Measurement Control and DAQ for Superconductors and Magnet labs SCLabs 20-05-09Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.

Slides:



Advertisements
Similar presentations
CAN bus 神戸大学 金子 敬宏.
Advertisements

PXI 总线技术. Overview PXI/CompactPCI Architecture Mechanical Electrical Software 3rd Party Support PICMG PXI Systems Alliance Configuring a PXI System Products.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Linux Migration GBT e2e Software Review May 3, 2005 Ramon Creager Melinda Mello
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Preliminary Design Review 11/11/05 Team Members: Michael Abbott,
Moore’s Law and Modular Instrument Technology Speaker/Author:Paul Packebush Senior Group Manager Corporate Metrology, R&D National Instruments N.
Upgrade Strategy. Audit YYou can’t always start from scratch with a new system. This in not cost effective or wise. Therefore you should do an audit.
Understanding Feasibility Reports TCO 341 Dr. Codone Fall 2002.
November 2009 Network Disaster Recovery October 2014.
National Institute Of Science & Technology GPIB Controllers Ashutosh Pradhan 1 EI DECEMBER-2004 GPIB CONTROLLERS Technical Seminar Presented By.
Hall Probe Calibration System
Single Board Computers and Industrial PC Hardware at the CLS
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
LXI Standard – Current and Future David Owen – Pickering Interfaces TC Chair LXI Consortium LXI – “It’s About Your Time”
A modern NM registration system capable of sending data to the NMDB Helen Mavromichalaki - Christos Sarlanis NKUA TEAM National & Kapodistrian University.
CERN A NOVEL PXI-BASED DATA ACQUISITION AND CONTROL SYSTEM FOR SINGLE STRETCHED WIRE MAGNETIC MEASUREMENTS FOR THE LHC MAGNETS: AN OPERATION TEAM PROPOSAL.
Christophe Martin / DQLPU Test Bench MPE-TM of 24/10/ DQLPU Functional Test Bench Front view Rear view.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
DAQ Cards, or Instruments The purpose of this presentation is to familiarize new Lab View users to the different computer aided test recourses available.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Networks.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
AT Measurement Systems
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Engineering H192 - Computer Programming Gateway Engineering Education Coalition Lab 1P. 1Winter Quarter Data Acquisition System Fundamentals Lab 1.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
PXI Systems - Discussions Gueorgui ANTCHEV / EP-ESSEPTAB Meeting February 2003Slide 1 of 3 PXI = Compact PCI + eXtensions for Instrumentation PXI is an.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Report on T1 and T2 DAQ A.Asahara, H.Kubo, D.Nishida 5/July/2002CANGAROO meeting.
The recent history and current state of the linac control system Tom Himel Dec 1,
NEPTUNE Power System Controller Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
An Overview of Support of Small Embedded Systems with Some Recommendations Controls Working Group April 14, 2004 T. Meyer, D. Peterson.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Control for CTP and LTU boards in Run
Industrial Control Engineering ADE Rapid Application Development Environment.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
Automation of the 27.1 kN Dead Weight Machine at NIST Kevin Chesnutwood, Samuel Ho NIST Mass and Force Group Stop 8222, 100 Bureau Drive Gaithersburg,
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
IT Architecture Technical blueprint for evolving a corporate infrastructure resource that can be shared by many users and services processing systems hardware.
Status of ELQA equipment and related software
Group Manager – PXI™/VXI Software
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
EN-ICE Technical Committee SM18 activities & projects
Measurement & Automation Explorer
Data Acquisition (DAQ)
Presentation transcript:

Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section

Outline Status of control and DAQ systems for SC cable and magnet measurements Maintenance plan (to keep present functionality) Development plan (to comply with new requirements and assure long term functionality) SCLabs Adriaan Rijllart2

Range of systems Fixed test systems – SM18, Block 4, B163 Mobile systems – SM18, Cryolab (B165) Not covered: systems for warm measurement such as for the Magnet Rescue Facility in B180, B181 and MQW in B867. SCLabs Adriaan Rijllart3

Fixed measurement systems: SCLabs Adriaan Rijllart4 Control Room Test Bench SM18

Fixed measurement systems: SCLabs Adriaan Rijllart5 B163Block 4

Mobile measurement systems: SCLabs Adriaan Rijllart6 Cryolab Mobile Bench SM18 High Voltage Test

