Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.

Slides:



Advertisements
Similar presentations
Chapter 16 Section 1.
Advertisements

Dr. Ruth Collins TrinityHaus
NGfL CYMRU GCaD FLOOR COVERINGS.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
How to build a bridge!.
Parts of typical slab formwork
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
NOVA Extrusion Test Results ─ Prototype Test Device.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Class Day Thirteen. Chapter 9 Stone & Concrete Masonry.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Adhesives and fasteners. Notes on adhesives The “best” when they work correctly; “worst” when they fail Determine the right adhesive for the job Prepare.
Concrete
Foundation Systems.
Hydraulics.
Civil Engineering Materials
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
What have we accomplished? STRENGTH OF MATERIALS
Chapter 18 Foundations.
Building Foundations Foundation Walls.
CRACK CONTROL IN CONCRETE MASONRY WALLS
Concrete Construction
Footings.
TABS II Installation Presentation. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Installation Presentation
Course No: CE 4000 INVESTIGATION ON THE PERFORMANCE OF BAMBOO REINFORCED CONCRETE BEAMS Supervised By: MUHAMMAD HARUNUR RASHID Presented By: MOHAMMAD TAREQ.
Balsa Glider Construction
Unit 4 Sections A7-A9 In which you will learn about:
The Waddell A-Truss Bridge
The kinetic theory is an explanation of how _______ in matter behave. Kinetic Theory 16.1.
Intro to Concrete 18.0 & 19.0 Class notes.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
The new technology for watertight construction joints
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Faults Earthquakes begin on a fault plane movement will not proceed smoothly away from the fault due to Changes along the length and depth of the fault.
Unit A: 1.4 Matter exists in different physical states
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Introduction to Manufacturing Processes Pt. 2 © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
Mechanical Tests on Structure Mechanical Tests are being started using real extrusions. Purpose of the tests are to evaluate the accuracy and validity.
L12 - FLUIDS-1 FLUIDS – liquids – gases sand, snow, or grain (granular materials) While kernels of corn are solid, they behave more like a liquid when.
Fork and Pallet Design Hans Jostlein March 13, 2007.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
ADHESIVES. TWO MAIN INGREDIENTS – RESIN – GLUE SOLID SOLVENT – KEEPS LIQUIFIED UNTIL APPLIED.
Sanitary Engineering Lecture 13
Epoxy for Microboone Cradle Attachment The Microboone detector tank will be supported by two cradles, made from dense poly-urethane (PU) foam. The cradles.
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
The Waddell A-Truss Bridge
Warm Vessel Leveling Islands (Piers)
THE SCIENCE OF SOLVENT WELDING
Composites.
Pressure vs height (solid CPA plane)
Far Detector Activities Late 2017 – Early 2018
Competency: Draw wall sections and details.
Flood: Build a Stronger Plinth
Balsa Glider Construction
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
Balsa Glider Construction
Limited Streamer Tube Project Summary
Balsa Glider Construction
Presentation transcript:

Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not uniform: 10/10/2015Grout test study results Hans Jostlein1

Floor pressure It is actually more complicated; there is partial force transmission through the webs, Except for the middle channel in the end cap. 10/10/2015Grout test study results Hans Jostlein2

There are two locations where grout can even out the pressure on the Extrusions: Between the block and the pallet (applies to IPND as well) Between the pallet and the hall floor (Applies to far detector only) 10/10/2015Grout test study results Hans Jostlein3

Why do we need grout ? The PVC block is stiff We always assumed a full support area There are several sources of imperfect alignment of the block components versus the pallet- or floor shape: 10/10/2015Grout test study results Hans Jostlein4

Geometrical Imperfections Non-square module bottoms (X and Y) Module bottoms misaligned (X and Y) Pallet construction tolerances Concrete floor not a perfect plane Cumulative error: Somewhere between 1/16” and 1/8” (my own wild guess) Risk: High Stress Points on the bottom glue joint may cause glue joint failure 10/10/2015Grout test study results Hans Jostlein5

