plan noted with sufficient lead time for subregional planning participants to investigate solutions for inclusion in the 2008 WestConnect Transmission Plan

17 Biennial Long Range Study Purpose – Biennially explore conceptual long range transmission needs within WestConnect Planning Area. A Westconnect –wide study of contemporary issues facing the industry in the 10 th year and beyond. Utilizes the 10 th year coordinated base case with load forecasts and generation scenarios representative of the study time period. Study limited to power flow and only considers N-1 outages. Initial study has two fold objective: –Provide traditional transmission reliability oriented studies in response to the TEPPC economic transmission study results, –Study WestConnect-wide integration of renewable energy projects Complete initial study in 2009

18 Planned Projects by State State No. Projects Total Miles Estimated Cost (2008 $M) Arizona661,4032,331 California107591,593 Colorado161,8922,016 Nevada New Mex Texas55024 Multi-State000 TOTAL1064,636$ 6,969

19 Conceptual Projects by State State No. Projects Total Miles Estimated Cost (2008 $M) Arizona California11827 Colorado000 Nevada13170 New Mex Texas000 Multi-State33,8505,800 TOTAL224,256$ 6,204

ACC BTA Workshop May 22, 2008 Contacts and Information WestConnect ( Charles Reinhold – Project Manager