Inventory of measurement systems TypeHardwareOSApplicationUnits Quench DAQSun + VMESolarisHFDAQ, LFDAQ7 Magnetic MSun + VMESolarisMMP16 High Voltage TSun + GPIBSolarisHVT6 Splice/LossSun + GPIBSolarisSRM/Loss2 Snapback MPXIPharlapB3B5 Snapback1 HTS DAQMac + SCXIMac OSHTS2 Correctors DAQMac + SCXIMac OSCQR2 Diode DAQPC + PCIWindowsDiode1 FRESCASun + GPIBSolarisFRESCA1 M(H)/RRR/RcSun + GPIBSolarisMagnetisation/RRR/Rc3 Critical currentSun + GPIBSolarisIC4 Mobile CryolabMac + PCIMac OSPMC7 Mechanical MPC + GPIBWindowsHBM? SCLabs Adriaan Rijllart7

Risk analysis of meas. systems SCLabs Adriaan Rijllart8 ConcernProblemImpactProbWght LabVIEW on Solaris Discontinued 5 years ago. But so far it keeps working. HighLow3 SolarisNo longer supported at CERN since 1 year.HighLow3 SBS34Discontinued 4 years ago. Porting to another module requires difficult work. MediumHigh6 BAB740Discontinued 4 years ago. BAB760 is produced and could replace the BAB740 with some work. MediumHigh6 VME30 years old standard. Becoming obsolete. Produced by few companies. Expensive. LowMedium2

Measurement system Sun-VME SCLabs Adriaan Rijllart9 Ethernet VME integrators Power Supply DVMs Loss M. Operator Console Quench DAQ Magnetic Measurement Sun VME ADCs

Upgrade to PXI SCLabs Adriaan Rijllart10 Ethernet IntegratorsDVMs Power Supply Operator Console Quench DAQ Magnetic Measurement ADCs

Partial upgrade, keeping some VME SCLabs Adriaan Rijllart11 Ethernet DVMs Operator Console Quench DAQ Magnetic Measurement ADCs VME Integrators

Reasons to adopt PXI Industry standard for instrumentation, based on PCI Supported by 60 vendors, commercialising >1000 modules PXI is 10 years old Smaller, cheaper than VME Key hardware features: triggering and synchronisation, shielding, speed (PXI-express, follows PCI express development) Key software features by National Instruments: LabVIEW, LabVIEW Real Time, integrated network communication, drivers Key OS features: Pharlap, VX-Works, Windows, Linux Connects to VME, which allows partial migration, keeping VME investment where needed SCLabs Adriaan Rijllart12

Maintaining present systems Step 1: Replace Sun with PXI, keep MXI-VME Advantages: Up to date LabVIEW version Up to date OS (no Solaris) Disadvantage: VME processors, modules and crates are kept (some are obsolete) SCLabs Adriaan Rijllart13

Upgrade plan Step 2: Replace VME with PXI More compact, higher density modules 3 VME crates with 56 modules Replace 5 VME ADC with 1 PXI ADC Higher performance ADCs Higher precision, up to 24 bit ADCs and 7 ½ digits DVMs Faster acquisition, if needed Maintenance advantages: No SBS, BAB, VME, MXI Disadvantage: higher cost SCLabs Adriaan Rijllart14

Cost and resources Maintenance planUnit cost CHF # unitsTotal cost CHFManpower ( ManMonths) SM18 + Block 4 replace Sun workstations 10 k36360 k6 B163 PXI systems10 k880 k1 SCLabs Adriaan Rijllart15 Upgrade planUnit cost CHF # unitsTotal cost CHFManpower (ManMonths) SM18 DAQ35 k7245 k12 SM18 MM?9?? Block 4 DAQ20 k240 k4 Block 4 MM?2?? B163 DVMs3 k1648 k4

Replacement of all Sun based systems All Sun based measurement systems will need to be replaced (B180 Magnet Rescue Facility, B181, B867, …) Not part of the SC laboratory review, but to be kept in mind My inventory has 90 Sun workstations SCLabs Adriaan Rijllart16

Recommendation Plan 1: maintenance. Replace all Sun measurement stations with PXI processors, keeping the VME crates and modules. Plan 2: upgrade. Develop one pilot DAQ system in PXI for validation. Replace all DAQ systems with PXI system. B163 Plan 1: maintenance, replace Sun workstations. Plan 2: replace DVMs with PXI if needed for higher speed. B165 Can be maintained as is (no Sun workstations) For new measurement systems PXI should be considered. SCLabs Adriaan Rijllart17