Grout Requirements Long Service Life (no deterioration with time or oil soaking) No Creep (to avoid stresses during partial oil filling) Stiff (same reason) Easy to install Must flow easily Must provide very long pot life (Days ?) Must bear loads quickly (an hour or less ?) Does not require a tight seal to prevent leak-out Inexpensive (if possible) 10/10/2015Grout test study results Hans Jostlein6

Liquid Organic Grouts Commonly used for machinery Require leak-tight form Not easily used on far detector floor Load bearing setup time is much longer than the pot life Costly 10/10/2015Grout test study results Hans Jostlein7

Cement based grouts See DocDB # 581 (January 2006) for measurements Last for decades (centuries ?) Do not require leak tight forms Have the marvelous property of being Tixotropic: Behave like liquids when shaken or stirred Behave like solids when at rest 10/10/2015Grout test study results Hans Jostlein8

Typical mix Use “play-sand” as filler, add cement, mix Or, use premix, add water, and mix Fill into the gap “vibrate” with a long board until settled It can now bear the full load instantly Let cure (curing can be as short as 30 minutes, and can be tuned with additive for a “pot life” as long as 3 days) 10/10/2015Grout test study results Hans Jostlein9

Test assembly 10/10/2015Grout test study results Hans Jostlein10

Purpose of the Test Find out how hard or easy it is to fill the mortar in a tall gap with realistic block shape Check on resulting completeness and distribution of fill We covered the plywood wall with plastic foil to separate it from the mortar 10/10/2015Grout test study results Hans Jostlein11

Test Progress Everything worked pretty well on first try, Except we tried to vibrate the mortar with a ¼” stick, which was too wimpy On second try, used a 4” x 1/8” x 4 ft G10 strip, Which made the mortar flow perfectly 10/10/2015Grout test study results Hans Jostlein12

10/10/2015Grout test study results Hans Jostlein13

10/10/2015Grout test study results Hans Jostlein14

10/10/2015Grout test study results Hans Jostlein15 First try– not quite perfect

10/10/2015Grout test study results Hans Jostlein16 Second try—perfect matching to the plywood/ foil wall

Floor Grouting (Far Detector only) Place mortar on floor over the whole contact area Use a rake-type (maybe vibrating) tool to groove it deeply Set the block down with the block raiser During block alignment there is enough motion to re-liquefy the grout If not, just make a very small motion with the block raiser and set the block down Grout will set to full load bearing strength as soon as the motion stops 10/10/2015Grout test study results Hans Jostlein17

Floor Grout Test In Lab F (thanks, John Voirin !) we set a stack of three steel blocks on a grout bed The three blocks exerts the same floor pressure as the far detector We tested freshly mixed grout and day-old grout with Eucerin retarder mixed in We covered floor and top of mortar with a PE sheet for easy inspection and clean-up We installed 4 dial gauges to measure distance from floor to check for sagging 10/10/2015Grout test study results Hans Jostlein18

10/10/2015Grout test study results Hans Jostlein19 Sand mortar grout, shaped with a trowel

10/10/2015Grout test study results Hans Jostlein20 First block loaded onto grout bed, and equipped with dial gauges

10/10/2015Grout test study results Hans Jostlein21 Three blocks loaded. Droop motion is less than 10 mil

10/10/2015Grout test study results Hans Jostlein22 Grout after 3-day loading ; Middle is raised, matching bottom profile of the steel block

10/10/2015Grout test study results Hans Jostlein23 Grout with retarder, before loading

10/10/2015Grout test study results Hans Jostlein24 Grout after 3 days

Future Would like to use it on the mechanical prototype of the INPD Would like to use it on the FHEP (to test floor grouting, mostly) 10/10/2015Grout test study results Hans Jostlein25

Reference For earlier detailed emasurements on grout compressibility and load behavior see: NOVA Document 581-v1 10/10/2015Grout test study results Hans Jostlein26